Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Ktps V Stage Emmrt Testing Of 220kv Switchyard Equipment Of Ktps V Stage Reg
|
| Description |
Ktps V Stage Em And Mrt Testing Of 220kv Switchyard Equipment Of Ktps V Stage Reg
|
| Organisation | Information Technology Electronics and Communication Department Telangana | State Govt. and UT |
| Tender Id | 653459 |
|
Reference Number |
e-72/ 2025-26 EMMRT/SE/OM/KTPS-V |
| Tender Fee | 386 |
| EMD | 16350 |
| Tender Value | - |
| Place | TS |
| Link |
View Original Tender Notice
http://eprocurement.telangana.gov.in/ |
| Start Date | December 18, 2025 01:00 |
| End Date |
Expired
06/01/2026
Expired 281 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supply of 245kv, 3-phase, spring operated sf6 circuit breaker along with retrofitting material for 220kv switchyard of ktps-v stage under psd funds
Supply of 245kv, 3-phase, spring operated sf6 circuit breaker along with retrofitting material for 220kv switchyard of ktps-v stage under psd funds
Read moreTggenco-ktps vii stage/paloncha - supply of clamps and connectors for 400kv switchyard
Tggenco-ktps vii stage/paloncha - supply of clamps and connectors for 400kv switchyard
Read moreKtps-v stage- bm- provide skilled labor, specifically ibr welders and grinders, to replace the boiler tubes in unit-x of the ktps-v stage during the annual overhaul period for the year 2026-27-reg
Ktps-v stage- bm- provide skilled labor, specifically ibr welders and grinders, to replace the boiler tubes in unit-x of the ktps-v stage during the annual overhaul period for the year 2026-27-reg
Read moreRefrigerant r-22 gas for a.c system for ktps-v stage
Refrigerant r-22 gas for a.c system for ktps-v stage
Read moreSpares for silo vent fan in dry ash handling plant ktps- v stage
Spares for silo vent fan in dry ash handling plant ktps- v stage
Read moreCeramic fluidizing pads for dry fly ash handling plant of ktps-v stage
Ceramic fluidizing pads for dry fly ash handling plant of ktps-v stage
Read moreTn-26 earthing system adequacy study for 220 kv switchyard and other major electrical equipment at ktps, kota.
Earthing system adequacy study for 220 kv switchyard and other major electrical equipment at ktps, kota.
Read moreProcurement of material for 220kv switchyard emd-i, ctps htps kasimpur
Procurement of material for 220kv switchyard emd-i, ctps htps kasimpur
Read moreSupply, erection, testing and commissioning of 33kv isolators at 33kv switchyard of 50mva transformers and 33kv vcb at 220kv s/s, pantnagar under 220kv oandm division, ptcul, pantnagar
Supply, erection, testing and commissioning of 33kv isolators at 33kv switchyard of 50mva transformers and 33kv vcb at 220kv s/s, pantnagar under 220kv oandm division, ptcul, pantnagar
Read moreSupply of stuffing box for ball tube mills 4772 for unit-9 and 10 of ktps-v stage
Supply of stuffing box for ball tube mills 4772 for unit-9 and 10 of ktps-v stage
Read moreof your Industry type