🏗️ Moil Limited Invites Bids For Additional Excavation Services At Ug Stopes And Leading Mining Areas In The 2nd Quadrilateral Of The Coal Block. 🔨 🗓️ Bid Submission Deadline: June 21, 2024, 1:00 Pm This Is An Opportunity For Experienced Contractors To Contribute To The Mining Operations Of Moil Limited. Interested Bidders Should Submit Detailed Proposals, Including Technical Capabilities, Experience, And Financial Bids, By The Specified Deadline. Keywords: Moil Limited, Excavation Services, Coal Mining, Government Tender, Mining Operations, Bid Submission, Contractors| Particulars | Details |
|---|---|
| Title |
Custom Bid For Services Additional Excavation In Rock At Ug Stopes And Leading Mining Area In 2nd
|
| Description |
|
| Organisation | MOIL Limited | Ministry of Steel |
| Tender Id | GEM/2024/B/4999495 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | May 31, 2024 17:12 |
| End Date |
Expired
21/06/2024
Expired 842 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
A K Enterprises
19723076
Technical Evaluation Results
| S.No. | Seller Name | Participated On | EMD Status | MSE/MII Status | Status |
|---|---|---|---|---|---|
| 1 | A K Enterprises | 21-06-2024 12:23:39 | Registered with designated Agency / Authority | MSE | Qualified |
| 2 | S MALLIC AND SON'S | 21-06-2024 11:59:34 | Registered with designated Agency / Authority | MSE | Qualified |
| 3 | SHREE GANESH ENTERPRISES | 21-06-2024 12:22:34 | Registered with designated Agency / Authority | MSE | Qualified |
Ordered Items & Contract Pricing
| Service | Category Name | Ordered Quantity | Price |
|---|---|---|---|
| Custom Bid for Services - Additional excavation in Rock at UG stopes and leading mining area in 2nd and night shifts south sections at all working levels of Balaghat Mine Quantity as per tender document | Custom Bid for Services | 1 | ₹ 19723076.000 |
Providing of 2nd run ug cable for the existing 33kv industrial area feeder from 132/33kv fever hospital eht sub station to 33/11kv industrial area ss which involves laying of 1.87km of 33kv 3x400sq.mm xlpe ug cable (single run) in lines division of hyderabad south and the work executed by the master plan sd-ii of division-ii in master plan hyderabad circle under t and d improvements to original works (reserved for waddera/sagara category).
Providing of 2nd run ug cable for the existing 33kv industrial area feeder from 132/33kv fever hospital eht sub station to 33/11kv industrial area ss which involves laying of 1.87km of 33kv 3x400sq.mm xlpe ug cable (single run) in lines division of hyderabad south and the work executed by the master plan sd-ii of division-ii in master plan hyderabad circle under t and d improvements to original works (reserved for waddera/sagara category).
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.
Read moreProviding of 2nd alternate source to 33/11kv srinagar colony indoor ss from 132/33kv nims eht ss by laying of 4.5 km single run 33kv 400sqmm xlpe ug cable pertaining to kalyan nagar lines section and sub division of banjarahills lines division of scada circle and work executed by the master plan sd-iv section and sub-division of mp-1 division of hyderabad master plan circle under t and d improvement works
Providing of 2nd alternate source to 33/11kv srinagar colony indoor ss from 132/33kv nims eht ss by laying of 4.5 km single run 33kv 400sqmm xlpe ug cable pertaining to kalyan nagar lines section and sub division of banjarahills lines division of scada circle and work executed by the master plan sd-iv section and sub-division of mp-1 division of hyderabad master plan circle under t and d improvement works
Read moreProviding of 2nd alternate source to 33/11kv kundanbagh indoor ss by laying of 1.2km 33kv 3x400sq.mm. xlpe ug cable (double run) from 33/11kv green lands ss to 33/11kv kundanbagh indoor ss pertaining to allwyn lines section and sub division of banjara hills lines division of scada circle and work executed by the master plan sd-iv section and sub-division of mp-1 division of master plan hyderabad circle under t and d improvements to original works (reserved for sc categ
Providing of 2nd alternate source to 33/11kv kundanbagh indoor ss by laying of 1.2km 33kv 3x400sq.mm. xlpe ug cable (double run) from 33/11kv green lands ss to 33/11kv kundanbagh indoor ss pertaining to allwyn lines section and sub division of banjara hills lines division of scada circle and work executed by the master plan sd-iv section and sub-division of mp-1 division of master plan hyderabad circle under t and d improvements to original works (reserved for sc category).
Read moreCustom bid for services - additional excavation in rock at ug stopes and leading mining area in 2nd
Read more
Custom bid for services - additional excavation in rock at ug stopes and leading mining area in 2nd
Read more
Custom bid for services - additional excavation in rock at ug stopes and leading mining area in 2nd
Read more
Additional excavation in manganiferous rock at all working stopes/leading mining area in all working levels (all three shifts) at balaghat mine.
Additional excavation in manganiferous rock at all working stopes/leading mining area in all working levels (all three shifts) at balaghat mine.
Read moreof your Industry type