Tender Details
Particulars | Details |
---|---|
Title |
Ttps Operation Circle Mpm I Unit Ii Overhauling Of Roller Journal Assembly And Replacement Of Worn Out Grinding Roller For The Period From 01.04.2025 To 31.03.2026
|
Description |
Ttps Operation Circle Mpm I Unit Ii Overhauling Of Roller Journal Assembly And Replacement Of Worn Out Grinding Roller For The Period From 01.04.2025 To 31.03.2026
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2025_EB_527002_1 |
Reference Number |
CE/SE/O/TTPS/Spec.No.49/25-26 |
Tender Fee | 0 |
EMD | 10300 |
Tender Value | |
Place | TTPS |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=627529 |
Start Date | February 24, 2025 15:40 |
End Date |
10/03/2025 ( Expired 64 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Maintaining the buildings, sweeping of roads and plucking of grass in switch yard area and maintaining the plants and lawns at 400 kv ss suryapet in yadadri-bhongirir district for the period from 01.06.2025 to 31.03.2026 in omc, nalgonda
Maintaining the buildings, sweeping of roads and plucking of grass in switch yard area and maintaining the plants and lawns at 400kv ss suryapet in yadadri-bhongir district for the period from 01.06.2025 to 31.03.2026 in omc, nalgonda
Read moreDesign, engineering, manufacture, survey, supply, transportation, erection, testing n commissioning for (i) thickening of existing 33 kv khellani-doda-ii line and (ii) erection of new 33kv line on acsr wolf conductor from bheli ghat to dhara
Design, engineering, manufacture, survey, supply, transportation, erection, testing n commissioning for (i) thickening of existing 33 kv khellani-doda-ii line and (ii) erection of new 33kv line on acsr wolf conductor from bheli ghat to dhara
Read moreRepair to plumbing, kitchen, bath, wc, sunken floor and connected works of age b/r-i (zone-ii) and repair/replacement of roof sheet, roof treatment, seepage, sunken floor, floor tiling and sanitary fittings for zone-ii incl 162 mh at dinjan mil stn
Repair to plumbing, kitchen, bath, wc, sunken floor and connected works of age b/r-i (zone-ii) and repair/replacement of roof sheet, roof treatment, seepage, sunken floor, floor tiling and sanitary fittings for zone-ii incl 162 mh at dinjan mil stn
Read moreCarrying out routine, patrolling, prive / breakdown maintenance of transmission line under transmission sub division, giridih for the period from 16.06.2025 to 31.03.2026 (i.e. 9.5 months) for f.y. 2025-26.
Carrying out routine, patrolling, prive / breakdown maintenance of transmission line under transmission sub division, giridih for the period from 16.06.2025 to 31.03.2026 (i.e. 9.5 months) for f.y. 2025-26.
Read moreCarrying out routine, patrolling, prive / breakdown maintenance of transmission line under transmission sub division, jasidih for the period from 16.06.2025 to 31.03.2026 (i.e. 9.5 months) for f.y. 2025-26
Carrying out routine, patrolling, prive / breakdown maintenance of transmission line under transmission sub division, jasidih for the period from 16.06.2025 to 31.03.2026 (i.e. 9.5 months) for f.y. 2025-26
Read moreSealing services for attending ash leakages from pent house/ wind box (inc material and man power) in annual overhaul (aoh) of the units for boiler of unit-2 2x600 mw, stage-i, and for boiler of unit-4 2x660 mw, stage-ii, sstpp, mppgcl, dongalia
Sealing services for attending ash leakages from pent house/ wind box (inc material and man power) in annual overhaul (aoh) of the units for boiler of unit-2 2x600 mw, stage-i, and for boiler of unit-4 2x660 mw, stage-ii, sstpp, mppgcl, dongalia
Read moreMtps i bm lift operation of boiler lifts i to iv and attending routine maintenance and minor repair works of boiler lift ii and its accessories for one year from the date of commencement of works for 2025 26
Mtps i bm lift operation of boiler lifts i to iv and attending routine maintenance and minor repair works of boiler lift ii and its accessories for one year from the date of commencement of works for 2025 26
Read moreNctps i se m ii circle ichs dn replacement of the worn out damaged rail track of reclaimer i stacker i in conveyor 7 at the side of coal yard 2 from 345 m to 696 m
Nctps i se m ii circle ichs dn replacement of the worn out damaged rail track of reclaimer i stacker i in conveyor 7 at the side of coal yard 2 from 345 m to 696 m
Read moreHiring of 1 no skilled wcl l1 services at ps 3 dispensary to carry out various misc jobs such as assistance in maintenance of records and assistance in other day to day office jobs for a period of four years from 01 07 2025 to 30 06 2029
Hiring of 1 no skilled wcl l1 services at ps 3 dispensary to carry out various misc jobs such as assistance in maintenance of records and assistance in other day to day office jobs for a period of four years from 01 07 2025 to 30 06 2029
Read moreProcurement of expansion joint between economizer outlet to air pre heater inlet damper for unit i and ii
Procurement of expansion joint between economizer outlet to air pre heater inlet damper for unit i and ii
Read moreof your Industry type