Tender Details
Particulars | Details |
---|---|
Title |
Sw I: Has Majn Section: Ancillary Works For Improvements To Road To Rub No. 628 A At Km. 173/400 500 In Aden/Sklr Sub Division.
Sw Ii: Has Majn Section: Replacement Of Existing Shallow Type Girder In Bridge No.473 (1x7.310m) At Km.129/000 100 With Rcc Box Of Size 1x7.50x4.65m Between Knyr Nrj Stations.(Rolling/Launching Method)
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 77147856 |
Reference Number |
20MYS24of11-09-24itemno3 |
Tender Fee | 0 |
EMD | 4.25 Lakh |
Tender Value | |
Place | Hubli |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/102024/77147856/viewNitPdf_4698770.pdf |
Start Date | September 11, 2024 22:48 |
End Date |
04/10/2024 ( Expired 199 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Tumkuru-arsikere section: proposed construction of rob in lieu of lc no. 88 at km:149/900-150/000 with 1x30m bow-string girder and 2x18.71m psc girder re blocks (approach span) between tiptur and honnavalli road stations.
For complete deion and other details, please refer to tender
Read moreHyb divn :- jkm-bdhn section:- elimination of manned level crossing gate no 4/jb at km 5/500-550 by providing rub between jkm-bdhn stations.
For complete deion and other details, please refer to tender
Read moreBengaluru division: balance work of replacement of steel girder with psc slab for bridge no. 550 at km 45/400-500 between ramanagaram (rmgm) -channapatna (cpt) stations in sbc - mys section. maintenance period is 3 months.
For complete deion and other details, please refer to tender
Read more1) provision of power supply arrangements for the newly manned lc gates no. 122 between bgpa - hht, lc no. 134 between bntl - padl, lc no. 136 between srf - tlgp and lc no. 121 between anf - srf (total 4 nos.) over mys div. 2) has-majn section - elimination of lc no. 59 at km 103/300-400 and lc no. 62 at km 104/300-400 between sbhr - ydm stations by construction of low cost rob s. 3) has-majn section - elimination of lc no. 97 at km 131/400-500 and lc no. 101 at km 134/200-300 between nrj
For complete deion and other details, please refer to tender
Read moreConstruction of 2 lane rob in lieu of lc no.35 at km. 62/400-500 with 1x60m bowstring girder (railway portion) 10x18.71m psc girder24.945 mtr psc solid slab towards nh-48 side and 6x18.71m psc girder1x16.33 mtr psc solid slab towards mydala side and retaining wall on both sides of rob merging lengths between kyathasandra and nidavanda stations and construction of lhs in lieu of lc 35 at km 62/400-500 as 1x5.5x2.5m rcc box including electrical works- composite work.
For complete deion and other details, please refer to tender
Read more1. sw-i sc division: kzj-bza section - provision of additional vent way to bridge no. 569 a (up & dn line portion) as precast rcc box of size 2 x 5.50x3.00m at km 430/10-12 between kesamudram - tadalapusapalli stations by air pushing method using 20.40m rh girder. 2. sw-ii sc division: kzj-bza section - provision of additional vent way to bridge no. 569 b (up & dn line portion) as precast rcc box of size 2 x 5.50x3.00m at km 430/18-20 between kesamudram - tadalapusapalli station
For complete deion and other details, please refer to tender
Read moreHubballi division: strengthening of super structure by re-girdering of br no. 142/a (span 1x13.18m pg rub) at km 680/500-600 between gpb-ckr stations in ld-mrj section of ubl division.
For complete deion and other details, please refer to tender
Read moreChikbanavara - hassan section : sw i : construction of rcc drain for a length of 2.2 km in scattered locations between km 5/500-55/300 in aden/kunnigal section. sw ii : construction of rcc side drain 1000m and ballast retaining wall 1000m in connection with the work of baw-has : through ballast recoupment for a length of 110km from km 14/000-124/000 (sl). maintenance period is 6 months
For complete deion and other details, please refer to tender
Read moreBengaluru salem section : sw i : slope stabilization by widening of slopes of cuttings from km 51/940-52/100, 52/550-800, 52/900-53/040 in sse/pway/dharmapuri (south) section. sw ii : slope stabilization by widening of slopes in cuttings from km 111/000-112/400, 127/630-800, 129/400-130/000 and 137/100-200 in aden/dharmapuri section. maintenance period is 6 months or one monsoon period whichever is later. (two packet system)
For complete deion and other details, please refer to tender
Read moreHyderabad division: (1) replacement of mechanically operated lifting barrier (molb) with electrically operated lifting barrier (eolb) at 9 nos. of lc gate nos.190a, 191, 193, 219, 228, 60, 60a,61 & 127. (2) sc-dhne section: elimination of manned lc gate no. 68 at km no. 126/500-600 by providing rub between mbnr-mqn stations, (3) sc-dhne section: elimination of manned lc gate no. 138 at km no. 253/100-200 by providing rub between krnt-duu stations, (4) sc-mue section: proposal for construct
For complete deion and other details, please refer to tender
Read moreof your Industry type