Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Core Cutting And Fixing Of Anchor Bolts In Ballastless Track And Fixing Of Plate Screw At Turnouts Of Ballasted Track By Grouting In Line 3,4,6,8,9 And Apl Of Dmrc Network.
|
| Description |
Core Cutting And Fixing Of Anchor Bolts In Ballastless Track And Fixing Of Plate Screw At Turnouts Of Ballasted Track By Grouting In Line 3,4,6,8,9 And Apl Of Dmrc Network.
|
| Organisation | Delhi Metro Rail Corporation Limited | Central Govt. Ministry/Department |
| Tender Id | 2024_DMRC_825970_1 |
|
Reference Number |
OCP-1715 |
| Tender Fee | 23600 |
| EMD | 2.25 Lakh |
| Tender Value | |
| Place | New Delhi |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=868000 |
| Start Date | October 16, 2024 14:30 |
| End Date |
Expired
28/10/2024
Expired 612 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repair of cracks/grouting of anchor bolts, strengthening of track plinth and repair of water stagnation location in line-3,4,6,8,9 and apl of dmrc network.
Repair of cracks/grouting of anchor bolts, strengthening of track plinth and repair of water stagnation location in line-3,4,6,8,9 and apl of dmrc network.
Read moreSupply of foundation anchor bolts, diamond core drilling and chemical grouting of bolts as per tender specifications
Supply of foundation anchor bolts, diamond core drilling and chemical grouting of bolts as per tender specification.
Read moreSupply of foundation anchor bolts, diamond core drilling and chemical grouting of bolts as per tender specifications
Supply of foundation anchor bolts, diamond core drilling and chemical grouting of bolts as per tender specifications
Read moreDesign, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts in corridor 2 from benniganahalli to chikkabanavara including ballasted and special tracks in soladevanahalli depot
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts in corridor 2 from benniganahalli to chikkabanavara including ballasted and special tracks in soladevanahalli depot
Read moreDesign, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Read moreManufacturing and supply of s g/ broad gauge uic-60 turnouts and scissors cross over and check rails for ballasted/ballastless track of line-11 including balance requirements of line- 03, line-08 extn. and line-10 of delhi metro phase-iv corridors
Manufacturing and supply of s g/ broad gauge uic-60 turnouts and scissors cross over and check rails for ballasted/ballastless track of line-11 including balance requirements of line- 03, line-08 extn. and line-10 of delhi metro phase-iv corridors
Read moreDesign, supply, installation, testing and commissioning of ballasted/ ballast-less track in at grade section of reach 1a, reach 2a & reach 4a of nmrp phase-2 including supply of 1080grade hh rails, track fastenings, 1 in 9 r300 ballasted/ballastless turnouts & derailing switches and other miscellaneous works
Design, supply, installation, testing and commissioning of ballasted/ ballast-less track in at grade section of reach 1a, reach 2a & reach 4a of nmrp phase-2 including supply of 1080grade hh rails, track fastenings, 1 in 9 r300 ballasted/ballastless turnouts & derailing switches and other miscellaneous works
Read moreComprehensive maintenance of 70 nos. of way-side lubricators installed on track in line-1 to line-6 of dmrc network.
Comprehensive maintenance of 70 nos. of way-side lubricators installed on track in line-1 to line-6 of dmrc network.
Read moreSupply of fastening system (69000 sets 04 anchor system and 144150 sets 02 anchor system) for ballastless track for line 8 ext (janakpuri west- majlis park- r.k. ashram).
Supply of fastening system (69000 sets 04 anchor system and 144150 sets 02 anchor system) for ballastless track for line 8 ext (janakpuri west- majlis park- r.k. ashram).
Read moreDesign, supply, installation, testing and commissioning of ballastless track for elevated viaduct of reach 1b and reach 3a of nmrp ph-2 incl supply of 1080 grade hh rails, track fastenings, 1 in 9 r300 ballastless turnouts and other misc works.
Design, supply, installation, testing and commissioning of ballastless track for elevated viaduct of reach 1b and reach 3a of nmrp ph-2 incl supply of 1080 grade hh rails, track fastenings, 1 in 9 r300 ballastless turnouts and other misc works.
Read moreof your Industry type