Tender Details
Particulars | Details |
---|---|
Title |
Widening And Improvement Of Road From Msh 2 To Devgaon Kusali Malegaon To Kawadgaon Mdr 19 Km 3/00 To 13/500 Tq. Badnapur
|
Description |
Widening And Improvement Of Road From Msh 2 To Devgaon Kusali Malegaon To Kawadgaon Mdr 19 Km 3/00 To 13/500 Tq. Badnapur
|
Organisation | Public Works Region | State Govt. and UT |
Tender Id | 2024_PWR_1008317_1 |
Reference Number |
E TENDER NOTICE NO 54/01 FOR 2023-24 |
Tender Fee | 3540 |
EMD | 3.43 Lakh |
Tender Value | |
Place | BADNAPUR |
Link | https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1763463 |
Start Date | February 16, 2024 22:30 |
End Date |
01/03/2024 ( Expired 448 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Revised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)
Revised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)
Read moreImprovement strengthening of existing carriageway including widening of 2 lane section to 4 lane between km. 0.00 to km.12.30 in tumakuru town limit and 4 laning from design km 53.80 to design km 56.05 of nh 206 in kibbanahalli village tumakuru distr
Improvement strengthening of existing carriageway including widening of 2 lane section to 4 lane between km. 0.00 to km.12.30 in tumakuru town limit and 4 laning from design km 53.80 to design km 56.05 of nh 206 in kibbanahalli village tumakuru distr
Read moreConstruction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn
Construction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn
Read moreConstruction of two lane road of submerged length from km-5.90 to 7.575 and km. 32.275 to 33.400 of bhopalpatnam venktapura warangal hyderabad road of nh163 in the state of chhattisgarh.
Construction of two lane road of submerged length from km-5.90 to 7.575 and km. 32.275 to 33.400 of bhopalpatnam venktapura warangal hyderabad road of nh163 in the state of chhattisgarh.
Read moreRehabilitation and up.gradation of guhagar chiplun helwak road from existing km 26.890 to 403.610, design km 26.230 to 403.000 nh 166 e length 13.77 km two lanes with paved shoulders configuration in the state of maharashtra on engineering, procureme
Rehabilitation and up.gradation of guhagar chiplun helwak road from existing km 26.890 to 403.610, design km 26.230 to 403.000 nh 166 e length 13.77 km two lanes with paved shoulders configuration in the state of maharashtra on engineering, procureme
Read moreProviding road safety measures at morth/police identified locations based on accident data of 2017-19,2018-20 and 2019-21 from km.34.144 (kothur) to km.80.306 (jadcherla) of hyderabad bangalore section of nh-44 in the state of telangana
Providing road safety measures at morth/police identified locations based on accident data of 2017-19,2018-20 and 2019-21 from km.34.144 (kothur) to km.80.306 (jadcherla) of hyderabad bangalore section of nh-44 in the state of telangana
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreOne time improvement of bypassed stretches from km 0 700 to 2 700 km 4 300 to 5 600 km 6 000 to 7 500 of maharashtra state border to bodhan section of nh63 extended in the state of telangana
One time improvement of bypassed stretches from km 0 700 to 2 700 km 4 300 to 5 600 km 6 000 to 7 500 of maharashtra state border to bodhan section of nh63 extended in the state of telangana
Read morePeriodical renewal of pmgsy handed over road from mandwi to chachu bazaar (t01) (l 9.533 km) (package no. tr-01 199 u) under the performance incentive of pmgsy under mandwi pwd(r and b) sub division, mandwi block during the year 2024-25
Periodical renewal of pmgsy handed over road from mandwi to chachu bazaar (t01) (l 9.533 km) (package no. tr-01 199 u) under the performance incentive of pmgsy under mandwi pwd(r and b) sub division, mandwi block during the year 2024-25
Read moreShort term maintenance contracts from km 308/4 - 309/815, km 312/0 - 316/0 and km 324/4 -328/2 of nh 948 - bangalore -sathyamangalam -coimbatore road in the state of tamil nadu for the year 2024-25
Short term maintenance contracts from km 308/4 - 309/815, km 312/0 - 316/0 and km 324/4 -328/2 of nh 948 - bangalore -sathyamangalam -coimbatore road in the state of tamil nadu for the year 2024-25
Read moreof your Industry type