Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of New 33 K V U/G Line From Primary Substation 132/33 K V Krishna Nagar, For Releasing New Connection Of 5.5 Mva To 20 Mld Capacity Common Effluent Treatment Plant (Cetp), Under Eudd Jajmau, Kesco, Kanpur(turn Key Basis)
|
| Description |
Construction Of New 33 K V U/G Line From Primary Substation 132/33 K V Krishna Nagar, For Releasing New Connection Of 5.5 Mva To 20 Mld Capacity Common Effluent Treatment Plant (Cetp), Under Eudd Jajmau, Kesco, Kanpur (Turn Key Basis)
|
| Organisation | Government of Uttar Pradesh |
| Tender Id | 2023_KESCO_848533_1 |
|
Reference Number |
26/Const./2023-24 |
| Tender Fee | 11800 |
| EMD | 11.68 Lakh |
| Tender Value | |
| Place | Electricity Construction Circle, RPH, Kesco,Kanpur |
| Link |
View Original Tender Notice
https://etender.up.nic.in |
| Start Date | October 10, 2023 00:25 |
| End Date |
Expired
03/11/2023
Expired 952 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of 02 nos 31.5 mva,132/33 kv transformer bays at new haldia 220 kv sub-station and haldia 132 kv substation under haldia area office and allied work on turn key basis.
Construction of 02 nos 31.5 mva,132/33 kv transformer bays&#x0d at new haldia 220 kv sub-station and haldia 132 kv substation&#x0d under haldia area office and allied work on turn&#x0d key basis.
Read moreConstruction of 02 numbers new 33kv bay at tcf ps-1 132/33 kv substation yard under siliguri sub-urban division, wbsedcl under turn-key mode
Construction of 02 numbers new 33kv bay at tcf ps-1 132/33 kv substation yard under siliguri sub-urban division, wbsedcl under turn-key mode
Read moreBalance construction work of 2x50 mva, 220/33 kv nagrota (new) substation including lilo construction of residential staff quarters under pmdp scheme-15 on turn key basis
Balance construction work of 2x50 mva, 220/33 kv nagrota (new) substation including lilo construction of residential staff quarters under pmdp scheme-15 on turn key basis
Read moreBalance construction work of 2x50 mva 220/33 kv nagrota new substation including lilo of 220 kv udhampur-gladni s/c line on d/c tower atnagrota substation including design, engineering, residential staff qtrs under pmdp scheme-15 on turn-key basis
Balance construction work of 2x50 mva 220/33 kv at nagrota new substation including lilo of 220 kv udhampur-gladni s/c line on d/c tower at nagrota substation including design, engineering,residential staff qtrs under pmdp scheme-15 on turn-key basis
Read moreExtension of switchyard to incorporate new additional 33 bays using vacant land outside the existing switchyard and other allied work on turn-key basis at sonarpur 132/33 kv substation under kasba area office, w.b.s.e.t.c.l
Extension of switchyard to incorporate new additional 33&#x0d bays using vacant land outside the existing switchyard&#x0d and other allied work on turn-key basis at sonarpur 132/33&#x0d kv substation under kasba area office, w.b.s.e.t.c.l
Read moreReplacement of 14 nos 33 kv sf6 cum ais bay with 33 kv double bus gis panel along with 2 no new transformer lv bays , 01 no b/c bay, 2 etr , 1 sst , 2 pt bay at bagnan 132/33 kv gas insulated substation on turn-key basis
Replacement of 14 nos 33 kv sf6 cum ais bay&#x0d with 33 kv double bus gis panel along with 2 no&#x0d new transformer lv bays , 01 no b/c bay, 2 etr , 1&#x0d sst , 2 pt bay at bagnan 132/33 kv gas insulated&#x0d substation on turn-key basis
Read moreConst. of 33/11 kv, 2x5 mva ropeway new s/s kashi vidyapeeth, varanasi, const. of 33kv ug line from 132 kv s/s alaipur and bhelupur to proposed 33/11 kv s/s ropeway for giving supply to ropeway and const. of 11kv u/g line for ropeway at diff. towers
Const. of 33/11 kv, 2x5 mva ropeway new s/s kashi vidyapeeth, varanasi, const. of 33kv ug line from 132 kv s/s alaipur and bhelupur to proposed 33/11 kv s/s ropeway for giving supply to ropeway and const. of 11kv u/g line for ropeway at diff. towers
Read moreThe work for construction of 33 kv u/g indepandent feeder from 132 kv s/s ledhupur to tibbatan sansthan, sarnath with d/c 3x300 sqmm xlpe cable in the area of uedd- sarnath, varanasi under ee, uecd-ii, varanasi in deposit scheme on semi turn key basi
The work for construction of 33 kv u/g indepandent feeder from 132 kv s/s ledhupur to tibbatan sansthan, sarnath with d/c 3x300 sqmm xlpe cable in the area of uedd- sarnath, varanasi under ee, uecd-ii, varanasi in deposit scheme on semi turn key basi
Read moreof your Industry type