Tender Details
Particulars | Details |
---|---|
Title |
Development Of Internal Infrastructure For Uttar Pradesh Defence Industrial Corridor, Agra Node With Defect Liability Period And Operation And Maintenance For Concurrent Period Of Five 05 Years On Epc Mode
|
Description |
Development Of Internal Infrastructure For Uttar Pradesh Defence Industrial Corridor, Agra Node With Defect Liability Period And Operation And Maintenance For Concurrent Period Of Five 05 Years On Epc Mode
|
Organisation | U.P. Expressways Industrial Development Authority | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 11800 |
EMD | 2.42 Crore |
Tender Value | |
Place | Agra |
Link |
AAAAAAAAAA Login to view |
Start Date | June 23, 2025 15:30 |
End Date |
05/07/2025 ( 38 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.
Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.
Read moreCs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Read moreDevelopment of multi modal logistics park (mmlp) at varanasi in the state of uttar pradesh on engineering, procurement and construction mode
Development of multi modal logistics park (mmlp) at varanasi in the state of uttar pradesh on engineering, procurement and construction mode
Read moreDevelopment of internal infrastructure for uttar pradesh defence industrial corridor, aligarh node, phase ii with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode.
Development of internal infrastructure for uttar pradesh defence industrial corridor, aligarh node, phase ii with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode.
Read moreDevelopment of internal infrastructure for uttar pradesh defence industrial corridor, agra node with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode
Development of internal infrastructure for uttar pradesh defence industrial corridor, agra node with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode
Read moreOperation and maintenance of the bus terminal at kuthambakkam ppp mode for a period of 15years
Operation and maintenance of the bus terminal at kuthambakkam ppp mode for a period of 15years
Read moreDesign, engineering, supply, installation, commissioning, own, operation and maintenance for a period of 40 years of 4x250 kw surface hydrokinetic power plant at tail race channel of kotla hydro power station, bbmb under resco mode
Design, engineering, supply, installation, commissioning, own, operation and maintenance for a period of 40 years of 4x250 kw surface hydrokinetic power plant at tail race channel of kotla hydro power station, bbmb under resco mode
Read moreDevelopment of rail connectivity for mmlp indore in the state of madhya pradesh on epc mode
Development of rail connectivity for mmlp indore in the state of madhya pradesh on epc mode
Read moreDevelopment, operation and maintenance of wayside amenities 3 o -m sites in uttar pradesh and 1 o-m site in odisha (4 o-m sites)nh-27/gorakhpur/up
Development, operation and maintenance of wayside amenities 3 o -m sites in uttar pradesh and 1 o-m site in odisha (4 o-m sites)nh-27/gorakhpur-kushinagar /285-177/ lhs/jagdishpur/uttar pradesh
Read moreDevelopment of internal infrastructure for integrated manufacturing and logistic cluster imlc unnao uttar pradesh india with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode
Development of internal infrastructure for integrated manufacturing and logistic cluster imlc unnao uttar pradesh india with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode
Read moreof your Industry type