Tender Details

Particulars Details
Title
Construction Of Msh 12 To Ganeshpur Mairaldoha Pimpri Nimbi Monali Shelgaon To Sh 289 Road Mdr 65 Km. 2/00 To 4/00, 5/00 To 11/00 Tq. Malegaon
Description
Construction Of Msh 12 To Ganeshpur Mairaldoha Pimpri Nimbi Monali Shelgaon To Sh 289 Road Mdr 65 Km. 2/00 To 4/00, 5/00 To 11/00 Tq. Malegaon
Organisation Public Works Region | State Govt. and UT
Tender Id 2024_PWR_1016329_4
Reference
Number
AKL/WSM/ETN-61/2023-24
Tender Fee 3540
EMD 3.62 Lakh
Tender Value
Place WORK
Link https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1777813
Start Date March 13, 2024 22:55
End Date

20/03/2024 ( Expired 473 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Consultancy services for authoritys engineer for supervision of construction of damteng selungthi lungar chuna road (package 2) from km 7.40 to km 57.5 nhsl specifications (design chainage km 7.45 to km 56.29 and length 48.84 km)

Consultancy services for authoritys engineer for supervision of construction of damteng selungthi lungar chuna road (package 2) from km 7.40 to km 57.5 nhsl specifications (design chainage km 7.45 to km 56.29 and length 48.84 km)

Read more
Consultancy services for detailed project report (dpr) for construction of 4/6-lane ring road / bypass (180 km) to decongest nh-66 in the state of goa.

Consultancy services for detailed project report (dpr) for construction of 4/6-lane ring road / bypass (180 km) to decongest nh-66 in the state of goa.

Read more
Consultancy services for preparation of detailed project report (dpr) for construction of 4 lane elevated corridor from natesan nagar rob (km 38.220 of nh-45a) to ariyankuppam bridge (km 40.780 of nh-45a) and widening of existing road to 4 lane road

Consultancy services for preparation of detailed project report (dpr) for construction of 4 lane elevated corridor from natesan nagar rob (km 38.220 of nh-45a) to ariyankuppam bridge (km 40.780 of nh-45a) and widening of existing road to 4 lane road

Read more
Consultancy services for feasibility study and dpr preparation for construction of 4 lane road from kadapa to rangampeta cross via rayachoti pileru of nh 40 from km 199.0 to km 337.800 excluding guvvalacheruvu ghat tunnel in the state of ap

Consultancy services for feasibility study and dpr preparation for construction of 4 lane road from kadapa to rangampeta cross via rayachoti pileru of nh 40 from km 199.0 to km 337.800 excluding guvvalacheruvu ghat tunnel in the state of ap

Read more
Upgradation of abohar fazilka 4 lane plus ps road from km 0.00 to 7.00 fz-odr-08 (abohar city portion) in district fazilka including maintenance for 5 years (01 year defect liability period plus 04 years routine maintenance period)

Upgradation of abohar fazilka 4 lane plus ps road from km 0.00 to 7.00 fz-odr-08 (abohar city portion) in district fazilka including maintenance for 5 years (01 year defect liability period plus 04 years routine maintenance period)

Read more
Renewal work of karauli hindaun mahwa road (sh 22) from km. 40/0 to km. 65/0 and km. 72/355 to km. 105/293

Renewal work of karauli hindaun mahwa road (sh 22) from km. 40/0 to km. 65/0 and km. 72/355 to km. 105/293

Read more
Rehabilitation upgradation of existing road to 2 lane 4 lane with paved shoulders configuration of murum alur waghdari akkalkot nagansur tolnur maharashtra state border nh 548b design chainage km 289.300 to 342.890 length 52.556 km approx) distr

Rehabilitation upgradation of existing road to 2 lane 4 lane with paved shoulders configuration of murum alur waghdari akkalkot nagansur tolnur maharashtra state border nh 548b design chainage km 289.300 to 342.890 length 52.556 km approx) distr

Read more
Construction of 98.0 m 2-span steel truss bridge over abohar branch rd-180265 feet on link road jagraon to hathur to dallah, mallah, chakkar road t-01 from km. 0.000 to km. 24.580 under pmgsy-lll batch-3 in district ludhiana. package no. pb-10-135a

Construction of 98.0 m 2-span steel truss bridge over abohar branch rd-180265 feet on link road jagraon to hathur to dallah, mallah, chakkar road t-01 from km. 0.000 to km. 24.580 under pmgsy-lll batch-3 in district ludhiana. package no. pb-10-135a

Read more
Fdr mtc. of road from old agartala-chandrapur road to bro bypass road via west champamura tribal basti (l 2.70 km) under khayerpur pwd(r and b) sub-division during the year 2025-26 sh construction of 01 (one) no rcc boxcell (3.00 x 3.00 mtr)

Fdr mtc. of road from old agartala-chandrapur road to bro bypass road via west champamura tribal basti (l 2.70 km) under khayerpur pwd(r and b) sub-division during the year 2025-26 sh construction of 01 (one) no rcc boxcell (3.00 x 3.00 mtr)

Read more
Fdr mtc. of road from ranirgaon (karaibon) to jarulbachai via bagbari, babaniapara (l 9.56 km) under khayerpur pwd(r and b) sub division during the year 2025-26 sh construction of 01 (one) no rcc box cell (4.00 x 4.00 mtr) at ch. 8.25 km.

Fdr mtc. of road from ranirgaon (karaibon) to jarulbachai via bagbari, babaniapara (l 9.56 km) under khayerpur pwd(r and b) sub division during the year 2025-26 sh construction of 01 (one) no rcc box cell (4.00 x 4.00 mtr) at ch. 8.25 km.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise