| Particulars | Details |
|---|---|
| Title |
Work Of Design Drawings And Consultancy Services For Construction Of 5 Mld Capacity Stp With Tertiary Treatment By Uf In Ecocity 2 New Chandigarh By Some Modern Technology To Achieve The Latest Parameters Fixed By Cpcb Ppcb Consisting Of Detailed
|
| Description |
Project Report Tender Documents Evaluation Of Bid Proof Checking Of Documents Of Constructions Agency And Fortnightly Supervision Up To Completion Of Construction And Stabilization Of Stp With Tertiary Treatment By Uf
|
| Organisation | Department of Housing and Urban Development | State Govt. and UT |
| Tender Id | 2026_DHUD_165524_1 |
|
Reference Number |
GMADA/DE(PH-2)/2026/260-270 dated 07-04-2026 |
| Tender Fee | 1001 |
| EMD | 20000 |
| Tender Value | - |
| Place | Ecocity-2 |
| Link |
View Original Tender Notice
https://eproc.punjab.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=335984 |
| Start Date | April 08, 2026 16:40 |
| End Date |
Expired
22/04/2026
Expired 175 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repair, jointing of cross connection of ppr (poly propylene random copolymer) pipe in hdpe pipeline treated tertiary water supply network of ecocity-1, new chandigarh for compliance of ppcb guidelines.
Repair, jointing of cross connection of ppr (poly propylene random copolymer) pipe in hdpe pipeline treated tertiary water supply network of ecocity-1, new chandigarh for compliance of ppcb guidelines.
Read moreDesign drawings and consultancy services for construction of 5 mld capacity cetp with tertiary treatment by uf in medicity by some modern technology to achieve the latest parameters fixed by cpcb ppcb consisting of detailed project report tender
Documents evaluation of bids proof checking of documents of construction agency and fortnightly supervision up to completion of construction and stabilization of cetp with tertiary treatment by uf
Read moreDesign drawings and consultancy services for construction of 5 mld capacity stp with tertiary treatment by uf in ecocity 2 1.8 mld capacity stp with tertiary treatment by uf in ecocity 2 extension and 4 mld capacity cetp with tertiary treatment by uf
Design drawings and consultancy services for construction of 5 mld capacity stp with tertiary treatment by uf in ecocity 2 1.8 mld capacity stp with tertiary treatment by uf in ecocity 2 extension and 4 mld capacity cetp with tertiary treatment by uf
Read moreProviding installing and commissioning of online continuous monitoring system probe type at the outlet of stp for parameters cod bod tss ph with one year data connectivity to ppcb cpcb
Providing installing and commissioning of online continuous monitoring system probe type&#x0d at the outlet of stp for parameters cod bod tss ph with one year data connectivity&#x0d to ppcb
Read moreProviding installing and commissioning of online continuous monitoring system probe type at the outlet of stp for parameters cod bod tss ph with one year data connectivity to ppcb cpcb with calibrations services complete in all respect
Providing installing and commissioning of online continuous monitoring system probe type at the outlet of stp for parameters cod bod tss ph with one year data connectivity to ppcb cpcb with calibrations services complete in all respect
Read moreMaster sewerage scheme faridabad. designing, construction and commissioning of 45 mld stp on sbr technology with main pumping station, tertiary treatment to achieve the required parameters with 10 years of operation and maintenance etc.
Designing, construction and commissioning of 45 mld stp on sbr technology with main pumping station, tertiary treatment to achieve the required parameters with 10 years of operation and maintenance etc.
Read moreCollecting and conducting design parameters test of sewage samples from nabl accredited lab for sewage treatment plant at diggian raipur khurd 3brd and dhanas under mc ph-4 as per cpcb cpcc and ppcb guidelines . ch. to revenue head.
Collecting and conducting design parameters test of sewage samples from nabl accredited lab for sewage treatment plant at diggian raipur khurd 3brd and dhanas under mc ph-4 as per cpcb cpcc and ppcb guidelines . ch. to revenue head.
Read moreMaster sewerage scheme faridabad- designing, construction and commissioning of 20 mld capacity stp on sbr technology with tertiary treatment to achieve the required parameters with 03 months trial run, 10 years of o and m etc.
Master sewerage scheme faridabad- designing, construction and commissioning of 20 mld capacity stp on sbr technology with tertiary treatment to achieve the required parameters with 03 months trial run, 10 years of o and m etc.
Read moreMaster sewerage scheme faridabad- designing, construction and commissioning of 20 mld capacity stp on sbr technology with tertiary treatment to achieve the required parameters with 03 months trial run, 10 years of o and m after completion of 1 year d
Designing, construction and commissioning of 20 mld capacity stp on sbr technology with tertiary treatment to achieve the required parameters with 03 months trial run, 10 years of o and m after completion of 1 year dlp
Read moreof your Industry type