Tender Details
Particulars | Details |
---|---|
Title |
Repairing Of 4 Nos Of Idlers Part No 3548 05 02 200 Iln1 Iln2 Il36 L Iln3applicable For Ekg 10 Rope Shovel
|
Description |
Repairing Of 4 Nos Of Idlers Part No 3548 05 02 200 Iln1 Iln2 Il36 L Iln3applicable For Ekg 10 Rope Shovel
|
Organisation | Eastern Coalfields Limited | Public Sector Undertakings |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 8200 |
Tender Value | |
Place | Sonepur Bazari Area,ECL |
Link |
AAAAAAAAAA Login to view |
Start Date | April 10, 2025 17:30 |
End Date |
21/04/2025 ( 0 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Leakage and seepage at qtr no 10/4 66/01 67/01 and 67/03 including construction of roof on main door entrance of qtr no 66/01 and 66/02 of mt platoon estt no.22 through mes dehradun under ge (p) dehradun
Leakage and seepage at qtr no 10/4 66/01 67/01 and 67/03 including construction of roof on main door entrance of qtr no 66/01 and 66/02 of mt platoon estt no.22 through mes dehradun under ge (p) dehradun
Read moreNiet no. - 02 of the fy 2025-2026 of the ee/bqa, phe dte.(2nd call)(sl.no-01)
Repairing and painting of over head reservoir (capacity 450 cum., staging height 20 mtr.), chlorination room, guard room and boundary wall with all allied works of augmentation works for belatikri, zone-b
Read moreGrant of license for supply, installation, commissioning, operation and maintenance of 02 nos. 100 ton capacity hmcs for a period of 05 years.
Grant of license for supply, installation, commissioning, operation and maintenance of 02 nos. 100 ton capacity hmcs for a period of 05 years.
Read moreThrough repairing and renovation work of 4 no nhs type quarter no nhs/339 of sri dilip paswan, nhs/05/40 of sri mahendra kewat and nhs/72/522 of sri sumit mukherjee and nhsnhs/75/540 of sri tuntun thakur at of parbelia group under sodepur area.
Through repairing and renovation work of 4 no nhs type quarter no nhs/339 of sri dilip paswan, nhs/05/40 of sri mahendra kewat and nhs/72/522 of sri sumit mukherjee and nhsnhs/75/540 of sri tuntun thakur at of parbelia group under sodepur area.
Read moreClustered project for construction of 02 two nos rcc sluice gate at khushamara gp and jamjuri gp and 01 one no anti erosion work along the left bank of gomati river under udaipur municipal council fdr work to river bank protection by cc block at umc
Clustered project for construction of 02 two nos rcc sluice gate at khushamara gp and jamjuri gp and 01 one no anti erosion work along the left bank of gomati river under udaipur municipal council fdr work to river bank protection by cc block at umc
Read moreProviding assistance for the mechanical maintenance work of mill outlet to reject silo part of mill reject handling system for unit no. 10 and 11, stps, sarni.
Providing assistance for the mechanical maintenance work of mill outlet to reject silo part of mill reject handling system for unit no. 10 and 11, stps, sarni.
Read moreR/e of lt line s/f of led street light and cabling work s/f of 150 ltr capacity 02 no water cooler 4 kva steblizer water cooler cage construction of tubewell s/f of 01hp submersible pump for water cooler 2 nos and cabling work at nmy mirzapur
R/e of lt line s/f of led street light and cabling work s/f of 150 ltr capacity 02 no water cooler 4 kva steblizer water cooler cage construction of tubewell s/f of 01hp submersible pump for water cooler 2 nos and cabling work at nmy mirzapur
Read moreProcurement of 10 nos of tractor mounted suction unit for lifting sludge along with annual maintenance contract for 4 years
Procurement of 10 nos of tractor mounted suction unit for lifting sludge along with annual maintenance contract for 4 years
Read moreRepairing/rebuilding of worn out housing of arm(02 no.), boom (02 nos. ) boom cylinder foot pin ( 02 nos.), arm cylinder eye (04 nos.), boom foot housing (02 no.) and bucket cylinder eye (02 nos.) and then co-axial line boring to its original size i
Repairing/rebuilding of worn out housing of arm(02 no.), boom (02 nos. ) boom cylinder foot pin ( 02 nos.), arm cylinder eye (04 nos.), boom foot housing (02 no.) and bucket cylinder eye (02 nos.) and then co-axial line boring to its original size i
Read moreOffloading work to outside agency towards complete repairing and reconditioning of 02 nos rotary motors lhs and rhs part no 1ps4866 of recp750 electric drills of dudhichua project
Offloading work to outside agency towards complete repairing and reconditioning of 02 nos rotary motors lhs and rhs part no 1ps4866 of recp750 electric drills of dudhichua project
Read moreof your Industry type