Tender Details

Particulars Details
Title
Making Arrangement Of Poking Of Silo Unloading Telescopic Chutes To Facilitate Smooth Unloading Of Ash From Silo During Monsoon Season Under Ahp Mm Stg I And Ii, Bktps.
Description
Making Arrangement Of Poking Of Silo Unloading Telescopic Chutes To Facilitate Smooth Unloading Of Ash From Silo During Monsoon Season Under Ahp Mm Stg I And Ii, Bktps.
Organisation THE WEST BENGAL POWER DEVELOPMENT CORPORATION LTD. | State Govt. and UT
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 0
EMD 9693
Tender Value
Place Bakreswar Thermal Power Project
Link

AAAAAAAAAA

Login to view
Start Date May 15, 2025 16:30
End Date

30/05/2025 ( 24 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Making arrangement of poking of silo unloading telescopic chutes to facilitate smooth unloading of ash from silo during monsoon season under ahp-mm stg i and ii, bktps.

Making arrangement of poking of silo unloading telescopic chutes to facilitate smooth unloading of ash from silo during monsoon season under ahp-mm stg i and ii, bktps.

Read more
Urgent maintenance of different embankment from the erosion of river manu under kailashahar municipal area during the year 2025 26 sh providing and placing gunny bag filled with sand gr. 2nd call i ii

Urgent maintenance of different embankment from the erosion of river manu under kailashahar municipal area during the year 2025 26 sh providing and placing gunny bag filled with sand gr. 2nd call i ii

Read more
Supply of wcl security, category ii, listed and listed i for watch and ward services under oil operational area under oil pipeline services in the state of assam for a period of 04 years from 01.07.2025 to 30.06.2029.

Supply of wcl security, category ii, listed and listed i for watch and ward services under oil operational area under oil pipeline services in the state of assam for a period of 04 years from 01.07.2025 to 30.06.2029.

Read more
Making of 03 nos of 8 inch dia ms pipeline range (welding of flanges, shifting, laying and jointing of pipes) from rvi to outside nallah discharge for smooth dewatering under s.b. project.

Making of 03 nos of 8 inch dia ms pipeline range (welding of flanges, shifting, laying and jointing of pipes) from rvi to outside nallah discharge for smooth dewatering under s.b. project.

Read more
Work of hammering and poking of coal bunker in all three shift during rainy season in unit 1,2,3 and 4 of ph-i n ph-ii at sstpp, mppgcl, dongalia, dist. khandwa

Work of hammering and poking of coal bunker in all three shift during rainy season in unit 1,2,3 and 4 of ph-i n ph-ii at sstpp, mppgcl, dongalia, dist. khandwa

Read more
Dewatering of water logging from different places in between ch. 13.10 kmp. to 14.70 kmp. of jessore road and airport slip road ch. 8.00 kmp. during monsoon under baguihati highway sub division

Dewatering of water logging from different places in between ch. 13.10 kmp. to 14.70 kmp. of jessore road and airport slip road ch. 8.00 kmp. during monsoon under baguihati highway sub division

Read more
Slip clearance work by back hoe loader and tracked hydraulic exacavator for smooth and safe traffic from km 0.00 to 93.00 stretch of nh-309 a during mansoon season 2025 -26 and upcoming duration.

Slip clearance work by back hoe loader and tracked hydraulic exacavator for smooth and safe traffic from km 0.00 to 93.00 stretch of nh-309 a during mansoon season 2025 -26 and upcoming duration.

Read more
Ar and mo various roads under division south west road-i during 2025-26. sh replacement of damaged/broken rcc drain and culvert slabs, p/l 200mm thick drain covers junction on girdhari lal goswami marg from post office to rob naraina under sub divis

Ar and mo various roads under division south west road-i during 2025-26. sh replacement of damaged/broken rcc drain and culvert slabs, p/l 200mm thick drain covers junction on girdhari lal goswami marg from post office to rob naraina under sub divis

Read more
Rearrangement and maintenance of 11kv overhead line from kdh old substation to rohini substation to ensure uninterrupted 11kv power supply during monsoon under rohini ocp, nk area

Rearrangement and maintenance of 11kv overhead line from kdh old substation to rohini substation to ensure uninterrupted 11kv power supply during monsoon under rohini ocp, nk area

Read more
Comprehensive repair and maintenance to various roads under division south road-2, pwd during 2025-26 and 2026-27. (sh_hiring and operating tractor mounted pto driven positive displacement rotary lobe pumps under sub division-i, ii,iii, and iv of

Comprehensive repair and maintenance to various roads under division south road-2, pwd during 2025-26 and 2026-27. (sh_hiring and operating tractor mounted pto driven positive displacement rotary lobe pumps under sub division-i, ii,iii, and iv of

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise