Tender Details
Particulars | Details |
---|---|
Title |
Mtps I Tm Ii Unit I Complete Overhauling And Painting Of Service Air Compressors 1 A 1 B 1 C
|
Description |
Mtps I Tm Ii Unit I Complete Overhauling And Painting Of Service Air Compressors 1 A 1 B 1 C
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2025_EB_530611_1 |
Reference Number |
CE / MTPS-I / SE / M-I / TM /OT. 319 / 2024-25 |
Tender Fee | 0 |
EMD | 4500 |
Tender Value | |
Place | Mettur Thermal Power Station-I / Mettur Dam |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=631683 |
Start Date | March 07, 2025 00:25 |
End Date |
20/03/2025 ( Expired 54 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Perpetual empanelment of contractors for execution of various types and nature of engineering works under tamil nadu state office under category-i (0-100 lacs) category- ii (100-200 lacs)- empanelment for ii nd year
Perpetual empanelment of contractors for execution of various types and nature of engineering works under tamil nadu state office under category-i (0-100 lacs) and category- ii (100-200 lacs)- empanelment for ii nd year
Read morePublic tender for perpetual empanelment of contractors for execution of various types and nature of engineering works under maharashtra state office under category-i 0-100 lakhs and category- ii 100-200 lakhs
Public tender for perpetual empanelment of contractors for execution of various types and nature of engineering works under maharashtra state office under category-i 0-100 lakhs and category- ii 100-200 lakhs
Read moreChartering of green tug (green tug transition programme compliant) - manning, operation, maintenance and complete technical management of service provider owned01 no. 60t bollard pull new battery electric tug for 15 years at paradip port authority
Chartering of green tug (green tug transition programme compliant) - manning, operation, maintenance and complete technical management of service provider owned01 no. 60t bollard pull new battery electric tug for 15 years at paradip port authority
Read moreOverhauling of hp, lp valves, nrvs, actuators, l.p.and h.p. heaters, ejectors, drain coolers and toc and 4-way,2-way valves of unit no.-3 of 3x210 mw, atps, anpara
Overhauling of hp, lp valves, nrvs, actuators, l.p.and h.p. heaters, ejectors, drain coolers and toc and 4-way,2-way valves of unit no.-3 of 3x210 mw, atps, anpara
Read moreApplication and supply of ceramic fiber pad insulation and thermal insulation on pipe lines, valves, re-generative equipments etc. during annual overhauling of unit no.-3 of 3x210mw, atps, anpara
Application and supply of ceramic fiber pad insulation and thermal insulation on pipe lines, valves, re-generative equipments etc. during annual overhauling of unit no.-3 of 3x210mw, atps, anpara
Read moreDesign manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Design manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Read moreModification of existing single sealing _12 sectors _ rotary air pre heater to double sealing arrangement _ 24 sectors _ in unit iv aph a and b during forthcoming capital overhaul model 27vit _m_ 72 deg 2000mm
Modification of existing single sealing _12 sectors _ rotary air pre heater to double sealing arrangement _ 24 sectors _ in unit iv aph a and b during forthcoming capital overhaul model 27vit _m_ 72 deg 2000mm
Read moreManufacture and supply of erw steel tubes for air preheaters of 210 mw capacity boilers of sgtps, ph-i and ph-ii, birsinghpur.
Manufacture and supply of erw steel tubes for air preheaters of 210 mw capacity boilers of sgtps, ph-i and ph-ii, birsinghpur.
Read morePackage-i civil and hydro-mechanical works of di tunnels pertaining to tato-ii hydro electric project (700 mw), arunachal pradesh
Package-i civil and hydro-mechanical works of di tunnels pertaining to tato-ii hydro electric project (700 mw), arunachal pradesh
Read moreLot i package civil works package for 240 mw uri i stage ii h.e project, located near boniyar, uri villages in the baramulla district of ut of jammu and kashmir
Lot i civil works comprising of hrt including adits, surge shaft including adits, pressure shaft including adits, underground p/h cavern, bus ducts, underground transformer cavern, underground dt gate operation cavern and others as per scope of work.
Read moreof your Industry type