Tender Details
Particulars | Details |
---|---|
Title |
Master Sewerage Scheme Faridabad. Designing, Construction And Commissioning Of 45 Mld Stp On Sbr Technology With Main Pumping Station, Tertiary Treatment To Achieve The Required Parameters With 10 Years Of Operation And Maintenance Etc.
|
Description |
Designing, Construction And Commissioning Of 45 Mld Stp On Sbr Technology With Main Pumping Station, Tertiary Treatment To Achieve The Required Parameters With 10 Years Of Operation And Maintenance Etc.
|
Organisation | Haryana Government | State Govt. and UT |
Tender Id | 2025_HRY_422249_1 |
Reference Number |
2025F2B9CD2B 628A 4651 B179 D2B9CC9B0DBB1851002 |
Tender Fee | 2360 |
EMD | 1.36 Crore |
Tender Value | |
Place | Faridabad (MC) |
Link | https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=498990 |
Start Date | January 07, 2025 15:30 |
End Date |
05/02/2025 ( Expired 74 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Investigation, survey (on g.i.s. vasis) and construction of 10 mld stp with 30 kld c0-treatment, i and d of drains and structure, rising main, treated effluent line with scada etc. in auraiya nagar palika parishad, district auraiya under s.b.m. 2.0
Investigation, survey (on g.i.s. vasis) and construction of 10 mld stp with 30 kld c0-treatment, i and d of drains and structure, rising main, treated effluent line with scada etc. in auraiya nagar palika parishad, district auraiya under s.b.m. 2.0
Read moreOperation and maintenance of 33 mld stp based on sbr technology under roorkee sewerage scheme saliyar jwalapur haridwar
Operation and maintenance of 33 mld stp based on sbr technology under roorkee sewerage scheme saliyar jwalapur haridwar
Read moreUpgradation of existing 100 mld sewerage treatment plant and construction of 75 mld tertiary treatment unit at dhanwapur sewage treatment works with operation and maintenance for 5 years after 12 months defect liability period for reuse of treated
Upgradation of existing 100 mld sewerage treatment plant and construction of 75 mld tertiary treatment unit at dhanwapur sewage treatment works with operation and maintenance for 5 years after 12 months defect liability period for reuse of treated ef
Read moreOperation and maintainance of sewerage treatment plant 5.50 mld stp capacity on sbr technology at morinda distt roopnagar for the year 2025-28
Operation and maintainance of sewerage treatment plant 5.50 mld stp capacity on sbr technology at morinda distt roopnagar for the year 2025-28
Read moreOperation and maintainance of sewerage treatment plant of 11.00 mld stp capacity on sbr technology at kharar distt s.a.s nagar mohali for the year 2025-28
Operation and maintainance of sewerage treatment plant of 11.00 mld stp capacity on sbr technology at kharar distt s.a.s nagar mohali for the year 2025-28
Read moreOperation and maintenance of sewage treatment plant 7 mld capacity on sbr technology and main pumping station 40 mld disposal works at sahnewal town for the 3 year 2025 to 2028 period 01.04.2025 to 31.03.2028 for 36 months
Operation and maintenance of sewage treatment plant 7 mld capacity on sbr technology and main pumping station 40 mld disposal works at sahnewal town for the 3 year 2025 to 2028 period 01.04.2025 to 31.03.2028 for 36 months
Read moreOperation and maintenance of sewage treatment plant 7 mld capacity on sbr technology and main pumping station 40 mld disposal works at sahnewal town for the 3 year 2025to2028 period 01.04.2025 to 31.03.2028 for 36 months app cost lumpsum basis
Operation and maintenance of sewage treatment plant 7 mld capacity on sbr technology and main pumping station 40 mld disposal works at sahnewal town for the 3 year 2025to2028 period 01.04.2025 to 31.03.2028 for 36 months app cost lumpsum basis&#x0d
Read moreDesigning constructing, erection and commissioning, up andperformance trial for 6 months followed by 10 years of o and m of 4.49 mld and 11.43 mld capacity sewage treatment plants stp with selected modern technology in maraimalai nagar munic
Designing constructing, erection and commissioning, up andperformance trial for 6 months followed by 10 years of o and m of 4.49 mld and 11.43 mld capacity sewage treatment plants stp with selected modern technology in maraimalai nagar munic
Read moreMaster sewerage scheme faridabad. designing, construction and commissioning of 45 mld stp on sbr technology with main pumping station, tertiary treatment to achieve the required parameters with 10 years of operation and maintenance etc.
Designing, construction and commissioning of 45 mld stp on sbr technology with main pumping station, tertiary treatment to achieve the required parameters with 10 years of operation and maintenance etc.
Read moreSurvey, soil investigation, design, supply, laying, construction and commissioning of stp of 40 mld tigriya badshah and sewer line of 64 km and 1 no. ips of 30 mld and pumping main including house service connection as per scope of work with 10 y
Survey, soil investigation, design, supply, laying, construction and commissioning of stp of 40 mld tigriya badshah and sewer line of 64 km and 1 no. ips of 30 mld and pumping main including house service connection as per scope of work with 10 y
Read moreof your Industry type