Tender Details
Particulars | Details |
---|---|
Title |
Laying Of New Paver Block From 67/7 To 108/7 And 110/7 To 148/7 In Ward No. 25 Under Zone No. 06
|
Description |
Laying Of New Paver Block From 67/7 To 108/7 And 110/7 To 148/7 In Ward No. 25 Under Zone No. 06
|
Organisation | Directorate Urban Administration and Development | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 5295 |
EMD | 18100 |
Tender Value | |
Place | INDORE |
Link |
AAAAAAAAAA Login to view |
Start Date | March 31, 2025 14:30 |
End Date |
28/04/2025 ( 8 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Read moreIe services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreOperation and maintenance of two laning with paved shoulders of lambia raipur section of nh 458 from km 163.800 to km 218.563 (total length 54.763 km) under nhdp phase iv in the state of rajasthan
Operation and maintenance of two laning with paved shoulders of lambia raipur section of nh 458 from km 163.800 to km 218.563 (total length 54.763 km) under nhdp phase iv in the state of rajasthan
Read morePreparation of dpr including land acquisition and forest clearance for construction of road tungri samchung tsela mago from new to nhsl specifications (indicative length 60 kms) under project vartak in state of arunachal pradesh
Preparation of dpr including land acquisition and forest clearance for construction of road tungri samchung tsela mago from new to nhsl specifications (indicative length 60 kms) under project vartak in state of arunachal pradesh
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreIndependent engineer services during operation and maintenance of six-laning of nh-71 from renigunta (km. 0.000) to naidupeta (km.57.046) (length-57.046 km.) on hybrid annuity mode in the state of andhra pradesh under bharatmala pariyojana.
Independent engineer services during operation and maintenance of six-laning of nh-71 from renigunta (km. 0.000) to naidupeta (km.57.046) (length-57.046 km.) on hybrid annuity mode in the state of andhra pradesh under bharatmala pariyojana.
Read morePurchase and fixing of paver blocks ward no. 04 from house of siddhu shukla to birsa munda tiraha shahdol as per nit and estimate.
Purchase and fixing of paver blocks ward no. 04 from house of siddhu shukla to birsa munda tiraha shahdol as per nit and estimate.
Read moreConstruction of drain from panchmukhi hanuman mandir to ramesh kahar, sunil thakur to arvind kevat and construction of drain and road from sourabh thakur to kevat golandaj in vivekanand ward, nagar palika parishad, gadarwara
Construction of drain from panchmukhi hanuman mandir to ramesh kahar, sunil thakur to arvind kevat and construction of drain and road from sourabh thakur to kevat golandaj in vivekanand ward, nagar palika parishad, gadarwara
Read moreConst. of drain from jatav to mukesh khair, shankar mandir to narmada vanshkar, lallu house to maharaj, bhagwati rajput to rakesh rajput and const. of both side drain from setu vanshkar to raja khan in jagdish ward, nagar palika parishad gadarwara
Const. of drain from jatav to mukesh khair, shankar mandir to narmada vanshkar, lallu house to maharaj, bhagwati rajput to rakesh rajput and const. of both side drain from setu vanshkar to raja khan in jagdish ward, nagar palika parishad gadarwara
Read moreof your Industry type