Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Compressor Make Elgl, Shifting, Installation And Alignment Along With Outgoing Piping Repairing And Fitting Of Main Plant Of Kedla Washery
|
| Description |
Compressor Make Elgl, Shifting, Installation And Alignment Along With Outgoing Piping Repairing And Fitting Of Main Plant Of Kedla Washery
|
| Organisation | Coal India Limited (CIL) |
| Tender Id | 2023_CCL_281666_1 |
|
Reference Number |
PO/KW/e-Tender/23-24/16, dated 16.06.2023 |
| Tender Fee | |
| EMD | 1900 |
| Tender Value | |
| Place | Kedla Washery |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in |
| Start Date | June 20, 2023 16:30 |
| End Date |
Expired
30/06/2023
Expired 1092 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Shifting installation testing and commissioning of 1x15 kva eicher make ea from te store kandharapur to te. harraiya and associated work in oa azamgarh ba gorakhpur olt site
Shifting installation testing and commissioning of 1x15 kva eicher make ea from te store kandharapur to te. harraiya and associated work in oa azamgarh ba gorakhpur olt site
Read moreDdition / alteration/ upgration of perimeter wall and main drain along with allied facilities at sspl under ge(i) r and d delhi
Addition / alteration/ upgration of perimeter wall and main drain along with allied facilities at sspl under ge(i) r and d delhi
Read moreSupply and application of refractory castable materials and related materials, along with repair and maintenance on door delivery basis at hbl plant sugauli
Supply and application of refractory 
 castable materials and related materials, along with repair and 
 maintenance on door delivery basis at hbl plant sugauli
Read moreRepairing of stick assembly and lhs final drive assembly along with its foundation of ck300 shovel sl. no. 737 deployed at topa ocp, kuju area.
Repairing of stick assembly and lhs final drive assembly along with its foundation of ck300 shovel sl. no. 737 deployed at topa ocp, kuju area.
Read moreErection and reorganisation of main 11kv overhead line and installation of 1.6mva power transformer 11kv/3.3kv with ht panel at pit office substation with busbar arrrangement at topa ocp under kuju area.
Erection and reorganisation of main 11kv overhead line and installation of 1.6mva power transformer 11kv/3.3kv with ht panel at pit office substation with busbar arrangement at topa ocp under kuju area.
Read moreSupply, erection and civil package for extension of 400/220kv raipur (pg) s/s for installation of 1x500mva ict (4th) under the transmission scheme - augmentation of transformation capacity at 400/220kv raipur (pg) s/s by 400/220kv 1x500mva ict (4th) along with associated bays at both ends
Supply, erection and civil package for extension of 400/220kv raipur (pg) s/s for installation of 1x500mva ict (4th) under the transmission scheme - augmentation of transformation capacity at 400/220kv raipur (pg) s/s by 400/220kv 1x500mva ict (4th) along with associated bays at both ends
Read moreRepairing of various electrical switchboard of main plant of kedla washery.
Repairing of various electrical switchboard of main plant of kedla washery.
Read moreRepairing and fitting of damaged/worn-out jig bed with perforated plate 24nos. along with chamber side liners plate of coarse coal jig of main plant of kedla washery
Repairing and fitting of damaged/worn-out jig bed with perforated plate 24nos. along with chamber side liners plate of coarse coal jig of main plant of kedla washery
Read moreDismantling, repairing, re-installation, fitting and tension adjustment work in bucket elevator unit no. 222, 223 and 207 main plant of kedla washery.
Dismantling, repairing, re-installation, fitting and tension adjustment work in bucket elevator unit no. 222, 223 and 207 main plant of kedla washery.
Read moreComplete repairing of gear box of static thickener main plant of kedla washery
Complete repairing of gear box of static thickener main plant of kedla washery
Read moreof your Industry type