Tender Details

Particulars Details
Title
Ktps V Stage Bm Provide Skilled Labor, Specifically Ibr Welders And Grinders, To Replace The Boiler Tubes In Unit X Of The Ktps V Stage During The Annual Overhaul Period For The Year 2026 27 Reg
Description
Ktps V Stage Bm Provide Skilled Labor, Specifically Ibr Welders And Grinders, To Replace The Boiler Tubes In Unit X Of The Ktps V Stage During The Annual Overhaul Period For The Year 2026 27 Reg
Organisation TELANGANA POWER GENERATION CORPORATION LIMITED-CE KTPS V & VI STAGE
Tender Id Login to view
Reference
Number
Login to view
Tender Fee -
EMD -
Tender Value 3.68 Lakh
Place Telangana
Link Login to view
Start Date June 30, 2026 01:44
End Date
Open 22/10/2026

5 days left

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Supply of stuffing box for ball tube mills 4772 for unit-9 and 10 of ktps-v stage

Supply of stuffing box for ball tube mills 4772 for unit-9 and 10 of ktps-v stage

Read more
Manufacture and supply of 600mt of hi-chrome grinding media balls of sizes 50mm and 40mm for ktps-v stage

Manufacture and supply of 600mt of hi-chrome grinding media balls of sizes 50mm and 40mm for ktps-v stage

Read more
Ktps- v vi stages- o m-ii- providing brick supporting pedestals for extending 4 nos of ash disposal pipelines of ktps-v stage and 3 nos of ash disposal pipelines of ktps-vi stage at required locations all along the ab pond deep into the pond for uniform deposition of ash in the ab pond during the fy 2026-27

Ktps- v vi stages- o m-ii- providing brick supporting pedestals for extending 4 nos of ash disposal pipelines of ktps-v stage and 3 nos of ash disposal pipelines of ktps-vi stage at required locations all along the ab pond deep into the pond for uniform deposition of ash in the ab pond during the fy 2026-27

Read more
Tggenco-ktps-vii stage-chp/mcp and fo- repair and major overhaul of beml make bs6d170-1 model diesel engine (esn 9511301447) of bd-355 dozer along with required spares -quotation called for-regarding

Tggenco-ktps-vii stage-chp/mcp and fo- repair and major overhaul of beml make bs6d170-1 model diesel engine (esn 9511301447) of bd-355 dozer along with required spares -quotation called for-regarding

Read more
Revamping the existing air conditioning system of capacity 4x100tr with latest/advance system including design, supply, erection, testing and commissioning as well as dismantling its existing system in ktps v stage (2x250mw).

Revamping the existing air conditioning system of capacity 4x100tr with latest/advance system including design, supply, erection, testing and commissioning as well as dismantling its existing system in ktps v stage (2x250mw).

Read more
Ktps-v stage - i and c - laying of cables from ucb to seal air pressure transmitters and erection of impulse lines and structures for seal air pressure transmitters of mills of units 9 and 10.-reg

Ktps-v stage - i and c - laying of cables from ucb to seal air pressure transmitters and erection of impulse lines and structures for seal air pressure transmitters of mills of units 9 and 10.-reg

Read more
Providing skilled labor, specifically ibr welders and grinders, to replace the boiler tubes in unit-ix of the ktps-v stage during the annual overhaul period.

Providing skilled labor, specifically ibr welders and grinders, to replace the boiler tubes in unit-ix of the ktps-v stage during the annual overhaul period.

Read more
Ktps-v stage

Procurement of 30mt caustic soda in the form of solid flakes as per is:252-2013(reaffirmed 2018) required for ktps_v stage of tsgenco

Read more
Ktps-v stage

Manufacture and supply of 600mt of hi-chrome grinding media balls of sizes 50mm and 40mm for ktps-v stage.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise