Providing Of 2nd Alternate Source To 33/11 Kv Srinagar Colony Indoor Ss From 132/33 Kv Nims Eht Ss By Laying Of 4.5 Km Single Run 33 Kv 400 Sqmm Xlpe Ug Cable Pertaining To Kalyan Nagar Lines Section And Sub Division Of Banjarahills Lines Division Of Scada Circle And Work Executed By The Master Plan Sd Iv Section And Sub Division Of Mp 1 Division Of Hyderabad Master Plan Circle Under T And D Improvement Works
|
| Description |
Providing Of 2nd Alternate Source To 33/11 Kv Srinagar Colony Indoor Ss From 132/33 Kv Nims Eht Ss By Laying Of 4.5 Km Single Run 33 Kv 400 Sqmm Xlpe Ug Cable Pertaining To Kalyan Nagar Lines Section And Sub Division Of Banjarahills Lines Division Of Scada Circle And Work Executed By The Master Plan Sd Iv Section And Sub Division Of Mp 1 Division Of Hyderabad Master Plan Circle Under T And D Improvement Works
|
| Organisation | SOUTHERN POWER DISTRIBUTION COMPANY OF TELANGANA L-CGM-Master Plan&Lines |
| Tender Id | 737272 |
|
Reference Number |
BID No. Chief Engineer/Master Plan /GH/TGSPDCL:29 /2026-27 |
| Tender Fee | - |
| EMD | - |
| Tender Value | 85.6 Lakh |
| Place | Telangana |
| Link |
View Original Tender Notice
https://tender.telangana.gov.in/TenderDetailsHome.html |
| Start Date | September 26, 2026 21:30 |
| End Date |
Expired
12/10/2026
Expired 4 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Providing of 2nd run ug cable for the existing 33kv industrial area feeder from 132/33kv fever hospital eht sub station to 33/11kv industrial area ss which involves laying of 1.87km of 33kv 3x400sq.mm xlpe ug cable (single run) in lines division of hyderabad south and the work executed by the master plan sd-ii of division-ii in master plan hyderabad circle under t and d improvements to original works (reserved for waddera/sagara category).
Providing of 2nd run ug cable for the existing 33kv industrial area feeder from 132/33kv fever hospital eht sub station to 33/11kv industrial area ss which involves laying of 1.87km of 33kv 3x400sq.mm xlpe ug cable (single run) in lines division of hyderabad south and the work executed by the master plan sd-ii of division-ii in master plan hyderabad circle under t and d improvements to original works (reserved for waddera/sagara category).
Read moreErection of 33/11 kv indoor ss with 1x16 mva ptr and connected 33kv feeders - 2 nos. 11kv feeders with 4 nos. and construction of control room, compound wall at sagar x road ss at bairamalguda section of vanastalipuram subdivision in champapet division of saroornagar circle in ecgh master plan division in rangareddy circle under t and d improvement works
Erection of 33/11 kv indoor ss with 1x16 mva ptr and connected 33kv feeders - 2 nos. 11kv feeders with 4 nos. and construction of control room, compound wall at sagar x road ss at bairamalguda section of vanastalipuram subdivision in champapet division of saroornagar circle in ecgh master plan division in rangareddy circle under t and d improvement works
Read moreDe-paralleling of 2nos. 80mva ptrs and erection of new 33kv pt set to 33kv bus section-iii and erection of 100kva station transformer at 132kv ss asifnagar in omc/metro-cetnral circle/metro zone-i
De-paralleling of 2nos. 80mva ptrs and erection of new 33kv pt set to 33kv bus section-iii and erection of 100kva station transformer at 132kv ss asifnagar in omc/metro-cetnral circle/metro zone-i
Read moreEstimate for interlinking of 33kv uttaraspally feeder and 33kv kv chowderguda feeder for providing of alternate power suplly to thummalapally ss, veerannapet and chowderguda ss during break downs and other maintainance works in kondurg section in shadanagar sub division in shadnagar division in rajendranagar circle under summer action plan.
