Tender Details
Particulars | Details |
---|---|
Title |
Shooting Glasses For 25 M Pistol Shooting Events With 02 Filters Yellow And Violet1,Shooting Glasses
|
Description |
|
Organisation | Department of Military Affairs | Ministry of Defence |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link |
AAAAAAAAAA Login to view |
Start Date | May 26, 2025 21:32 |
End Date |
16/06/2025 ( 18 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Jp/b862-204-pd-t-8701/1016 - water block package (rwtp, rodmp, cpu and etp) for pdh pp plant with ethane and propane storage and handling facilities at dahej, gujarat of m/s petronet lng limited (pll)
Water block package (rwtp, rodmp, cpu and etp) for pdh pp plant with ethane and propane storage and handling facilities at dahej, gujarat of m/s petronet lng limited (pll)
Read moreModification of 112 jaguar aircraft for carriage and launch of hsld mk ii with wireless avionics computer and supply of 15 o level testers
Modification of 112 jaguar aircraft for carriage and launch of hsld mk ii with wireless avionics computer and supply of 15 o level testers
Read moreDevelopment of internal infrastructure for uttar pradesh defence industrial corridor, aligarh node, phase ii with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode.
Development of internal infrastructure for uttar pradesh defence industrial corridor, aligarh node, phase ii with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode.
Read moreDevelopment of internal infrastructure for uttar pradesh defence industrial corridor, agra node with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode
Development of internal infrastructure for uttar pradesh defence industrial corridor, agra node with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode
Read moreProcurement implementation and maintenance of hospital management information system along with required it and ict infrastructure for selected medical college hospitals under medical education and research department govt of assam
Procurement implementation and maintenance of hospital management information system along with required it and ict infrastructure for &#x0d selected medical college hospitals&#x0d under medical education and research department&#x0d govt of assam&#x0d
Read moreE-tender for procurement and installation of 3 nos of medium liquid nitrogen plant along with 100 kva voltage stabilizer for west tripura, gomati and unakoti districts to strengthen ai network in tripura state during the year 2025-2026
E-tender for procurement and installation of 3 nos of medium liquid nitrogen plant along with 100 kva voltage stabilizer for west tripura, gomati and unakoti districts to strengthen ai network in tripura state during the year 2025-2026
Read more02 types of pc sheet for rd 125mm he and heat ammunition
02 types of pc sheet for rd 125mm he and heat ammunition
Read moreAllotment of water area and appurtenant land for setting up and operation of floating lng terminal consisting of a fsru or fsu with land based regasification under policy guidelines for land management-2014 as modified 2015 and all its clarifications
Allotment of water area and appurtenant land for setting up and operation of floating lng terminal consisting of a fsru or fsu with land based regasification under policy guidelines for land management-2014 as modified 2015 and all its clarifications
Read more(i) cont. of h.l. bridge with approach road over chas nala at 5th km of dhanbad-pathardih-sindri road (2 x 14.6m and (ii) cont. of h.l. bridge with approach road over chas nala at 7th km of dps road (1 x 14.6m) under plan head for the year 2025-26.
(i) cont. of h.l. bridge with approach road over chas nala at 5th km of dhanbad-pathardih-sindri road (2 x 14.6m and (ii) cont. of h.l. bridge with approach road over chas nala at 7th km of dps road (1 x 14.6m) under plan head for the year 2025-26.
Read moreDevelopment of internal infrastructure for integrated manufacturing and logistic cluster imlc unnao uttar pradesh india with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode
Development of internal infrastructure for integrated manufacturing and logistic cluster imlc unnao uttar pradesh india with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode
Read moreof your Industry type