Tender Details
Particulars | Details |
---|---|
Title |
Preparation Of Detailed Project Report In Connection With Up Gradation Of The Road From Bungkulung To Ambotia Fatak For Length Of 16.50 Km Along With Road Safety And Protective Works
|
Description |
Preparation Of Detailed Project Report In Connection With Up Gradation Of The Road From Bungkulung To Ambotia Fatak For Length Of 16.50 Km Along With Road Safety And Protective Works
|
Organisation | PUBLIC WORKS DEPARTMENT | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 5000 |
Tender Value | |
Place | Bungkulung |
Link |
AAAAAAAAAA Login to view |
Start Date | May 05, 2025 17:30 |
End Date |
13/05/2025 ( 17 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreStrengthening of existing stretch from km 101/880 to 105/300 of nh-167bg inkavali town along with one-time improvement of bypassed stretch of jaladanki town from km 91/770 to 94/300 on epc mode in spsr nellore district in the state of andhra pradesh
Strengthening of existing stretch from km 101/880 to 105/300 of nh-167bg inkavali town along with one-time improvement of bypassed stretch of jaladanki town from km 91/770 to 94/300 on epc mode in spsr nellore district in the state of andhra pradesh
Read moreConsultancy services for authority engineer for supervision of construction of two lane with paved shoulders for gowrelly to valigonda section from km 0.000 to km 41.920 green field alignment of nh 930p in the state of telangana on epc mode
Consultancy services for authority engineer for supervision of construction of two lane with paved shoulders for gowrelly to valigonda section from km 0.000 to km 41.920 green field alignment of nh 930p in the state of telangana on epc mode
Read moreConstruction of 4 lane with paved shoulder from ap/kn border (des. ch.0.000) to deosugur (des ch.54.566) of ap-kn border raichur-kn-ts border of nh-167 in the state of karnataka on ham under nh(o) (project length-54.566 km)
Construction of 4 lane with paved shoulder from ap/kn border (des. ch.0.000) to deosugur (des ch.54.566) of ap-kn border raichur-kn-ts border of nh-167 in the state of karnataka on ham under nh(o) (project length-54.566 km)
Read moreConstruction of road from wangti to bp 150, from km 0.000 to km 5.700 (net length 5.700 km) to nhsl specifications under 100 rcc/15 brtf in nagaland state
Construction of road from wangti to bp 150, from km 0.000 to km 5.700 (net length 5.700 km) to nhsl specifications under 100 rcc/15 brtf in nagaland state
Read moreEhabilitation and upgradation for kopargaon to savli vihir section from km. 354.000 to km.362.663 total length 8.663 of nh 752 g to 4l.ps in the state of maharashtra. repairs of bad patches and dis at the risk and cost of the contractor as per
Ehabilitation and upgradation for kopargaon to savli vihir section from km. 354.000 to km.362.663 total length 8.663 of nh 752 g to 4l.ps in the state of maharashtra. repairs of bad patches and dis at the risk and cost of the contractor as per
Read moreConstruction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode
Construction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode
Read moreServices of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.
Services of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.
Read moreConsultancy services for ae for supervision of rehabilitation and upgradation from of kolde to visarwadi (near junction with nh-6) section of nh752g (total length -4.40) to 2lps/ four lanes in the state of maharashtra on epc mode.
Consultancy services for ae for supervision of rehabilitation and upgradation from of kolde to visarwadi (near junction with nh-6) section of nh752g (total length -4.40) to 2lps/ four lanes in the state of maharashtra on epc mode.
Read moreConsultancy services for ae for supervision of rehabilitation and up-gradation to 2lps of kalyan - murbad - malshej ghat - nirmal road nh-61 from km 37-850 to km 57-900 (murbad to kadampada section) in the state of maharashtra on epc mode.
Consultancy services for ae for supervision of rehabilitation and up-gradation to 2lps of kalyan - murbad - malshej ghat - nirmal road nh-61 from km 37-850 to km 57-900 (murbad to kadampada section) in the state of maharashtra on epc mode.
Read moreof your Industry type