Tender Details

Particulars Details
Title
Development Of Internal Infrastructure For Integrated Manufacturing And Logistic Cluster Imlc Unnao Uttar Pradesh India With Defect Liability Period And Operation And Maintenance For Concurrent Period Of Five 05 Years On Epc Mode
Description
Development Of Internal Infrastructure For Integrated Manufacturing And Logistic Cluster Imlc Unnao Uttar Pradesh India With Defect Liability Period And Operation And Maintenance For Concurrent Period Of Five 05 Years On Epc Mode
Organisation U.P. Expressways Industrial Development Authority | State Govt. and UT
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 11800
EMD 59.91 Lakh
Tender Value
Place Unnao
Link

AAAAAAAAAA

Login to view
Start Date June 16, 2025 15:30
End Date

27/06/2025 ( 7 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Development, operation and maintenance of ropeway between tawang monastery to p t tso lake in tawang district in the state of arunachal pradesh on hybrid annuity mode.

Development, operation and maintenance of&#x0d ropeway between tawang monastery to p t&#x0d tso lake in tawang district in the state of&#x0d arunachal pradesh on hybrid annuity mode.

Read more
Supply, manning, operation and maintenance of one(01) number security launch with steel/frp/aluminium hull on hire basis having speed of 20knots for a period ten of years

Supply, manning, operation and maintenance of one(01) number security launch with steel/frp/aluminium hull on hire basis having speed of 20knots for a period ten of years

Read more
Selection of epc contractor for integrated manufacturing cluster imc palakkad

Rfq cum rfp for design, construction, testing, commissioning and operation and maintenance of infrastructure works at pudussery central and kannambra of palakkad node under extension of chennai bengaluru industrial corridor cbic on epc basis.

Read more
Establishment of 3 mld desalination plant based on sea water reverse osmosis at v.o.chidambaranar port and operation and maintenance for 5 years on dbo mode

Establishment of 3 mld desalination plant based on sea water reverse osmosis at v.o.chidambaranar port and operation and maintenance for 5 years on dbo mode

Read more
Package 20c design, engineering, supply,installation, testing, commissioning and comprehensive operation and maintenance of 3.0 mwp roof top solar pv project and associated support structure works on resco model for a period of 25 years.

Package 20c design, engineering, supply,installation, testing, commissioning and comprehensive operation and maintenance of 3.0 mwp roof top solar pv project and associated support structure works on resco model for a period of 25 years.

Read more
Consultancy services as ie during o and m period for the project two laning with paved shoulders of aligarh-moradabad section of nh-509 from km. 79.000 to km.232.020 in the state of uttar pradesh on performance -based maintenance contract (pbmc)

Consultancy services as ie during o and m period for the project two laning with paved shoulders of aligarh-moradabad section of nh-509 from km. 79.000 to km.232.020 in the state of uttar pradesh on performance -based maintenance contract (pbmc)

Read more
Implementation of 24x7 w/s project for town planning scheme (t.p. 1, 2, 3 and 4) under jurisdiction of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years

Implementation of 24x7 w/s project for town planning scheme (t.p. 1, 2, 3 and 4) under jurisdiction of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years

Read more
Construction of underground s/s for town planning scheme (t.p.1, 2, 3 and 4) of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years

Construction of underground s/s for town planning scheme (t.p.1, 2, 3 and 4) of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years

Read more
Construction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.

Construction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.

Read more
Development of residential towers and community center including allied work at 37 d, green view apartments, gurugram on design, engineering, procurement and construction (epc) basis including operation and maintenance of 5 years

Development of residential towers and community &#x0d center including allied work at 37 d, green view &#x0d apartments, gurugram on design, engineering, &#x0d procurement and construction (epc) basis including &#x0d operation and maintenance of 5 years

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise