Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Ktps Vi Stage Bm Removal And Re Fixing Of Insulation Including Cladding On Boiler And Its Auxiliaries In Unit11 Of Ktps Vi Stage As And When Required For The Period From 01 04 2026 Or From The Date Of Commencement To 31 03 2027
|
| Description |
Ktps Vi Stage Bm Removal And Re Fixing Of Insulation Including Cladding On Boiler And Its Auxiliaries In Unit11 Of Ktps Vi Stage As And When Required For The Period From 01 04 2026 Or From The Date Of Commencement To 31 03 2027
|
| Organisation | Information Technology Electronics and Communication Department Telangana | State Govt. and UT |
| Tender Id | 689955 |
|
Reference Number |
e-22/2026-27 of SE/OM/BM/KTPS-VI |
| Tender Fee | 72 |
| EMD | 3014 |
| Tender Value | - |
| Place | TS |
| Link |
View Original Tender Notice
http://eprocurement.telangana.gov.in/ |
| Start Date | April 02, 2026 01:30 |
| End Date |
Expired
22/04/2026
Expired 175 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Air cell for 80mva station transformer in ktps-vi stage
Air cell for 80mva station transformer in ktps-vi stage
Read moreSupply of spares for soot blowing system of air preheaters of ktps-vi stage boiler
Supply of spares for soot blowing system of air preheaters of ktps-vi stage boiler
Read moreSpares suitable for tulaman make lorry weigh bridge of silos in ash handling system, ktps-vi stage
Spares suitable for tulaman make lorry weigh bridge of silos in ash handling system, ktps-vi stage
Read moreDifferent sizes of rubber expansion joints (bellows) in water system of cam division of ktps-vi stage
Different sizes of rubber expansion joints (bellows) in water system of cam division of ktps-vi stage
Read morePp frp (poly propylene fibreglass reinforced plastic) tank at effluent treatment plant of cam division, ktps-vi stage
Pp frp (poly propylene fibreglass reinforced plastic) tank at effluent treatment plant of cam division, ktps-vi stage
Read moreSolid state drives (ssd) for workstations of max dna and bop plc hmi systems of ktps-vi stage
Solid state drives (ssd) for workstations of max dna and bop plc hmi systems of ktps-vi stage
Read moreBelzona compounds or its equivalent for cw and acw pumps in water system of cam division, ktps-vi stage
Belzona compounds or its equivalent for cw and acw pumps in water system of cam division, ktps-vi stage
Read moreTggenco-ktps-vii stage-bm-enquiry for supply of helical gear boxes for eerm (emitting electrode rapping mechanism) of esps
Tggenco-ktps-vii stage-bm-enquiry for supply of helical gear boxes for eerm (emitting electrode rapping mechanism) of esps
Read moreKtps-v stage- bm- provide skilled labor, specifically ibr welders and grinders, to replace the boiler tubes in unit-x of the ktps-v stage during the annual overhaul period for the year 2026-27-reg
Ktps-v stage- bm- provide skilled labor, specifically ibr welders and grinders, to replace the boiler tubes in unit-x of the ktps-v stage during the annual overhaul period for the year 2026-27-reg
Read moreSpares suitable for aira/marck make actuator operated 50nb ball valves for air lock vessels in ash handling system, ktps-vi stage
Spares suitable for aira/marck make actuator operated 50nb ball valves for air lock vessels in ash handling system, ktps-vi stage
Read moreof your Industry type