Tender Details
Particulars | Details |
---|---|
Title |
Ttps Operation Circle Mpm I Unit I Overhauling Of Roller Journal Assembly And Replacement Of Worn Out Grinding Roller For The Period From 01.04.2025 To 31.03.2026
|
Description |
Ttps Operation Circle Mpm I Unit I Overhauling Of Roller Journal Assembly And Replacement Of Worn Out Grinding Roller For The Period From 01.04.2025 To 31.03.2026
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2025_EB_527001_1 |
Reference Number |
CE/SE/O/TTPS/Spec.No.48/25-26 |
Tender Fee | 0 |
EMD | 10300 |
Tender Value | |
Place | TTPS |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=627527 |
Start Date | February 24, 2025 15:40 |
End Date |
10/03/2025 ( Expired 91 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Appointment of issuing bank for a letter of credit
Invitation to act as issuing bank for an aggregate/portfolio letter of credit (lc) to cover three sub-projects, such lc backstopped by a guarantee from the international bank for reconstruction and development (ibrd) to support the sngrbp
Read moreIndependent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)
Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)
Read moreConsultancy services as ie during o and m period for the project two laning with paved shoulders of aligarh-moradabad section of nh-509 from km. 79.000 to km.232.020 in the state of uttar pradesh on performance -based maintenance contract (pbmc)
Consultancy services as ie during o and m period for the project two laning with paved shoulders of aligarh-moradabad section of nh-509 from km. 79.000 to km.232.020 in the state of uttar pradesh on performance -based maintenance contract (pbmc)
Read moreConstruction of mor sagar artificial reservoir and feeder from bisalpur to mor sagar artificial reservoir, including all components with its o and m for a period of 20 years on hybrid annuity model (ercp-11-09-tf-5
Construction of mor sagar artificial reservoir and feeder from bisalpur to mor sagar artificial reservoir, including all components with its o and m for a period of 20 years on hybrid annuity model (ercp-11-09-tf-5
Read moreRehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Rehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Read moreIe services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii
Ie services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii
Read moreCalibration (compulsory) of various instruments and accessories related to different testing instruments of iotl, durgapur from nabl accredited laboratory for period of three years
Calibration (compulsory) of various instruments and accessories related to different testing instruments of iotl, durgapur from nabl accredited laboratory for period of three years
Read moreManual loading of rajphos and grinding unit and its loading at railway siding
Manual loading of rajphos bags into trucks, transportation from grinding unit, jhamarkotra mines to railway siding, unloading, proper stacking and loading into railway wagons&#x0d at railway siding, udaipur&#x0d
Read moreCs for preparation of detailed project report of capacity augmentation (from 2 to 4 lane) of (i) manoharpur dausa section and lalsot kothun section of nh 148/23 and (ii) salasar nagaur section of nh 58 in the state of rajasthan
Cs for preparation of detailed project report of capacity augmentation (from 2 to 4 lane) of (i) manoharpur dausa section and lalsot kothun section of nh 148/23 and (ii) salasar nagaur section of nh 58 in the state of rajasthan
Read moreProcurement of spares of lp turbine shaft sealing and casing assembly for overhauling of unit no 9, dtps, htps, kasimpur
Procurement of spares of lp turbine shaft sealing and casing assembly for overhauling of unit no 9, dtps, htps, kasimpur
Read moreof your Industry type