Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Surf Wks Bet Km Km 62.220 And Km 67.700 Under Part A And Surf Wks Bet Km 15.265 And Km 15.525 And Km 18.200 Under Part B On Road Reasi Arnas Mahore Of 110 Rcc/31 Brtf Under Project Spk In J And K (Ut) 2nd Call
|
Description |
Surf Wks Bet Km Km 62.220 And Km 67.700 Under Part A And Surf Wks Bet Km 15.265 And Km 15.525 And Km 18.200 Under Part B On Road Reasi Arnas Mahore Of 110 Rcc/31 Brtf Under Project Spk In J And K (Ut) 2nd Call
|
Organisation | Dte General Border Roads Organisation | Central Govt. Ministry/Department |
Tender Id | 2025_BRO_713917_1 |
Reference Number |
CE (P) SPK/08/2025-26 |
Tender Fee | 0 |
EMD | 6.13 Lakh |
Tender Value | |
Place | ON ROAD REASI-ARNAS-MAHORE |
Link | https://defproc.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=799362 |
Start Date | June 18, 2025 14:30 |
End Date |
01/07/2025 ( Expired 4 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Sub soil investigation, design and construction of 50 mtr span psc box girder bridge on kawlchaw nallah at km 7.980 on k-p-t road on open foundation under 71 rcc/ 24 brtf/ project pushpak in mizoram state(4th call)
Sub soil investigation, design and construction of 50 mtr span psc box girder bridge on kawlchaw nallah at km 7.980 on k-p-t road on open foundation under 71 rcc/ 24 brtf/ project pushpak in mizoram state(4th call)
Read moreImpvt wks incl investigation design and drawing proof check by iit fm km 125 pt 05 to 125 pt 250 and km 131 pt 950 to km 132 pt 110 along s k t t rd under 94 rcc 38 brtf rd sector of project deepak in hp state
Impvt wks incl investigation design and drawing proof check by iit fm km 125 pt 05 to 125 pt 250 and km 131 pt 950 to km 132 pt 110 along s k t t rd under 94 rcc 38 brtf rd sector of project deepak in hp state
Read moreP/l bc 30 mm incl correction wks with bm 50 mm and thermoplastic paint for edge marking bet km 7.00 to km 40.06 (waste shredded plastic to be used for 3.63 km length) on road mon-lungwa under 100 rcc/15 brtf sector (p) sewak in nagaland state
P/l bc 30 mm incl correction wks with bm 50 mm and thermoplastic paint for edge marking bet km 7.00 to km 40.06 (waste shredded plastic to be used for 3.63 km length) on road mon-lungwa under 100 rcc/15 brtf sector (p) sewak in nagaland state
Read moreP/l bc 30 mm incl correction wks with bm 50 mm and thermoplastic paint for edge marking bet km 18.00 to km 39.388 (waste shredded plastic to be used for 5 km length) on rd chandel-sugnu-chakpikarong under 84 rcc/25 brtf (p) sewak in manipur state
P/l bc 30 mm incl correction wks with bm 50 mm and thermoplastic paint for edge marking bet km 18.00 to km 39.388 (waste shredded plastic to be used for 5 km length) on rd chandel-sugnu-chakpikarong under 84 rcc/25 brtf (p) sewak in manipur state
Read moreProv and lay of wmm 100 mm thk,02 layers of wmm 75 mm thk, dbm 50 mm thk and bc 30 mm thk incl appli of prime and tack coat with bt emul for surf wks bet km 0.00 and km 5.00 and km 10.900 and 11.850 on road bhawani dharal of 31 tf under (p)sampark jk
Prov and lay of wmm 100 mm thk,02 layers of wmm 75 mm thk, dbm 50 mm thk and bc 30 mm thk incl appli of prime and tack coat with bt emul for surf wks bet km 0.00 and km 5.00 and km 10.900 and 11.850 on road bhawani dharal of 31 tf under (p)sampark jk
Read moreDesign and construction including ssi, proof checking from iit for 55 mtr span psc box girder bridge excluding approaches over gagrian nallah at km 0.300 on road gali-anganpathri under 79 rcc/31 brtf project sampark in jk ut 2nd call
Design and construction including ssi, proof checking from iit for 55 mtr span psc box girder bridge excluding approaches over gagrian nallah at km 0.300 on road gali-anganpathri under 79 rcc/31 brtf project sampark in jk ut 2nd call
Read moreSurf wks bet km km 62.220 and km 67.700 under part a and surf wks bet km 15.265 and km 15.525 and km 18.200 under part b on road reasi-arnas-mahore of 110 rcc/31 brtf under project spk in j and k (ut) 2nd call
Surf wks bet km km 62.220 and km 67.700 under part a and surf wks bet km 15.265 and km 15.525 and km 18.200 under part b on road reasi-arnas-mahore of 110 rcc/31 brtf under project spk in j and k (ut) 2nd call
Read moreSub soil investigation, design and construction of 50 mtr span psc box girder bridge on kawlchaw nallah at km 7.980 on k-p-t road on open foundation under 71 rcc/ 24 brtf/ project pushpak in mizoram state(3rd call)
Sub soil investigation, design and construction of 50 mtr span psc box girder bridge on kawlchaw nallah at km 7.980 on k-p-t road on open foundation under 71 rcc/ 24 brtf/ project pushpak in mizoram state(3rd call)
Read moreP and l of dbm 7.50 cm, bc 4.00 cm with hmp mix, laying by p/finisher and including cleaning of rd surface, applying p/coat and t/coat, road marking 2.5 mm thick for surf wks bet km 98.5 and km 107.2 on rd birdhwal-pugal-bajju under 101 rcc/49 brtf
P and l of dbm 7.50 cm, bc 4.00 cm with hmp mix, laying by p/finisher and including cleaning of rd surface, applying p/coat and t/coat, road marking 2.5 mm thick for surf wks bet km 98.5 and km 107.2 on rd birdhwal-pugal-bajju under 101 rcc/49 brtf
Read moreProvid, lay, spreading and compaction dbm 50 mm thick, bc 40 mm thick (all compacted thickness), prime coat and tack coat as per morth specification at 2.500 km from katra (net length 1.100 km) under 69 rcc/35 brtf/project sampark in jk 2nd call
Provid, lay, spreading and compaction dbm 50 mm thick, bc 40 mm thick (all compacted thickness), prime coat and tack coat as per morth specification at 2.500 km from katra (net length 1.100 km) under 69 rcc/35 brtf/project sampark in jk 2nd call
Read moreof your Industry type