Tender Details

Particulars Details
Title
Providing Skilled Labor, Specifically Ibr Welders And Grinders, To Replace The Boiler Tubes In Unit Ix Of The Ktps V Stage During The Annual Overhaul Period.
Description
Providing Skilled Labor, Specifically Ibr Welders And Grinders, To Replace The Boiler Tubes In Unit Ix Of The Ktps V Stage During The Annual Overhaul Period.
Organisation Information Technology Electronics and Communication Department Telangana | State Govt. and UT
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 131
EMD 5513
Tender Value
Place TS
Link

AAAAAAAAAA

Login to view
Start Date May 07, 2025 01:30
End Date

21/05/2025 ( 10 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Annual work contract for providing assistance in day to day routine or breakdown maintenance of electrical equipments and ht and lt motors of unit no. 1 and 2, 2x210 mw, at sgtps, mppgcl, birsinghpur .

Annual work contract for providing assistance in day to day routine or breakdown maintenance of electrical equipments and ht and lt motors of unit no. 1 and 2, 2x210 mw, at sgtps, mppgcl, birsinghpur .

Read more
Providing skilled labor, specifically ibr welders and grinders, to replace the boiler tubes in unit-ix of the ktps-v stage during the annual overhaul period.

Providing skilled labor, specifically ibr welders and grinders, to replace the boiler tubes in unit-ix of the ktps-v stage during the annual overhaul period.

Read more
Mtc. of e.i. in non residential building at chandigarh (providing repair and annual comprehensive maintenance of 2nos. 8 passenger lift of johnson make installed at transit flats sector 19, chandigarh (1401 to 1404 c and 1405 to 1408 c) during the y

Mtc. of e.i. in non residential building at chandigarh (providing repair and annual comprehensive maintenance of 2nos. 8 passenger lift of johnson make installed at transit flats sector 19, chandigarh (1401 to 1404 c and 1405 to 1408 c) during the y

Read more
Ktps-v-cam-laying of fire crete cement to the bottom ash hoppers, fabrication and replacement of refractory cooling water headers and laying of 200nb ci pipes of bottom ash handling system for unit-9 during the overhaul 2025-2026-reg.

Ktps-v-cam-laying of fire crete cement to the bottom ash hoppers, fabrication and replacement of refractory cooling water headers and laying of 200nb ci pipes of bottom ash handling system for unit-9 during the overhaul 2025-2026-reg.

Read more
Overhauling of louver damper assembly (pad-5ab,5cd 5ef,8a,8b,8c,8d,8e,8f) bypass dampers, pag-7ab,7cd 7ef, gd-5,6,7,8, and repair/erection of expansion joints along with protection plates in pa sa ducts of unit-ix in the annual overhaul of unit-ix

Overhauling of louver damper assembly (pad-5ab 5cd 5ef 8a 8b 8c 8d 8e 8f) bypass dampers pag-7ab 7cd 7ef gd-5 6 7 8 and repair/erection of expansion joints along with protection plates in pa and sa ducts of unit-ix in the annual overhaul of unit-ix

Read more
Dismantling and erection of metalic expansion joints ( 1.rcej 4/5000x3100x561, 2.rcej4/4100x3700x561, 3.rcej1-half size/3874x5574x81mm 4.rcej1/7000x4000x186) along with protection plate and welding of corner piece of expansion joint rcej2-3058x3358x272mm in unit-ix in the annual overhaul period.

Dismantling and erection of metalic expansion joints 1.rcej 4/5000x3100x561 2.rcej 4 4100x3700x561 3.rcej 1-half size 3874x5574x81mm and 4.rcej 1 7000x4000x186 along with protection plate and welding of corner piece of expansion joint rcej 2-3058x3358x272mm in unit-ix in the annual overhaul period.

Read more
Complete overhaul of airpreheaters (2 nos) in unit-ix of ktps v stage during the annual overhaul period

Complete overhaul of airpreheaters 2 nos in unit-ix of ktps v stage during the annual overhaul period

Read more
Service charges for conducting paut (non- destructive test) on welding joints in pressure parts of unit-9 boiler during unit-9 annual overhaul works.

Service charges for conducting paut (non- destructive test) on welding joints in pressure parts of unit-9 boiler during unit-9 annual overhaul works.

Read more
Emandmrt- annual maintenance contract of 1768kgs ncl (numeric control logic) controller unit-ix boiler lift at ktps-v stage for the period from 01-07-2025 to 31-03-2026.

Emandmrt- annual maintenance contract of 1768kgs ncl (numeric control logic) controller unit-ix boiler lift at ktps-v stage for the period from 01-07-2025 to 31-03-2026.

Read more
Procurement of ibr pipelines/bends/elbows to be used at t and a areas during coming overhauling of unit 1, sgtpp in the month of aug 2025.

Procurement of ibr pipelines/bends/elbows to be used at t and a areas during coming overhauling of unit 1, sgtpp in the month of aug 2025.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise