Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Running, Operation, And Routine Repairing Of All Civil Structures And E.M. Equipments With All Labour, T And P Required Fuel, Proper Maintenance Of Campus, Equipments To Achieve Design Parameters Of 36 Mld Cetp Jajmau Kanpur
|
Description |
Running, Operation, And Routine Repairing Of All Civil Structures And E.M. Equipments With All Labour, T And P Required Fuel, Proper Maintenance Of Campus, Equipments To Achieve Design Parameters Of 36 Mld Cetp Jajmau Kanpur
|
Organisation | Government of Uttar Pradesh |
Tender Id | 2023_UPJNM_821168_1 |
Reference Number |
382/AC-7/76 Dt. 07.07.2023 |
Tender Fee | 11800 |
EMD | 9.5 Lakh |
Tender Value | |
Place | Office of the E.E., Const. Div.-I,UPJN(U),Kanpur |
Link | https://etender.up.nic.in |
Start Date | July 15, 2023 20:30 |
End Date |
27/07/2023 ( Expired 698 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Sewer line shifting work at jarib chawki under deposite programme kanpur nagar including supply of all labour material t and p etc completed testing and commissioning
Sewer line shifting work at jarib chawki under deposite programme kanpur nagar including supply of all labour material t and p etc completed testing and commissioning
Read moreSupplying all materials, labour, t and p etc. and execution of rpws to village chitrakonda (70 lpcd retrofitting) of chitrakonda block under malkangiri district with 05 years operation and maintenance
Supplying all materials, labour, t and p etc. and execution of rpws to village chitrakonda (70 lpcd retrofitting) of chitrakonda block under malkangiri district with 05 years operation and maintenance
Read moreInvestigation and survey on gis basis of the project area including soil investigation engineering design hydraulic and structural as required procurement of all labour and material t and p etc and construction of various components complete
Construction of 0.6 mld stp pumping station conveyance system and other associated sewerage &#x0d works and drain works in patelpuram gaytri shaktipeeth, gomti nagar vistar sector1 district &#x0d lucknow up india &#x0d
Read moreOperation and maintenance of servo voltage stabilizer including supply of all material labour. t and p etc required for proper completion of work which has been installed at different tubwells of water supply scheme under ujs haldwani
Operation and maintenance of servo voltage stabilizer including supply of all material labour. t and p etc required for proper completion of work which has been installed at different tubwells of water supply scheme under ujs haldwani
Read moreInvestigation and survey on gis basis of the project area including soil investigation engineering design hydraulic and structural as required procurement of all labour and material t and p etc and construction of various components complete
Construction of 0.6 mld stp pumping station conveyance system and other associated sewerage works and drain works in patelpuram gaytri shaktipeeth, gomti nagar vistar sector1 district lucknow up india
Read moreOperation and maintenance of servo voltage stabilizer including supply of all material labour. t and p etc required for proper completion of work which has been installed at different tubwells of water supply scheme under ujs haldwani
Operation and maintenance of servo voltage stabilizer including supply of all material labour. t and p etc required for proper completion of work which has been installed at different tubwells of water supply scheme under ujs haldwani
Read moreShifting and tube well pump house boundary wall works other works in itaura buzurg water supply scheme including survey design site investigation planning supply of all materials labour t p complete in all respect on turn key basis after compl
Shifting and tube well pump house boundary wall works other works in itaura buzurg water supply scheme including survey design site investigation planning supply of all materials labour t p complete in all respect on turn key basis after compl
Read moreShifting works of pipeline and other work in existing water supply scheme including survey design site investigation planning supply of all materials labour t p complete in all respect on turn key basis
Shifting works of pipeline and other work in existing water supply scheme including survey design site investigation planning supply of all materials labour t p complete in all respect on turn key basis
Read moreSurvey drawing design checking of design carting of materialsincluding supply of all materials labours and t and p etc for proper completion of underhansidhunga gujarkot gov rural pumping watersupply scheme (remaining works) under nabard
Survey drawing design checking of design carting of materialsincluding supply of all materials labours and t and p etc for proper completion of underhansidhunga gujarkot gov rural pumping watersupply scheme (remaining works) under nabard
Read moreReinstatement of cc road including supply of all materials labour t and p etc required for proper completion of work etc at shyampur pumping water supply scheme of block doiwala district dehradun
Reinstatement of cc road including supply of all materials labour t and p etc required for proper completion of work etc at shyampur pumping water supply scheme of block doiwala district dehradun
Read moreof your Industry type