Tender Details

Particulars Details
Title
Independent Engineer Services During Operation And Maintenance Of Six Laning Of Nh 71 From Renigunta (Km. 0.000) To Naidupeta (Km.57.046) (Length 57.046 Km.) On Hybrid Annuity Mode In The State Of Andhra Pradesh Under Bharatmala Pariyojana.
Description
Independent Engineer Services During Operation And Maintenance Of Six Laning Of Nh 71 From Renigunta (Km. 0.000) To Naidupeta (Km.57.046) (Length 57.046 Km.) On Hybrid Annuity Mode In The State Of Andhra Pradesh Under Bharatmala Pariyojana.
Organisation National Highways Authority of India | Public Sector Undertakings
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 5000
EMD 0
Tender Value
Place Tirupati
Link

AAAAAAAAAA

Login to view
Start Date April 04, 2025 22:00
End Date

20/05/2025 ( 30 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Read more
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)

Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)

Read more
Four laning from budhel junction to vartej y junction (km 0.900 to km 9.400) at bhavnagar bypass in the state of gujarat on epc mode under bharatmala pariyojana

Four laning from budhel junction to vartej y junction (km 0.900 to km 9.400) at bhavnagar bypass in the state of gujarat on epc mode under bharatmala pariyojana

Read more
Services of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.

Services of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.

Read more
Rehabilitation and upgradation of ramachandrapuram village limits from km.37.950 to km.38.950 of ibrahimpatnam to ap/telangana border section of nh-30 in the state of andhra pradesh on epc mode.

Rehabilitation and upgradation of ramachandrapuram village limits from km.37.950 to km.38.950 of ibrahimpatnam to ap/telangana border section of nh-30 in the state of andhra pradesh on epc mode.

Read more
Const. of ec for gammon junc at km. 903.265 (blackspot id no. ap(05)-092)and diwancheruvu junc at km. 902.308(blackspot id no.ap(03)-299) on nh16 in andhra pradesh under nh(o) on epc mode

Const. of ec for gammon junc at km. 903.265 (blackspot id no. ap(05)-092)and diwancheruvu junc at km. 902.308(blackspot id no.ap(03)-299) on nh16 in andhra pradesh under nh(o) on epc mode

Read more
Consultancy services of ae for construction of 6-lane patna ring road highway nh-131g from kanhauli to sherpur from km.0.000-km8.480 including junction development with bihta-danapur elevated corridor app.length-1.5 km on epc mode in bihar l-9.98km

Consultancy services of ae for construction of 6-lane patna ring road highway nh-131g from kanhauli to sherpur from km.0.000-km8.480 including junction development with bihta-danapur elevated corridor app.length-1.5 km on epc mode in bihar l-9.98km

Read more
Operation and maintenance of two laning with paved shoulders of lambia raipur section of nh 458 from km 163.800 to km 218.563 (total length 54.763 km) under nhdp phase iv in the state of rajasthan

Operation and maintenance of two laning with paved shoulders of lambia raipur section of nh 458 from km 163.800 to km 218.563 (total length 54.763 km) under nhdp phase iv in the state of rajasthan

Read more
Consultancy services of independent engineer for upgradation to two lane with paved shoulder configuration from km. 0/000 to 62/822 (limbdi-dhrangadhra section) of nh-51 in the state of gujarat (total length- 62.822km) on ham mode

Consultancy services of independent engineer for upgradation to two lane with paved shoulder configuration from km. 0/000 to 62/822 (limbdi-dhrangadhra section) of nh-51 in the state of gujarat (total length- 62.822km) on ham mode

Read more
Construction of 2-lane with paved shoulder of ashapur to rudhy (betul-khandwa pkg-iv) from design ch. km 114.000 to km 149.000 section in state of mp on epc mode under nh(o) (project length-35 km)

Construction of 2-lane with paved shoulder of ashapur to rudhy (betul-khandwa pkg-iv) from design ch. km 114.000 to km 149.000 section in state of mp on epc mode under nh(o) (project length-35 km)

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise