Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Approach Repair Work Of The Large Bridge Constructed On Banda Bypass In Banda District.
|
| Description |
Approach Repair Work Of The Large Bridge Constructed On Banda Bypass In Banda District.
|
| Organisation | Chief Engineer Jhansi Zone PWD Jhansi UP | State Govt. and UT |
| Tender Id | 2025_CEJNS_1010825_1 |
|
Reference Number |
856/35 C-Banda circle/2024 Dt. 22-02-2025 |
| Tender Fee | 2720 |
| EMD | 8.2 Lakh |
| Tender Value | - |
| Place | Banda |
| Link |
View Original Tender Notice
https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1813846 |
| Start Date | March 01, 2025 14:30 |
| End Date |
Expired
22/03/2025
Expired 531 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of bridge on mangasuli lakshmeshwar(sh-73) road at km 63.70 and 66.70 in raibag constituency of chikodi taluka belagavi district in the year 2026-27 hoa 5054-krdcl bridge
Construction of bridge on mangasuli lakshmeshwar(sh-73) road at km 63.70 and 66.70 in raibag constituency of chikodi taluka belagavi district in the year 2026-27 hoa 5054-krdcl bridge
Read moreConstruction of bridge at 0.85 km on deshnur-mattikoppa (major district road) of kittur constituency in bailhongal taluk
Construction of bridge at 0.85 km on deshnur-mattikoppa (major district road) of kittur constituency in bailhongal taluk
Read moreConstruction of bridge on mudhol nippani road (sh18) at km 63.20 (kabbur village limit) in chikodi taluka belagavi district in year 2026-27 hoa 5054- krdcl bridge
Construction of bridge on mudhol nippani road (sh18) at km 63.20 (kabbur village limit) in chikodi taluka belagavi district in year 2026-27 hoa 5054- krdcl bridge
Read moreConstruction of hl rcc bridge (9x29.85m) in place of existing old damaged bridge over sukhnar river in 80th km of nh 333a khaira-sono road, mangobandar bridge, in the district of jamui.
Construction of hl rcc bridge (9x29.85m) in place of existing old damaged bridge over sukhnar river in 80th km of nh 333a khaira-sono road, mangobandar bridge, in the district of jamui.
Read moreRepair and renovation work at the baran district industries and commerce department.
Repair and renovation work at the baran district industries and commerce department.
Read moreConstruction of bridge on yalparatti bungle parmanandwadi-shirgur-gundwad-kudachi mdr at km. 9.90 in kudachi constituency raibag taluka of belagavi district
Construction of bridge on yalparatti bungle parmanandwadi-shirgur-gundwad-kudachi mdr at km. 9.90 in kudachi constituency raibag taluka of belagavi district
Read moreRoof repair work of the auction hall at the fishing harbour located in koderi, byndoor taluk, udupi district.
Roof repair work of the auction hall at the fishing harbour located in koderi, byndoor taluk, udupi district.
Read moreConstruction of 4-lane elevated road near aiims darbhanga on shoban-ekmi bypass (length-2.320 km) & construction of elevated road from lohjiya chowk to pandasarai rob with ramp towards pandasarai from lohiya chowk (length-2.142 km) in darbhanga district in the state of bihar on epc mode
Construction of 4-lane elevated road near aiims darbhanga on shoban-ekmi bypass (length-2.320 km) & construction of elevated road from lohjiya chowk to pandasarai rob with ramp towards pandasarai from lohiya chowk (length-2.142 km) in darbhanga district in the state of bihar on epc mode
Read moreConstruction of hl rcc bridge (16x29.85m) in place of existing old damaged bridge over kiul river in 72nd km of nh 333a of khaira-sono road, nariyana ghat, in the district of jamui.
Construction of hl rcc bridge (16x29.85m) in place of existing old damaged bridge over kiul river in 72nd km of nh 333a of khaira-sono road, nariyana ghat, in the district of jamui.
Read moreRepair work on the drain and pcc paving in ward no. 11, extending from the house of the late ramswaroop chaudhary to chand alam's house.
Repair work on the drain and pcc paving in ward no. 11, extending from the house of the late ramswaroop chaudhary to chand alam's house.
Read moreof your Industry type