Tender Details

About Tender

🏗️ Bharat Coking Coal Limited (Bccl) Rfp For Pump Motor Shifting Services 🏭 Bharat Coking Coal Limited (Bccl), A Public Sector Undertaking, Is Seeking Proposals For The Shifting Of A 4000 Gpm Pump Motor From Jharna Face Sump, As Required (Up To Three Times) For The Extraction Of Coal From The Sump Floor, Along With Miscellaneous Jobs Related To Pumping And Pipelines At Mocp Patch Under Amp Colliery. 📅 Proposal Submission Deadline: May 08, 2024, 6:00 Pm Interested Service Providers Must Submit A Tender Fee Of Inr 2700 Along With Their Proposal. The Scope Of Work Includes The Safe And Efficient Shifting Of The Pump Motor And Associated Tasks As Per The Project Requirements. Keywords: Bharat Coking Coal Limited, Pump Motor Shifting, Coal Extraction, Mocp Patch, Amp Colliery, Rfp, Public Sector Undertaking, Tender, Emd
Particulars Details
Title
Shifting Of 4000 Gpm Pump Motor Of Jharna Face Sump As And When Required (03 Times) For Extraction Of Coal From The Floor Of The Sump And Other Miscellaneous Job Related To Pumping And Pipe Line Of Mocp Patch Under Amp Colliery.
Description
Shifting Of 4000 Gpm Pump Motor Of Jharna Face &#X0d Sump As And When Required (03 Times) For Extraction Of &#X0d Coal From The Floor Of The Sump And Other Miscellaneous &#X0d Job Related To Pumping And Pipe Line Of Mocp Patch &#X0d Under Amp Colliery.
Organisation Bharat Coking Coal Limited | Public Sector Undertakings
Tender Id 2024_BCCL_307070_1
Reference
Number
BCCL/GM/AR-I/AM (ENM)/E-TENDER/2024-25/67
Tender Fee 0
EMD 2700
Tender Value -
Place AMP COLLIERY BARORA AREA
Link
View Original Tender Notice

https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=318197

Start Date April 27, 2024 17:30
End Date
Expired 08/05/2024

Expired 890 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
(a)shifting of 4000gpm pump motor set of jharna face sump as and when required(04times)for extraction of coal from the floor of the sump and(b)maintenance of 4000gpm pump of jharna face and purba face and their pipeline of muraidih, amp colliery

(a)shifting of 4000gpm pump motor set of jharna face sump as and when required(04times)for extraction of coal from the floor of the sump and(b)maintenance of 4000gpm pump of jharna face and purba face and their pipeline of muraidih, amp colliery

Read more
Shifting of 4000gpm pump motor of jharna face for 04 times with gradual increasing of water level of the sump under muraidih, amp colliery.

Shifting of 4000gpm pump motor of jharna face for &#x0d 04 times with gradual increasing of water level of the &#x0d sump under muraidih, amp colliery.

Read more
Shifting of 4000gpm pumpmotor set of jharna sump as and when required (03times) with its pipeline for extraction of coal from the floor of the sump and maintenance of 4000gpm pump of jharna face and purba face and their pipe line of muraidih, ampc.

Shifting of 4000gpm pumpmotor set of jharna sump as and when required (03times) with its pipeline for extraction of coal from the floor of the sump and maintenance of 4000gpm pump of jharna face and purba face and their pipe line of muraidih, ampc.

Read more
Shifting of 4000gpm pump motor (three times) of jharna face sump and di of its pipe line due to gradual decreasing of water level at muraidih under amp colliery

Shifting of 4000gpm pump motor (three times) of jharna face sump and di of its pipe line due to gradual &#x0d decreasing of water level at muraidih under amp colliery

Read more
Shifting 4000 gpm and 2000gpm pump west coal face sump with delivery di as per installation place at 1t coal face under abocp mine

Shifting 4000 gpm and 2000gpm pump west coal face sump with delivery di as per installation place at 1t coal face under abocp mine

Read more
(a) installation of 4000gpm pump motor in sadbhavna face sump and jointing of its delivery with the existing range and (b) maintenance of 4000gpm pumps of coal face, jharna face and purba face sump under amp colliery.

(a) installation of 4000gpm pump motor in sadbhavna face sump and jointing of its delivery with the existing &#x0d range and (b) maintenance of 4000gpm pumps of coal face, jharna face and purba face sump under amp colliery.

Read more
Dismantling of two 4000gpm pump motor set with their pipe line from jharna face sump and transporting to socp attendance room premises due to decreasing of water level of jharna sump of muraidih, amp colliery.

Dismantling of two 4000gpm pump motor set with their pipe line from jharna face sump and transporting to socp attendance room premises due to decreasing of water level of jharna sump of muraidih, amp colliery.

Read more
Four times shifting of 2000gpm pump motor in safe/suitable side of the sump along with di of its pipe line due to extraction of floor coal of jarlahi coal face sump at phularitand under amp colliery

Four times shifting of 2000gpm pump motor in safe/suitable side of the sump along with di of its pipe &#x0d line due to extraction of floor coal of jarlahi coal face sump at phularitand under amp colliery

Read more
Shifting of 02 nos pump (4000 gpm and 2000 gpm) at jocp coal face abocp mine of block-ii area

Shifting of 02 nos pump (4000 gpm and 2000 gpm) at jocp coal face abocp mine of block-ii area

Read more
Diversion of 10inch/8inch dia delivery pipe and installation of 6000 gpm and 4000 gpm pump 1t face abocp mine

Diversion of 10inch/8inch dia delivery pipe and installation of 6000 gpm and 4000 gpm pump 1t face abocp mine

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise