Tender Details

About Tender

🏗️ Moil Limited Invites Bids For Additional Excavation Services At Ug Stopes And Leading Mining Areas In The 2nd Quadrilateral Of The Coal Block. 🔨 🗓️ Bid Submission Deadline: June 21, 2024, 1:00 Pm This Is An Opportunity For Experienced Contractors To Contribute To The Mining Operations Of Moil Limited. Interested Bidders Should Submit Detailed Proposals, Including Technical Capabilities, Experience, And Financial Bids, By The Specified Deadline. Keywords: Moil Limited, Excavation Services, Coal Mining, Government Tender, Mining Operations, Bid Submission, Contractors
Particulars Details
Title
Custom Bid For Services Additional Excavation In Rock At Ug Stopes And Leading Mining Area In 2nd
Description
Organisation MOIL Limited | Ministry of Steel
Tender Id GEM/2024/B/4999495
Reference
Number
-
Tender Fee -
EMD -
Tender Value -
Place
Link
View Original Tender Notice

https://bidplus.gem.gov.in/all-bids

Start Date May 31, 2024 17:12
End Date
Expired 21/06/2024

Expired 842 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Award of Contract & Bid Results

Awarded Contractor / Winner

A K Enterprises

Contract Value

19723076

Tender Status: active
Additional Information: Average Turn Over of Last 3 Years: Lakhs Experience with Gov. Required: Years Project Experience Required: No
Buyer Name: Vinay Vishwanath Wagh
Ministry: Ministry Of Steel
Department: Moil Limited
Organisation: Moil Limited

Technical Evaluation Results

S.No. Seller Name Participated On EMD Status MSE/MII Status Status
1 A K Enterprises 21-06-2024 12:23:39 Registered with designated Agency / Authority MSE Qualified
2 S MALLIC AND SON'S 21-06-2024 11:59:34 Registered with designated Agency / Authority MSE Qualified
3 SHREE GANESH ENTERPRISES 21-06-2024 12:22:34 Registered with designated Agency / Authority MSE Qualified

Ordered Items & Contract Pricing

Service Category Name Ordered Quantity Price
Custom Bid for Services - Additional excavation in Rock at UG stopes and leading mining area in 2nd and night shifts south sections at all working levels of Balaghat Mine Quantity as per tender document Custom Bid for Services 1 ₹ 19723076.000
Similar Tenders
Providing of 2nd run ug cable for the existing 33kv industrial area feeder from 132/33kv fever hospital eht sub station to 33/11kv industrial area ss which involves laying of 1.87km of 33kv 3x400sq.mm xlpe ug cable (single run) in lines division of hyderabad south and the work executed by the master plan sd-ii of division-ii in master plan hyderabad circle under t and d improvements to original works (reserved for waddera/sagara category).

Providing of 2nd run ug cable for the existing 33kv industrial area feeder from 132/33kv fever hospital eht sub station to 33/11kv industrial area ss which involves laying of 1.87km of 33kv 3x400sq.mm xlpe ug cable (single run) in lines division of hyderabad south and the work executed by the master plan sd-ii of division-ii in master plan hyderabad circle under t and d improvements to original works (reserved for waddera/sagara category).

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.

Read more
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in

Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.

Read more
Providing of 2nd alternate source to 33/11kv srinagar colony indoor ss from 132/33kv nims eht ss by laying of 4.5 km single run 33kv 400sqmm xlpe ug cable pertaining to kalyan nagar lines section and sub division of banjarahills lines division of scada circle and work executed by the master plan sd-iv section and sub-division of mp-1 division of hyderabad master plan circle under t and d improvement works

Providing of 2nd alternate source to 33/11kv srinagar colony indoor ss from 132/33kv nims eht ss by laying of 4.5 km single run 33kv 400sqmm xlpe ug cable pertaining to kalyan nagar lines section and sub division of banjarahills lines division of scada circle and work executed by the master plan sd-iv section and sub-division of mp-1 division of hyderabad master plan circle under t and d improvement works

Read more
Providing of 2nd alternate source to 33/11kv kundanbagh indoor ss by laying of 1.2km 33kv 3x400sq.mm. xlpe ug cable (double run) from 33/11kv green lands ss to 33/11kv kundanbagh indoor ss pertaining to allwyn lines section and sub division of banjara hills lines division of scada circle and work executed by the master plan sd-iv section and sub-division of mp-1 division of master plan hyderabad circle under t and d improvements to original works (reserved for sc categ

Providing of 2nd alternate source to 33/11kv kundanbagh indoor ss by laying of 1.2km 33kv 3x400sq.mm. xlpe ug cable (double run) from 33/11kv green lands ss to 33/11kv kundanbagh indoor ss pertaining to allwyn lines section and sub division of banjara hills lines division of scada circle and work executed by the master plan sd-iv section and sub-division of mp-1 division of master plan hyderabad circle under t and d improvements to original works (reserved for sc category).

Read more
Additional excavation in manganiferous rock at all working stopes/leading mining area in all working levels (all three shifts) at balaghat mine.

Additional excavation in manganiferous rock at all working stopes/leading mining area in all working levels (all three shifts) at balaghat mine.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise