Tender Details

Particulars Details
Title
Ttps Operation Circle Mpm I Unit I Overhauling Of Roller Journal Assembly And Replacement Of Worn Out Grinding Roller For The Period From 01.04.2025 To 31.03.2026
Description
Ttps Operation Circle Mpm I Unit I Overhauling Of Roller Journal Assembly And Replacement Of Worn Out Grinding Roller For The Period From 01.04.2025 To 31.03.2026
Organisation TNEB Limited | State Govt. and UT
Tender Id 2025_EB_527001_1
Reference
Number
CE/SE/O/TTPS/Spec.No.48/25-26
Tender Fee 0
EMD 10300
Tender Value
Place TTPS
Link https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=627527
Start Date February 24, 2025 15:40
End Date

10/03/2025 ( Expired 91 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Appointment of issuing bank for a letter of credit

Invitation to act as issuing bank for an aggregate/portfolio letter of credit (lc) to cover three sub-projects, such lc backstopped by a guarantee from the international bank for reconstruction and development (ibrd) to support the sngrbp

Read more
Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)

Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)

Read more
Consultancy services as ie during o and m period for the project two laning with paved shoulders of aligarh-moradabad section of nh-509 from km. 79.000 to km.232.020 in the state of uttar pradesh on performance -based maintenance contract (pbmc)

Consultancy services as ie during o and m period for the project two laning with paved shoulders of aligarh-moradabad section of nh-509 from km. 79.000 to km.232.020 in the state of uttar pradesh on performance -based maintenance contract (pbmc)

Read more
Construction of mor sagar artificial reservoir and feeder from bisalpur to mor sagar artificial reservoir, including all components with its o and m for a period of 20 years on hybrid annuity model (ercp-11-09-tf-5

Construction of mor sagar artificial reservoir and feeder from bisalpur to mor sagar artificial reservoir, including all components with its o and m for a period of 20 years on hybrid annuity model (ercp-11-09-tf-5

Read more
Rehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode

Rehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode

Read more
Ie services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii

Ie services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii

Read more
Calibration (compulsory) of various instruments and accessories related to different testing instruments of iotl, durgapur from nabl accredited laboratory for period of three years

Calibration (compulsory) of various instruments and accessories related to different testing instruments of iotl, durgapur from nabl accredited laboratory for period of three years

Read more
Manual loading of rajphos and grinding unit and its loading at railway siding

Manual loading of rajphos bags into trucks, transportation from grinding unit, jhamarkotra mines to railway siding, unloading, proper stacking and loading into railway wagons&amp#x0d at railway siding, udaipur&amp#x0d

Read more
Cs for preparation of detailed project report of capacity augmentation (from 2 to 4 lane) of (i) manoharpur dausa section and lalsot kothun section of nh 148/23 and (ii) salasar nagaur section of nh 58 in the state of rajasthan

Cs for preparation of detailed project report of capacity augmentation (from 2 to 4 lane) of (i) manoharpur dausa section and lalsot kothun section of nh 148/23 and (ii) salasar nagaur section of nh 58 in the state of rajasthan

Read more
Procurement of spares of lp turbine shaft sealing and casing assembly for overhauling of unit no 9, dtps, htps, kasimpur

Procurement of spares of lp turbine shaft sealing and casing assembly for overhauling of unit no 9, dtps, htps, kasimpur

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise