Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Pp Frp (Poly Propylene Fibreglass Reinforced Plastic) Tank At Effluent Treatment Plant Of Cam Division, Ktps Vi Stage
|
| Description |
Pp Frp (Poly Propylene Fibreglass Reinforced Plastic) Tank At Effluent Treatment Plant Of Cam Division, Ktps Vi Stage
|
| Organisation | TELANGANA POWER GENERATION CORPORATION LIMITED-CE KTPS V & VI STAGE |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | - |
| EMD | - |
| Tender Value | 0 |
| Place | Telangana |
| Link | Login to view |
| Start Date | August 19, 2026 00:30 |
| End Date |
Closing soon
14/10/2026
2 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Different sizes of rubber expansion joints (bellows) in water system of cam division of ktps-vi stage
Different sizes of rubber expansion joints (bellows) in water system of cam division of ktps-vi stage
Read moreSupply of bearings for ac plant compressor in cam/ktps-vi stage
Supply of bearings for ac plant compressor in cam/ktps-vi stage
Read moreConstruction of 1 no. storage shed for cam sub division 4 of ktps vi stage
Ktps v vi stages- civil- o m i- construction of 1no. storage shed of size 9.00m x 6.00m for sub division-4 of cam-ktps-vi stage near new ash handling pump house and other miscellaneous works in premises of ktps-vi stage
Read moreKtps vi stage cam erection and commissioning of 11tr packaged air conditioners of model dpa1321r3q and laying of duct for chemical lab building of ktps vi stage
Ktps vi stage cam erection and commissioning of 11tr packaged air conditioners of model dpa1321r3q and laying of duct for chemical lab building of ktps vi stage
Read moreAsramam dblp school in kollam group replacing the g.i sheeted roof to the existing building in to non asbestos high impact poly propylene reinforced cement corrugated sheet
Asramam dblp school in kollam group replacing the g.i sheeted roof to the existing building in to non asbestos high impact poly propylene reinforced cement corrugated sheet
Read moreThirumullavaram dblp school in kollam group- replacing the g.i sheeted roof to the existing building in to non asbestos high impact poly propylene reinforced cement corrugated sheet
Thirumullavaram dblp school in kollam group- replacing the g.i sheeted roof to the existing building in to non asbestos high impact poly propylene reinforced cement corrugated sheet
Read moreThirumullavaram dblp school in kollam group- replacing the g.i sheeted roof to the existing building in to non asbestos high impact poly propylene reinforced cement corrugated sheet-retender
Thirumullavaram dblp school in kollam group- replacing the g.i sheeted roof to the existing building in to non asbestos high impact poly propylene reinforced cement corrugated sheet-retender
Read moreOverhauling of m/s. greaves cotton make fire fighting engines of sel driven spray pump and sel driven booster pump in cam/ktps-vi stage.
Overhauling of m/s. greaves cotton make fire fighting engines of sel driven spray pump and sel driven booster pump in cam/ktps-vi stage.
Read moreWork of fibre reinforced polymer (frp) epoxy based painting/lining work along with plastering, repairing / reconstruction work in equalization tank (guard pond) in effluent treatment plant 2x600mw, stage-1, sstpp, mppgcl dongalia.
Work of fibre reinforced polymer (frp) epoxy based painting/lining work along with plastering, repairing / reconstruction work in equalization tank (guard pond) in effluent treatment plant 2x600mw, stage-1, sstpp, mppgcl dongalia.
Read moreof your Industry type