Mtps I Bm Unit Ii Removal Of Deteriorated And Peeled Off Insulation And Re Insulation With New Insulation Materials On The Portion In Esp Outlet Common Fg Duct Area Id Fan 2 B Outlet Fg Duct Horizontal Vertical Portion And Id Fans Casing Area Etc
|
Description |
Mtps I Bm Unit Ii Removal Of Deteriorated And Peeled Off Insulation And Re Insulation With New Insulation Materials On The Portion In Esp Outlet Common Fg Duct Area Id Fan 2 B Outlet Fg Duct Horizontal Vertical Portion And Id Fans Casing Area Etc
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2024_EB_484560_1 |
Reference Number |
CE / MTPS-I / SE / M-I / BM /OT.160 / 2024-25 |
Tender Fee | 0 |
EMD | 34500 |
Tender Value | |
Place | Mettur Thermal Power Station-I / Mettur Dam |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=575806 |
Start Date | September 16, 2024 17:30 |
End Date |
30/09/2024 ( Expired 204 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ttps mech ii bm unit iv v clearing of ash powder fire hazardous materials around id fans and attending breakdown works in fg duct of unit iv v for the period from 01 04 2025 to 31 03 2026
Ttps mech ii bm unit iv v clearing of ash powder fire hazardous materials around id fans and attending breakdown works in fg duct of unit iv v for the period from 01 04 2025 to 31 03 2026
Read moreTtps mech ii bm unit iv v attending breakdown works in id fans aphs structural supports and platforms and clearing of coal powder from airpreheater outlet to esp inlet of flue gas duct path a b c d of unit iv v for the period from 01 04 2025 to 31 03
Ttps mech ii bm unit iv v attending breakdown works in id fans aphs structural supports and platforms and clearing of coal powder from airpreheater outlet to esp inlet of flue gas duct path a b c d of unit iv v for the period from 01 04 2025 to 31 03
Read moreMtps i bm unit ii coh 2024 25 id fan 2a reconditioning of the eroded discharge spiral portion in the id fan top casing renewal of casing wear liner and other related works
Mtps i bm unit ii coh 2024 25 id fan 2a reconditioning of the eroded discharge spiral portion in the id fan top casing renewal of casing wear liner and other related works
Read moreMtps i bm unit ii coh 2024 25 fg duct a side dismantling fabrication supply and erection of portion of flue gas ducts from aph outlet to 45 degree slope end
Mtps i bm unit ii coh 2024 25 fg duct a side dismantling fabrication supply and erection of portion of flue gas ducts from aph outlet to 45 degree slope end
Read moreMtps i bm unit ii coh 2024 25 fg duct b side dismantling fabrication supply and erection of portion of flue gas ducts from aph outlet to 45 degree slope end
Mtps i bm unit ii coh 2024 25 fg duct b side dismantling fabrication supply and erection of portion of flue gas ducts from aph outlet to 45 degree slope end
Read moreMtps i bm unit ii coh 2024 25 strengthening of the eroded portions of esp hopper id fan casing fg duct from esp inlet to chimney and renewal of deflector plate in the id fan outlet side fg duct and other related works in both a and b sides
Mtps i bm unit ii coh 2024 25 strengthening of the eroded portions of esp hopper id fan casing fg duct from esp inlet to chimney and renewal of deflector plate in the id fan outlet side fg duct and other related works in both a and b sides
Read moreMtps i bm unit ii boiler pressure parts coh 2024 removal and refixing of skin casing sheet and insulation for attending boiler 1st pass water wall tubes and 2nd pass steam cooled wall tube rectification works etc
Mtps i bm unit ii boiler pressure parts coh 2024 removal and refixing of skin casing sheet and insulation for attending boiler 1st pass water wall tubes and 2nd pass steam cooled wall tube rectification works etc
Read moreMtps i bm unit ii removal of deteriorated and peeled off insulation and re insulation with new insulation materials on the portion in esp outlet common fg duct area id fan 2b outlet fg duct horizontal vertical portion and id fans casing area etc
Mtps i bm unit ii removal of deteriorated and peeled off insulation and re insulation with new insulation materials on the portion in esp outlet common fg duct area id fan 2b outlet fg duct horizontal vertical portion and id fans casing area etc
Read moreMtps i bm unit i removal of deteriorated and peeled off insulation and re insulation with new insulation materials on the portion in id fan 1b outlet fg duct horizontal vertical portion and id fans outlet to chimney common fg duct area etc
Mtps i bm unit i removal of deteriorated and peeled off insulation and re insulation with new insulation materials on the portion in id fan 1b outlet fg duct horizontal vertical portion and id fans outlet to chimney common fg duct area etc
Read moreMtps i bm unit i removal of deteriorated and peeled off insulation and re insulation with new insulation materials on the portion in id fan 1a and 1b casing portion and other related works
Mtps i bm unit i removal of deteriorated and peeled off insulation and re insulation with new insulation materials on the portion in id fan 1a and 1b casing portion and other related works