Tender Details
Particulars | Details |
---|---|
Title |
Ttps Operation Circle Mpm I Unit Iii Overhauling Of Roller Journal Assembly And Replacement Of Worn Out Grinding Roller For The Period From 01.04.2025 To 31.03.2026
|
Description |
Ttps Operation Circle Mpm I Unit Iii Overhauling Of Roller Journal Assembly And Replacement Of Worn Out Grinding Roller For The Period From 01.04.2025 To 31.03.2026
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2025_EB_527009_1 |
Reference Number |
CE/SE/O/TTPS/Spec.No.50/25-26 |
Tender Fee | 0 |
EMD | 12000 |
Tender Value | |
Place | TTPS |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=627535 |
Start Date | February 24, 2025 15:40 |
End Date |
10/03/2025 ( Expired 64 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Maintaining the buildings, sweeping of roads and plucking of grass in switch yard area and maintaining the plants and lawns at 400 kv ss suryapet in yadadri-bhongirir district for the period from 01.06.2025 to 31.03.2026 in omc, nalgonda
Maintaining the buildings, sweeping of roads and plucking of grass in switch yard area and maintaining the plants and lawns at 400kv ss suryapet in yadadri-bhongir district for the period from 01.06.2025 to 31.03.2026 in omc, nalgonda
Read moreCarrying out routine, patrolling, prive / breakdown maintenance of transmission line under transmission sub division, giridih for the period from 16.06.2025 to 31.03.2026 (i.e. 9.5 months) for f.y. 2025-26.
Carrying out routine, patrolling, prive / breakdown maintenance of transmission line under transmission sub division, giridih for the period from 16.06.2025 to 31.03.2026 (i.e. 9.5 months) for f.y. 2025-26.
Read moreCarrying out routine, patrolling, prive / breakdown maintenance of transmission line under transmission sub division, jasidih for the period from 16.06.2025 to 31.03.2026 (i.e. 9.5 months) for f.y. 2025-26
Carrying out routine, patrolling, prive / breakdown maintenance of transmission line under transmission sub division, jasidih for the period from 16.06.2025 to 31.03.2026 (i.e. 9.5 months) for f.y. 2025-26
Read moreNctps i se m ii circle ichs dn replacement of the worn out damaged rail track of reclaimer i stacker i in conveyor 7 at the side of coal yard 2 from 345 m to 696 m
Nctps i se m ii circle ichs dn replacement of the worn out damaged rail track of reclaimer i stacker i in conveyor 7 at the side of coal yard 2 from 345 m to 696 m
Read moreMtps i bm lift operation of boiler lifts i to iv and attending routine maintenance and minor repair works of boiler lift ii and its accessories for one year from the date of commencement of works for 2025 26
Mtps i bm lift operation of boiler lifts i to iv and attending routine maintenance and minor repair works of boiler lift ii and its accessories for one year from the date of commencement of works for 2025 26
Read moreHiring of 1 no skilled wcl l1 services at ps 3 dispensary to carry out various misc jobs such as assistance in maintenance of records and assistance in other day to day office jobs for a period of four years from 01 07 2025 to 30 06 2029
Hiring of 1 no skilled wcl l1 services at ps 3 dispensary to carry out various misc jobs such as assistance in maintenance of records and assistance in other day to day office jobs for a period of four years from 01 07 2025 to 30 06 2029
Read moreOperation, running, maintenance and management of boats and shikara at thermal plant, lake no 3, bathinda for the period from 01.04.2025 to 31.03.2026 extendable upto 10 years
Operation, running, maintenance and management of boats and shikara at thermal plant, lake no 3, bathinda for the period from 01.04.2025 to 31.03.2026 extendable upto 10 years
Read moreBtps-tggenco
Btps - chp - replacement of new/reconditioned rollers and frames, fabricated and erection of skirt rubber, flap gates and di plates etc. for periodical and breakdown maintenance of belt conveyors as and when required for the conveyor bcn - 1a/b of sec - i of mm- i sub division in mm/chp/btps for the period from 01.04.2025 or from the actual date of commencement of work to 31.03.2026
Read moreBtps-tggenco
Btps - chp - replacement of new/reconditioned rollers and frames, fabrication and erection of skirt rubber, flap gates and di plates, actuators, guide pipes, er weight structure, oil top up and greasing etc for periodical and breakdown maintenance of belt conveyors as and when required for the conveyor bcn-2a/b of sec-ii of mm-i sub division of mm/chp/btps for the period from 01.04.2025 or from actual date of commencement of work to 31.03.2026.
Read moreOperation and maintenance including routine maintenance and incident management of four laning of ambala-pehowa balance length section of nh-152 from km 0.000 to km 3.700 and from km. 46.200 to 95.360 in the state of haryana for a period of 1 year
Operation and maintenance including routine maintenance and incident management of four laning of ambala-pehowa balance length section of nh-152 from km 0.000 to km 3.700 and from km. 46.200 to 95.360 in the state of haryana for a period of 1 year
Read moreof your Industry type