Tender Details
Particulars | Details |
---|---|
Title |
Mtps I Bm Unit I Removal Of Deteriorated And Peeled Off Insulation And Re Insulation With New Insulation Materials On The Portion In Id Fan 1 A And 1 B Casing Portion And Other Related Works
|
Description |
Mtps I Bm Unit I Removal Of Deteriorated And Peeled Off Insulation And Re Insulation With New Insulation Materials On The Portion In Id Fan 1 A And 1 B Casing Portion And Other Related Works
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2024_EB_483409_1 |
Reference Number |
CE / MTPS-I / SE / M-I / BM /OT.159/ 2024-25 |
Tender Fee | 0 |
EMD | 16600 |
Tender Value | |
Place | Mettur Thermal Power Station-I / Mettur Dam |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=574388 |
Start Date | September 12, 2024 23:30 |
End Date |
26/09/2024 ( Expired 208 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Piping,painting, insulation,ndt, chemical cleaning, electrical,instrumentation, misc.civil and structural works, etc.including supply of materials (pkg-ii)on sub-contract basis in connection with composite works for pdh unit for gail usar pdh-project
Piping,painting, insulation,ndt, chemical cleaning, electrical,instrumentation, misc.civil and structural works, etc.including supply of materials (pkg-ii)on sub-contract basis in connection with composite works for pdh unit for gail usar pdh-project
Read moreMtps i tm i removal and re insulation of hp ip control valves gland steam pipes esviv and hptipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2025 26 as and when required
Mtps i tm i removal and re insulation of hp ip control valves gland steam pipes esviv and hptipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2025 26 as and when required
Read moreTtps mech ii tm i unit i ii iii removal and re fixing of wool mattress or cera blanket insulation of turbine casing and their allied pipe lines valves and hp heaters for the period from 01 04 25 to 31 03 26
Ttps mech ii tm i unit i ii iii removal and re fixing of wool mattress or cera blanket insulation of turbine casing and their allied pipe lines valves and hp heaters for the period from 01 04 25 to 31 03 26
Read moreTtps mech ii bm unit i ii iii attending breakdown maintenance works in id fd pa fan motor lube oil system forced lube oil system bearing cooling water system and control oil system in unit i ii iii for the period from 01 04 2025 to 31 03 2026
Ttps mech ii bm unit i ii iii attending breakdown maintenance works in id fd pa fan motor lube oil system forced lube oil system bearing cooling water system and control oil system in unit i ii iii for the period from 01 04 2025 to 31 03 2026
Read moreMtps i mill plant unit i removal of worn out thinned out wall plates of coal bunkers 1a 1b 1c and erection of new wall plates of 12 mm thick ms plates and supporting beams and other related works
Mtps i mill plant unit i removal of worn out thinned out wall plates of coal bunkers 1a 1b 1c and erection of new wall plates of 12 mm thick ms plates and supporting beams and other related works
Read moreMtps i civil circle up keeping of drains by removal of ash deposits, silt and other waste materials from the drain adjacent to the power house building on the southern side and along the 58s road leading from unit iv to canteen and from inside
Mtps i civil circle up keeping of drains by removal of ash deposits, silt and other waste materials from the drain adjacent to the power house building on the southern side and along the 58s road leading from unit iv to canteen and from inside
Read moreMtps i mill plant unit iv removal of worn out thinned out wall plates of bunkers 4b 4d 4f and erection of new wall plates of 12 mm thick ms plates and supporting beams and other related works
Mtps i mill plant unit iv removal of worn out thinned out wall plates of bunkers 4b 4d 4f and erection of new wall plates of 12 mm thick ms plates and supporting beams and other related works
Read moreSwitch plate assembly complete with polycarbonate cover frame and powder coated steel plate consists of (i) on-off switch - 4 nos. (ii) 3 pin socket (6 a, 250 v, ac) - 1 no. (iii) glass fuse 1a of m/s. ferraz shawmut / cooper busman / equivalent (with fuse holder) - 1 no. as per icf specification no. icf/edml - 012,
For complete deion and other details, please refer to tender
Read moreMtps i mi mill plant unit ii removal of worn out thinned out wall plates of bunkers 2b 2c 2f and erection of new wall plates of 12 mm thick ms plates and supporting beams and other related works
Mtps i mi mill plant unit ii removal of worn out thinned out wall plates of bunkers 2b 2c 2f and erection of new wall plates of 12 mm thick ms plates and supporting beams and other related works
Read moreMtps i bm unit ii coh 2024 25 id fan 2a reconditioning of the eroded discharge spiral portion in the id fan top casing renewal of casing wear liner and other related works
Mtps i bm unit ii coh 2024 25 id fan 2a reconditioning of the eroded discharge spiral portion in the id fan top casing renewal of casing wear liner and other related works
Read moreof your Industry type