Tender Details

Particulars Details
Title
Has Majn Section: Estimate Of Complete Bridge Channel Sleeper Renewal With H Beam Sleeper For Bridges In Has Sklr And Sbhr Padil Plain Section
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 78322685
Reference
Number
26MYS24of15-11-24itemno3
Tender Fee 0
EMD 6.63 Lakh
Tender Value
Place Hubli
Link https://www.ireps.gov.in/ireps/works/pdfdocs/122024/78322685/viewNitPdf_4765474.pdf
Start Date November 15, 2024 23:38
End Date

09/12/2024 ( Expired 133 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Consultancy services for ae for supervision of rehabilitation and upgradation from of kolde to visarwadi (near junction with nh-6) section of nh752g (total length -4.40) to 2lps/ four lanes in the state of maharashtra on epc mode.

Consultancy services for ae for supervision of rehabilitation and upgradation from of kolde to visarwadi (near junction with nh-6) section of nh752g (total length -4.40) to 2lps/ four lanes in the state of maharashtra on epc mode.

Read more
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.

Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.

Read more
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to 2l with ps configuration in the state of madhya pradesh on epc mode

Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to 2l with ps configuration in the state of madhya pradesh on epc mode

Read more
Deployment of maintenance teams for maintenance of ofc cable network and upkeep of associated gears/equipment for a period of 2 year and extendable by one year on same terms and conditions in basin bridge arakkonam renigunta section

Deployment of maintenance teams for maintenance of ofc cable network and upkeep of associated gears/equipment for a period of 2 year and extendable by one year on same terms and conditions in basin bridge arakkonam renigunta section

Read more
All-in-one desktops for different departments of the university with complete commissioning and installation on site

All-in-one desktops for different departments of the university with complete commissioning and installation on site

Read more
Construction of 2-lane with paved shoulder greenfield bypass for lalganj ajhara-mohanganj and raniganj on raebareli-jaunpur section (design km 0.000 to 53.177) of nh 31 in the state of uttar pradesh on hybrid annuity mode

Construction of 2-lane with paved shoulder greenfield bypass for lalganj ajhara-mohanganj and raniganj on raebareli-jaunpur section (design km 0.000 to 53.177) of nh 31 in the state of uttar pradesh on hybrid annuity mode

Read more
Annual cleaning of 14 nos weigh bridges platform with control room and under the weigh bridge structure at balram ocp under hingula area (for a period of 730 days).

Annual cleaning of 14 nos weigh bridges platform with control room and under the weigh bridge structure at balram ocp under hingula area (for a period of 730 days).

Read more
Providing installing and commissioning of online continuous monitoring system probe type at the outlet of stp for parameters cod bod tss ph with one year data connectivity to ppcb cpcb with calibrations services complete in all respect

Providing installing and commissioning of online continuous monitoring system probe type at the outlet of stp for parameters cod bod tss ph with one year data connectivity to ppcb cpcb with calibrations services complete in all respect

Read more
Rehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode

Rehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise