Tender Details
Particulars | Details |
---|---|
Title |
Construction Of R.C.C. Gutter At Shindewadi Tal Karveer Dist Kolhapur 1)main Road Length 350 Metre Lat 16.716752 Long 74.149332 2)lakhe Galli 50 Metre Length Lat 16.71754 Long 74.152092
|
Description |
Construction Of R.C.C. Gutter At Shindewadi Tal Karveer Dist Kolhapur 1)main Road Length 350 Metre Lat 16.716752 Long 74.149332 2)lakhe Galli 50 Metre Length Lat 16.71754 Long 74.152092
|
Organisation | Government of Maharashtra |
Tender Id | 2023_KOLHA_939094_10 |
Reference Number |
E TENDER NOTICE NO 48-01/2023-24 |
Tender Fee | 2000 |
EMD | 14990 |
Tender Value | |
Place | Office of The E E Works Dept. Z P Kolhapur |
Link | https://mahatenders.gov.in |
Start Date | August 28, 2023 16:30 |
End Date |
12/09/2023 ( Expired 639 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Zone no. 01, ward no. 04, at khaira purani basti (1) construction of rcc drain and toplayer cement concrete road form satish rawat ji house to rajkumar yadav ji house, (2) construction of rcc drain and wbm road from sanchi road to rajendra saket ji..
Zone no. 01, ward no. 04, at khaira purani basti (1) construction of rcc drain and toplayer cement concrete road form satish rawat ji house to rajkumar yadav ji house, (2) construction of rcc drain and wbm road from sanchi road to rajendra saket ji..
Read moreNew construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
Read moreTurip 2025-26-phase iii - package-i - improvement of bt surface at pattappan kovil road, thoodhanoor main road, kaliyamman nagar 1, ayyanarappan kovil street 2,ayyanarappan kovil street, malangaadu jayam school road in edanganasalai mpty
Turip 2025-26-phase iii - package-i - improvement of bt surface at pattappan kovil road, thoodhanoor main road, kaliyamman nagar 1, ayyanarappan kovil street 2,ayyanarappan kovil street, malangaadu jayam school road in edanganasalai mpty
Read moreConstruction of three high level bridges on 1.badawali semari nichla guda road at gomti river. 2.saradi gingla road at gomti river. 3.dhelai road at saru river.
Construction of three high level bridges on &#x0d 1.badawali semari nichla guda road at gomti river. &#x0d 2.saradi gingla road at gomti river. &#x0d 3.dhelai road at saru river.&#x0d
Read moreConstruction of new buildings for 1) sw pre metric girls hostel at gudur (vm), 2) sw pre metric boys hostel at kambalapadu (v) of krishnagiri (m) in kurnool district, 3) sw pre metric girls hostel at kanekal (vm) in ananthapuram district, 4) sw post metric boys hostel at navaz katta in atmakur town, 5) sw post metric girls hostel at kg road, nandikotkuru town in nandyala district as package-iv under pm ajay (5 nos)-esti.rs.1500.00 lakhs
Construction of new buildings for 1) sw pre metric girls hostel at gudur (vm), 2) sw pre metric boys hostel at kambalapadu (v) of krishnagiri (m) in kurnool district, 3) sw pre metric girls hostel at kanekal (vm) in ananthapuram district, 4) sw post metric boys hostel at navaz katta in atmakur town, 5) sw post metric girls hostel at kg road, nandikotkuru town in nandyala district as package-iv under pm ajay (5 nos)-esti.rs.1500.00 lakhs
Read moreConstruction of rcc culverts at sarada colony 14th and 15th lines and cc outfall drain to sarada colony main road from 13th line to 15th line (south side) in div no.50 under ae-6 section.
Construction of rcc culverts at sarada colony 14th and 15th lines and cc outfall drain to sarada colony main road from 13th line to 15th line (south side) in div no.50 under ae-6 section.
Read moreConstruction of rcc culverts at sarada colony 13th and 19th lines and cc outfall drain to sarada colony main road from 13th line to 14th line (north side) in div no.50 under ae-6 section
Construction of rcc culverts at sarada colony 13th and 19th lines and cc outfall drain to sarada colony main road from 13th line to 14th line (north side) in div no.50 under ae-6 section
Read moreConstruction road by cc interlocking tiles from dhanderi main road to kelhanpur at village kelhanpur of piran kaliar constituency of district haridwar under state sector year 2025-26 (job-2).
Construction road by cc interlocking tiles from dhanderi main road to kelhanpur at village kelhanpur of piran kaliar constituency of district haridwar under state sector year 2025-26 (job-2).
Read moreConstruction of donli to punialla link road from km 1st rd 0 to km 9th rd 500 by way of earthwork 1000 mm dia hp culvert 5 00 mtr height semi pucca r wall 1 50 mtr height pucca edge wall 2 5 mtr height semi pucca b wall and create wall
Construction of donli to punialla link road from km 1st rd 0 to km 9th rd 500 by way of earthwork 1000 mm dia hp culvert 5 00 mtr height semi pucca r wall 1 50 mtr height pucca edge wall 2 5 mtr height semi pucca b wall and create wall
Read moreConstruction of wbm road at top and bottom peripheral of ash pond 1 and 2 at bktps under capex 2025-26.
Construction of wbm road at top and bottom peripheral of ash pond 1 and 2 at bktps under capex 2025-26.
Read moreof your Industry type