Estimate for interlinking of 33kv uttaraspally feeder and 33kv kv chowderguda feeder for providing of alternate power suplly to thummalapally ss, veerannapet and chowderguda ss during break downs and other maintainance works in kondurg section in shadanagar sub division in shadnagar division in rajendranagar circle under summer action plan.
Read moreErection of 1 no. 33kv switching station m/s. phoenix spaces pvt. ltd, puppalaguda[v] in ibrahimbagh sub division of cybercity circle with 1 no.s 33kv sources in operation division, ibrahimbagh pertaining to master plan sd-2 of ecgh division in ranga reddy circle" under t and d improvement works
Erection of 1 no. 33kv switching station m/s. phoenix spaces pvt. ltd, puppalaguda[v] in ibrahimbagh sub division of cybercity circle with 1 no.s 33kv sources in operation division, ibrahimbagh pertaining to master plan sd-2 of ecgh division in ranga reddy circle" under t and d improvement works
Read moreErection of new 33/11kv outdoor substation and construction of control room, compound wall and other civil works at sy no. 12, gajularamaram (near oxygen park) with 1x16 mva ptr, connected 33kv and 11 kv lines in gajularamaram section of qutbullapur sub-division in medchal division of medchal operation circle, in master plan sub-division 2 of wcgh division in ranga reddy master plan circle under t and d improvement works
Erection of new 33/11kv outdoor substation and construction of control room, compound wall and other civil works at sy no. 12, gajularamaram (near oxygen park) with 1x16 mva ptr, connected 33kv and 11 kv lines in gajularamaram section of qutbullapur sub-division in medchal division of medchal operation circle, in master plan sub-division 2 of wcgh division in ranga reddy master plan circle under t and d improvement works
Read moreErection of new 33/11kv outdoor substation and construction of control room, compound wall and other civil works at sy no. 62 of hmda layout in medipally with 1x16 mva ptr, connected 33kv and 11 kv lines in narapally section of ghatkesar sub-division in keesara division of habsiguda operation circle, in master plan sub-division 2 of wcgh division in rangareddy master plan circle under t and d improvement works.
Erection of new 33/11kv outdoor substation and construction of control room, compound wall and other civil works at sy no. 62 of hmda layout in medipally with 1x16 mva ptr, connected 33kv and 11 kv lines in narapally section of ghatkesar sub-division in keesara division of habsiguda operation circle, in master plan sub-division 2 of wcgh division in rangareddy master plan circle under t and d improvement works.
Read moreBifurcation of 11kv lucid feeder originally emanating from 33/11kv command control room substation by erection of 1 no new 11kv feeder from the 33/11kv road no.2 ss by utilization of 11kv indoor breaker in the 33/11kv road no.2 ss which includes laying of 0.6 km of 11kv 3x300 sq.mm of xlpe ug cable(double run) in banjara hills section of banjara hills subdivision of banjarahills division and the work executed by the construction wing of banjara hills division of banjara hills circle
Bifurcation of 11kv lucid feeder originally emanating from 33/11kv command control room substation by erection of 1 no new 11kv feeder from the 33/11kv road no.2 ss by utilization of 11kv indoor breaker in the 33/11kv road no.2 ss which includes laying of 0.6 km of 11kv 3x300 sq.mm of xlpe ug cable(double run) in banjara hills section of banjara hills subdivision of banjarahills division and the work executed by the construction wing of banjara hills division of banjara hills circle
Read moreErection of 33/11kv substation with connected 33kv and 11kv lines at thatipally (v) in sirikonda (m) of dichpally division of nizamabad circle under t and d/ si scheme on partial turnkey basis..
Erection of 33/11kv substation with connected 33kv and 11kv lines at thatipally (v) in sirikonda (m) of dichpally division of nizamabad circle under t and d/ si scheme on partial turnkey basis..
Read moreErection of 33/11kv substation with connected 33kv and 11kv lines at lingapoor (v) in lingapoor mandal of asifabad division of operation circle asifabad under t and d/ si scheme on partial turnkey basis.
Erection of 33/11kv substation with connected 33kv and 11kv lines at lingapoor (v) in lingapoor mandal of asifabad division of operation circle asifabad under t and d/ si scheme on partial turnkey basis.
Read moreof your Industry type