Tender Details

Particulars Details
Title
Mtps I Bm Unit I Removal Of Deteriorated And Peeled Off Insulation And Re Insulation With New Insulation Materials On The Portion In Id Fan 1 B Outlet Fg Duct Horizontal Vertical Portion And Id Fans Outlet To Chimney Common Fg Duct Area Etc
Description
Mtps I Bm Unit I Removal Of Deteriorated And Peeled Off Insulation And Re Insulation With New Insulation Materials On The Portion In Id Fan 1 B Outlet Fg Duct Horizontal Vertical Portion And Id Fans Outlet To Chimney Common Fg Duct Area Etc
Organisation TNEB Limited | State Govt. and UT
Tender Id 2024_EB_484566_1
Reference
Number
CE / MTPS-I / SE / M-I / BM /OT.161 / 2024-25
Tender Fee 0
EMD 19300
Tender Value
Place Mettur Thermal Power Station-I / Mettur Dam
Link https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=575811
Start Date September 16, 2024 17:40
End Date

30/09/2024 ( Expired 226 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Mtps i bm unit i aoh 2025 26 strengthening of the eroded portions of esp hopper fg duct from esp outlet to chimney and other related works in both a and b sides

Mtps i bm unit i aoh 2025 26 strengthening of the eroded portions of esp hopper fg duct from esp outlet to chimney and other related works in both a and b sides

Read more
Mtps i bm unit i rotating parts annual maintenance 2025 26 removal and renewal of insulation in fg ducts air ducts and air pre heaters

Mtps i bm unit i rotating parts annual maintenance 2025 26 removal and renewal of insulation in fg ducts air ducts and air pre heaters

Read more
Mtps tm unit i removal of insulation and providing re insulation to pipe lines valves deaerator main flange gland steam cooler low pressure heater flash tanks and its accessories and disposal of waste insulation materials during unit i annual overhau

Mtps tm unit i removal of insulation and providing re insulation to pipe lines valves deaerator main flange gland steam cooler low pressure heater flash tanks and its accessories and disposal of waste insulation materials during unit i annual overhau

Read more
Mtps i bm unit i aoh 2025 26 cutting and patch welding on the eroded portion of the fg duct from eco outlet to aph inlet renewal of support beam both inlet and allied works

Mtps i bm unit i aoh 2025 26 cutting and patch welding on the eroded portion of the fg duct from eco outlet to aph inlet renewal of support beam both inlet and allied works

Read more
Mtps i bm unit i boiler pressure parts aoh 2025 water washing of boiler ist and iind pass area removal of heavy particle of soot deposited on water wall tube platen sh coil and reheater coil etc

Mtps i bm unit i boiler pressure parts aoh 2025 water washing of boiler ist and iind pass area removal of heavy particle of soot deposited on water wall tube platen sh coil and reheater coil etc

Read more
Mtps i tm i removal and re insulation of hp ip control valves gland steam pipes esviv and hptipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2025 26 as and when required

Mtps i tm i removal and re insulation of hp ip control valves gland steam pipes esviv and hptipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2025 26 as and when required

Read more
Ttps mech ii bm unit iv v clearing of ash powder fire hazardous materials around id fans and attending breakdown works in fg duct of unit iv v for the period from 01 04 2025 to 31 03 2026

Ttps mech ii bm unit iv v clearing of ash powder fire hazardous materials around id fans and attending breakdown works in fg duct of unit iv v for the period from 01 04 2025 to 31 03 2026

Read more
Ttps mech ii bm unit iv v attending breakdown works in id fans aphs structural supports and platforms and clearing of coal powder from airpreheater outlet to esp inlet of flue gas duct path a b c d of unit iv v for the period from 01 04 2025 to 31 03

Ttps mech ii bm unit iv v attending breakdown works in id fans aphs structural supports and platforms and clearing of coal powder from airpreheater outlet to esp inlet of flue gas duct path a b c d of unit iv v for the period from 01 04 2025 to 31 03

Read more
Mtps i bm unit ii coh 2024 25 id fan 2a reconditioning of the eroded discharge spiral portion in the id fan top casing renewal of casing wear liner and other related works

Mtps i bm unit ii coh 2024 25 id fan 2a reconditioning of the eroded discharge spiral portion in the id fan top casing renewal of casing wear liner and other related works

Read more
Mtps i mill plant unit ii complete dismantling and reassembling of bowl assembly worm gear housing worm wheel mill bottom insulation cover plates renewal of vertical shaft upper radial bearing etc in coal mill 2b tilting work

Mtps i mill plant unit ii complete dismantling and reassembling of bowl assembly worm gear housing worm wheel mill bottom insulation cover plates renewal of vertical shaft upper radial bearing etc in coal mill 2b tilting work

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise