Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Ttps Operation Circle Mpm Ii Unit Iv V Overhauling Of Roller Journal Assembly And Renewal Of Wornout Grinding Rolls Of Hp 803 Mills For A Period From 01.04.2025 To 31.03.2026
|
Description |
Ttps Operation Circle Mpm Ii Unit Iv V Overhauling Of Roller Journal Assembly And Renewal Of Wornout Grinding Rolls Of Hp 803 Mills For A Period From 01.04.2025 To 31.03.2026
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2025_EB_527389_1 |
Reference Number |
CE/SE/O/TTPS/Spec.No.58/25-26 |
Tender Fee | 0 |
EMD | 19900 |
Tender Value | |
Place | TTPS |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=628016 |
Start Date | February 24, 2025 19:30 |
End Date |
10/03/2025 ( Expired 110 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ttps operation circle cad reconditioning of 1600mm dia butterfly valves in condenser cooling water inlet and outlet pipe lines in east side and west side of unit iv and v
Ttps operation circle cad reconditioning of 1600mm dia butterfly valves in condenser cooling water inlet and outlet pipe lines in east side and west side of unit iv and v
Read moreTtps operation circle mpm-ii ac plant renewing of 250 nb spray header pipe of length 12 mtrs in unit iv and v air washer system
Ttps operation circle mpm-ii ac plant renewing of 250 nb spray header pipe of length 12 mtrs in unit iv and v air washer system
Read moreTtps operation circle mpm i unit iii removal of all the damaged insulation in the hot primary air ducts from air preheaters to mills and insulating the ducts with lrb wool mattresses and cladding with g.i sheet of 0.63mm thickness and removal of ash
Ttps operation circle mpm i unit iii removal of all the damaged insulation in the hot primary air ducts from air preheaters to mills and insulating the ducts with lrb wool mattresses and cladding with g.i sheet of 0.63mm thickness and removal of ash
Read moreTtps operation circle mpm i unit iii overhauling of mill gear box, under bowl, separator top assembly etc., of mills during the forthcoming overhaul
Ttps operation circle mpm i unit iii overhauling of mill gear box, under bowl, separator top assembly etc., of mills during the forthcoming overhaul
Read moreTtps operation circle mpmii unit iv and v replacing the worn out journal head assembly by reconditioned sets in hp 803 mills
Ttps operation circle mpmii unit iv and v replacing the worn out journal head assembly by reconditioned sets in hp 803 mills
Read moreTtps operation circle mpm i unit iii overhauling and reconditioning of hot and cold air dampers, gates, ducts, replacement of expansion joints, seal air fan and cleaning of accumulated fly ash deposited inside the horizontal portion of the hot
Ttps operation circle mpm i unit iii overhauling and reconditioning of hot and cold air dampers, gates, ducts, replacement of expansion joints, seal air fan and cleaning of accumulated fly ash deposited inside the horizontal portion of the hot
Read moreTtps operation circle mpm ii unit iv and v reconditioning of the worn out journal head assembly released from unit iv and v hp 803 mills and assembling with pillow blocks
Ttps operation circle mpm ii unit iv and v reconditioning of the worn out journal head assembly released from unit iv and v hp 803 mills and assembling with pillow blocks
Read moreTtps operation circle cad acwph unit i, ii iii annual overhauling cleaning and painting of cooling tower pipes in acw system
Ttps operation circle cad acwph unit i, ii iii annual overhauling cleaning and painting of cooling tower pipes in acw system
Read moreTtps operation circle mpm i unit iii replacement of eroded coal pipe lines, bends and fittings between mills d, e and f and boiler during the forthcoming overhaul.
Ttps operation circle mpm i unit iii replacement of eroded coal pipe lines, bends and fittings between mills d, e and f and boiler during the forthcoming overhaul.
Read moreTtps operation circle mpm i unit iii replacement of eroded coal pipe lines, bends and fittings between mills a, b and c and boiler during the forthcoming overhaul
Ttps operation circle mpm i unit iii replacement of eroded coal pipe lines, bends and fittings between mills a, b and c and boiler during the forthcoming overhaul
Read moreof your Industry type