Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Construction Of Msh 12 To Ganeshpur Mairaldoha Pimpri Nimbi Monali Shelgaon To Sh 289 Road Mdr 65 Km. 2/00 To 4/00, 5/00 To 11/00 Tq. Malegaon
|
Description |
Construction Of Msh 12 To Ganeshpur Mairaldoha Pimpri Nimbi Monali Shelgaon To Sh 289 Road Mdr 65 Km. 2/00 To 4/00, 5/00 To 11/00 Tq. Malegaon
|
Organisation | Public Works Region | State Govt. and UT |
Tender Id | 2024_PWR_1016329_4 |
Reference Number |
AKL/WSM/ETN-61/2023-24 |
Tender Fee | 3540 |
EMD | 3.62 Lakh |
Tender Value | |
Place | WORK |
Link | https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1777813 |
Start Date | March 13, 2024 22:55 |
End Date |
20/03/2024 ( Expired 473 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Consultancy services for authoritys engineer for supervision of construction of damteng selungthi lungar chuna road (package 2) from km 7.40 to km 57.5 nhsl specifications (design chainage km 7.45 to km 56.29 and length 48.84 km)
Consultancy services for authoritys engineer for supervision of construction of damteng selungthi lungar chuna road (package 2) from km 7.40 to km 57.5 nhsl specifications (design chainage km 7.45 to km 56.29 and length 48.84 km)
Read moreConsultancy services for detailed project report (dpr) for construction of 4/6-lane ring road / bypass (180 km) to decongest nh-66 in the state of goa.
Consultancy services for detailed project report (dpr) for construction of 4/6-lane ring road / bypass (180 km) to decongest nh-66 in the state of goa.
Read moreConsultancy services for preparation of detailed project report (dpr) for construction of 4 lane elevated corridor from natesan nagar rob (km 38.220 of nh-45a) to ariyankuppam bridge (km 40.780 of nh-45a) and widening of existing road to 4 lane road
Consultancy services for preparation of detailed project report (dpr) for construction of 4 lane elevated corridor from natesan nagar rob (km 38.220 of nh-45a) to ariyankuppam bridge (km 40.780 of nh-45a) and widening of existing road to 4 lane road
Read moreConsultancy services for feasibility study and dpr preparation for construction of 4 lane road from kadapa to rangampeta cross via rayachoti pileru of nh 40 from km 199.0 to km 337.800 excluding guvvalacheruvu ghat tunnel in the state of ap
Consultancy services for feasibility study and dpr preparation for construction of 4 lane road from kadapa to rangampeta cross via rayachoti pileru of nh 40 from km 199.0 to km 337.800 excluding guvvalacheruvu ghat tunnel in the state of ap
Read moreUpgradation of abohar fazilka 4 lane plus ps road from km 0.00 to 7.00 fz-odr-08 (abohar city portion) in district fazilka including maintenance for 5 years (01 year defect liability period plus 04 years routine maintenance period)
Upgradation of abohar fazilka 4 lane plus ps road from km 0.00 to 7.00 fz-odr-08 (abohar city portion) in district fazilka including maintenance for 5 years (01 year defect liability period plus 04 years routine maintenance period)
Read moreRenewal work of karauli hindaun mahwa road (sh 22) from km. 40/0 to km. 65/0 and km. 72/355 to km. 105/293
Renewal work of karauli hindaun mahwa road (sh 22) from km. 40/0 to km. 65/0 and km. 72/355 to km. 105/293
Read moreRehabilitation upgradation of existing road to 2 lane 4 lane with paved shoulders configuration of murum alur waghdari akkalkot nagansur tolnur maharashtra state border nh 548b design chainage km 289.300 to 342.890 length 52.556 km approx) distr
Rehabilitation upgradation of existing road to 2 lane 4 lane with paved shoulders configuration of murum alur waghdari akkalkot nagansur tolnur maharashtra state border nh 548b design chainage km 289.300 to 342.890 length 52.556 km approx) distr
Read moreConstruction of 98.0 m 2-span steel truss bridge over abohar branch rd-180265 feet on link road jagraon to hathur to dallah, mallah, chakkar road t-01 from km. 0.000 to km. 24.580 under pmgsy-lll batch-3 in district ludhiana. package no. pb-10-135a
Construction of 98.0 m 2-span steel truss bridge over abohar branch rd-180265 feet on link road jagraon to hathur to dallah, mallah, chakkar road t-01 from km. 0.000 to km. 24.580 under pmgsy-lll batch-3 in district ludhiana. package no. pb-10-135a
Read moreFdr mtc. of road from old agartala-chandrapur road to bro bypass road via west champamura tribal basti (l 2.70 km) under khayerpur pwd(r and b) sub-division during the year 2025-26 sh construction of 01 (one) no rcc boxcell (3.00 x 3.00 mtr)
Fdr mtc. of road from old agartala-chandrapur road to bro bypass road via west champamura tribal basti (l 2.70 km) under khayerpur pwd(r and b) sub-division during the year 2025-26 sh construction of 01 (one) no rcc boxcell (3.00 x 3.00 mtr)
Read moreFdr mtc. of road from ranirgaon (karaibon) to jarulbachai via bagbari, babaniapara (l 9.56 km) under khayerpur pwd(r and b) sub division during the year 2025-26 sh construction of 01 (one) no rcc box cell (4.00 x 4.00 mtr) at ch. 8.25 km.
Fdr mtc. of road from ranirgaon (karaibon) to jarulbachai via bagbari, babaniapara (l 9.56 km) under khayerpur pwd(r and b) sub division during the year 2025-26 sh construction of 01 (one) no rcc box cell (4.00 x 4.00 mtr) at ch. 8.25 km.
Read moreof your Industry type