Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Master Sewerage Scheme Faridabad Designing, Construction And Commissioning Of 20 Mld Capacity Stp On Sbr Technology With Tertiary Treatment To Achieve The Required Parameters With 03 Months Trial Run, 10 Years Of O And M After Completion Of 1 Year D
|
| Description |
Designing, Construction And Commissioning Of 20 Mld Capacity Stp On Sbr Technology With Tertiary Treatment To Achieve The Required Parameters With 03 Months Trial Run, 10 Years Of O And M After Completion Of 1 Year Dlp
|
| Organisation | Haryana Government | State Govt. and UT |
| Tender Id | 2025_HRY_459772_1 |
|
Reference Number |
2025563D171D BCDE 4C9D AA1F 1B5D43AE03351851002 |
| Tender Fee | 2360 |
| EMD | 90 Lakh |
| Tender Value | - |
| Place | Faridabad (MC) |
| Link |
View Original Tender Notice
https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=537505 |
| Start Date | July 19, 2025 23:45 |
| End Date |
Expired
25/08/2025
Expired 413 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Master sewerage scheme faridabad- designing, construction and commissioning of 20 mld capacity stp on sbr technology with tertiary treatment to achieve the required parameters with 03 months trial run, 10 years of o and m etc.
Master sewerage scheme faridabad- designing, construction and commissioning of 20 mld capacity stp on sbr technology with tertiary treatment to achieve the required parameters with 03 months trial run, 10 years of o and m etc.
Read moreMaster sewerage scheme faridabad. designing, construction and commissioning of 45 mld stp on sbr technology with main pumping station, tertiary treatment to achieve the required parameters with 10 years of operation and maintenance etc.
Designing, construction and commissioning of 45 mld stp on sbr technology with main pumping station, tertiary treatment to achieve the required parameters with 10 years of operation and maintenance etc.
Read moreOperation and maintenance of 30 mld stp based on sbr
Operation and maintenance of 30 mld stp based on sbr
Read moreSurveying, designing, construction, installation, testing, commissioning, trial run and running o and m for 5 years of stp of 1.5 mld capacity on sbr technology... at rajnagar ro colony under rajnagar ro sub area of hasdeo area on turnkey basis
Surveying, designing, construction, installation, testing, commissioning, trial run and running o and m for 5 years of stp of 1.5 mld capacity on sbr technology... at rajnagar ro colony under rajnagar ro sub area of hasdeo area on turnkey basis
Read moreO and m of 4 mld stp (sbr tehnology) at talwandi bhai
O and m of 4 mld stp (sbr tehnology) at talwandi bhai district ferozepur for 5.50 months ( 15.10.2024 to 31.03.2025)&#x0d
Read moreSupply of various chemicals for secondary and tertiary unit at 50 mld, 120 mld stp behrampur and 68 mld dhanwapur
Supply of various chemicals for secondary and tertiary unit at 50 mld, 120 mld stp behrampur and 68 mld dhanwapur
Read moreWork of design drawings and consultancy services for construction of 5 mld capacity stp with tertiary treatment by uf in ecocity 2 new chandigarh by some modern technology to achieve the latest parameters fixed by cpcb ppcb consisting of detailed
Project report tender documents evaluation of bid proof checking of documents of constructions agency and fortnightly supervision up to completion of construction and stabilization of stp with tertiary treatment by uf
Read moreDesign drawings and consultancy services for construction of 5 mld capacity stp with tertiary treatment by uf in ecocity 2 1.8 mld capacity stp with tertiary treatment by uf in ecocity 2 extension and 4 mld capacity cetp with tertiary treatment by uf
Design drawings and consultancy services for construction of 5 mld capacity stp with tertiary treatment by uf in ecocity 2 1.8 mld capacity stp with tertiary treatment by uf in ecocity 2 extension and 4 mld capacity cetp with tertiary treatment by uf
Read moreProviding 37.5 mld mps and 15 mld stp based on sbr technology with tertiary treatment for 15 mld flow including transformer dg set etc construction of stp in sector 14pii hisa.providing and laying of hdpe pipe lines of various size for sup
Providing 37.5 mld mps and 15 mld stp based on sbr technology with tertiary treatment for 15 mld flow including transformer dg set etc construction of stp in sector 14pii hisa.providing and laying of hdpe pipe lines of various size for sup
Read moreProviding 37.5 mld mps and 15 mld stp based on sbr technology with tertiary treatment for 15 mld flow including transformer dg set etc construction of stp in sector 14p ii hisar construction of main entrance gate and wicket gate and providing a
Providing 37.5 mld mps and 15 mld stp based on sbr technology with tertiary treatment for 15 mld flow including transformer dg set etc construction of stp in sector 14p ii hisar construction of main entrance gate and wicket gate and providing a
Read moreof your Industry type