Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Shifting Of L Xing No. 249 In C/W Construction Of Approach Of Rob In Lieu Of L Xing No. 249/C At Km:1124/13 16 On Lko Mb Section Near Sandila Town.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 83523647 |
|
Reference Number |
SNT-LC-249-ROB-MB-2025-26 |
| Tender Fee | 0 |
| EMD | 24300 |
| Tender Value | - |
| Place | New Delhi |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/092025/83523647/viewNitPdf_5068893.pdf |
| Start Date | August 08, 2025 23:23 |
| End Date |
Expired
08/09/2025
Expired 404 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Electrification work at rob in lieu of l-xing no.-84ac (phase-ii)
Electrification work at rob in lieu of l-xing no.-84ac (phase-ii) at km. 177/13-15 on meerut-saharanpur rail section on khanalampura yard to dm awas in distt.-saharanpur
Read moreConstruction of 4 robs: (i) 2 lane rob on cost sharing basis in lieu of level crossing no. 61-b (including lhs) at km 123/8-9 near mau aimma(mem) station on pratapgarh-phaphamau section of lko division of northern railway, (ii) 2 lane rob in lieu of level crossing no. 59/b (including lhs) on gajarola-muazzampur section of moradabad division of northern railway, (iii) 2 lane rob in lieu of lc no.32/a (including lhs) at k.m. 53.819 between kbe-sln railway station on ayc-sln section of lucknow d
Construction of 4 robs: (i) 2 lane rob on cost sharing basis in lieu of level crossing no. 61-b (including lhs) at km 123/8-9 near mau aimma(mem) station on pratapgarh-phaphamau section of lko division of northern railway, (ii) 2 lane rob in lieu of level crossing no. 59/b (including lhs) on gajarola-muazzampur section of moradabad division of northern railway, (iii) 2 lane rob in lieu of lc no.32/a (including lhs) at k.m. 53.819 between kbe-sln railway station on ayc-sln section of lucknow d
Read moreShifting of 11kv line, lt line and transformer during work of construction of road and retaining wall for approach road of newly constructed bridge in u/s of dehradun ambala road xing in district saharanpur
Shifting of 11kv line, lt line and transformer during work of construction of road and retaining wall for approach road of newly constructed bridge in u/s of dehradun ambala road xing in district saharanpur
Read moreRehabilitation, special strengthening and repair of bridges work. (package-1 bhopal) (i) special strengthening of rob in lieu of lc 237 budhni, dist sehore (ii) renewal/strengthening of approach road high level bridge across narmada river near anwali
Rehabilitation, special strengthening and repair of bridges work. (package-1 bhopal)
Read moreConstruction of road over bridge (full rob) in lieu of level crossing no. am -34 at km -323/14-15 between jamadoba -bhaga station under adra division, road over bridge (only approach portion) in lieu of level crossing no. 239 at rly. km. 149/29-31 between railway station tangarmunda-dharuadihi at bamra railway station yard under chakradharpur division , road over bridge (only approach portion) in lieu of level crossing no. 256 at rly. km. 510/12-14 between railway station dhutra-jharsuguda in
Construction of road over bridge (full rob) in lieu of level crossing no. am -34 at km -323/14-15 between jamadoba -bhaga station under adra division, road over bridge (only approach portion) in lieu of level crossing no. 239 at rly. km. 149/29-31 between railway station tangarmunda-dharuadihi at bamra railway station yard under chakradharpur division , road over bridge (only approach portion) in lieu of level crossing no. 256 at rly. km. 510/12-14 between railway station dhutra-jharsuguda in
Read moreConstruction of 2 lane rob in lieu of lc no.162 as 1x36.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards kolar) + 2x18.71m psc girder+1x10.5m rcc slab (towards bangarpet) (approach span) + re blocks and retaining wall (approach portion)at km 144/900-145/000 and construction of pedestrian subway between bwt-kqz stations of ynk-bwt section of sbc division. (composite work)
Construction of 2 lane rob in lieu of lc no.162 as 1x36.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards kolar) + 2x18.71m psc girder+1x10.5m rcc slab (towards bangarpet) (approach span) + re blocks and retaining wall (approach portion)at km 144/900-145/000 and construction of pedestrian subway between bwt-kqz stations of ynk-bwt section of sbc division. (composite work)
Read moreConstruction of 2 lane rob in lieu of lc no.1 as 1x30.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards amaravathy nagar) + 2x18.71m psc girder+1x10.5m rcc slab (towards desihalli)(approach span)+ re blocks and retaining wall (approach portion)) at km 1/800-900 along with lhs between bwt-col stations of bwt-mkm section of sbc division. (composite work)
Construction of 2 lane rob in lieu of lc no.1 as 1x30.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards amaravathy nagar) + 2x18.71m psc girder+1x10.5m rcc slab (towards desihalli)(approach span)+ re blocks and retaining wall (approach portion)) at km 1/800-900 along with lhs between bwt-col stations of bwt-mkm section of sbc division. (composite work)
Read moreTrd work against various engg works over firozpur division in c/w (i)- elimination of manned l-xing no. s-63 at km 433/27-28 by providing limited height subway of internal size 5m x 5m on juc-bes section (between juc-srx) by pushing method in the section under aden/juc (ii)- provision of 3.00m wide covered light weight rob near lc no. s-3 on ldh-dui section under aden/ldh, (iii)- construction of 5m x 3.5m lhs in lieu of closed level crossing no. c-7 on juc-nro section by pushing method under a
Trd work against various engg works over firozpur division in c/w (i)- elimination of manned l-xing no. s-63 at km 433/27-28 by providing limited height subway of internal size 5m x 5m on juc-bes section (between juc-srx) by pushing method in the section under aden/juc (ii)- provision of 3.00m wide covered light weight rob near lc no. s-3 on ldh-dui section under aden/ldh, (iii)- construction of 5m x 3.5m lhs in lieu of closed level crossing no. c-7 on juc-nro section by pushing method under a
Read moreUtility shifting in connection with rob construction work at rob 342 between stations miranpur katra and bilpur in section mb-lko
For complete deion and other details, please refer to tender
Read moreS&t work of utility shifting i.c.w construction of rob in lieu l-xing no 36/b at km 69/13-14 on ch-aljn section and l-xing no. 352 c class at km 1288/17-19 in pitambarpur station yard on lko-mb section of moradabad division of northern railway
For complete deion and other details, please refer to tender
Read moreof your Industry type