Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
25 Kv Ac Ohe Modification Work In Connection With Construction Of Rob I) Lc 69 A At Km 688/14 16 In Mlr Cd Section. Ii) Lc 79 At Km 725/22 24 In Tln Plo Section Iii) Nhai Rob Between Khapri Gumgaon Section Iv) Nhai Rob Between Bharatwada Godhani Section V) Mominpura Rob On Nagpur Hawara Section Section In Nagpur Division Of Central Railway.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 76801308 |
|
Reference Number |
NGP-ELECT-TRD2024-25-06R1 |
| Tender Fee | 0 |
| EMD | 1.72 Lakh |
| Tender Value | - |
| Place | Mumbai CST |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/092024/76801308/viewNitPdf_4678033.pdf |
| Start Date | August 13, 2024 00:26 |
| End Date |
Expired
12/09/2024
Expired 765 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Proposed construction of rob for elimination of manned lc at lc no. 554 at km 1098/33-35 between chcr (chacher)-sal(salwa) block section.
Proposed construction of rob for elimination of manned lc at lc no. 554 at km 1098/33-35 between chcr (chacher)-sal(salwa) block section.
Read moreS&t work inconnection with provision of 2-lane road over bridge (rob) in lieu of lc no: 116 at km: 933/08-10 between gurla-keshorai patan stations .[2026]
S&t work inconnection with provision of 2-lane road over bridge (rob) in lieu of lc no: 116 at km: 933/08-10 between gurla-keshorai patan stations .[2026]
Read moreConstruction of rob 2 lane with carriage width of 7.5mtr with railway portion span 1x60m bsg 1x18mtr cg at km 425 33.5 in lieu of lc no. 215 and including lhs 1x5.0mx3.6m between panposh kalunga station at kalunga yard excl. railway portion work
Construction of rob 2 lane with carriage width of 7.5mtr with railway portion span 1x60m bsg 1x18mtr cg at km 425 33.5 in lieu of lc no. 215 and including lhs 1x5.0mx3.6m between panposh kalunga station at kalunga yard excl. railway portion work
Read moreTender for construction of the proposed road over bridge rob at rly. km. 460-13 ,15 in lieu of lc. no. 202 in between kur kpxr stations on kur psa main line along with limited height subway lhs and other allied works.
Tender for construction of the proposed road over bridge rob at rly. km. 460-13 ,15 in lieu of lc. no. 202 in between kur kpxr stations on kur psa main line along with limited height subway lhs and other allied works.
Read moreConstruction of proposed rob at km 426/21-23 in lieu of lc no.184 at km. 426/21-23 in between bbsr new and mancheswar railway stations on howrah-chennai main line in the district of khordha under state plan for the year 2026-27
Construction of proposed rob at km 426/21-23 in lieu of lc no.184 at km. 426/21-23 in between bbsr new and mancheswar railway stations on howrah-chennai main line in the district of khordha under state plan for the year 2026-27
Read moreTrd related work in connection to the work of utility shifting for construction of rob at railway km 214.954 in liu of lc no. rv-172 at railway km 215/5-7 on nh-201(chainage 176km) near kesinga between kesinga-titlagarh station in titlagarh-theruvali section under sambalpur division .
Trd related work in connection to the work of utility shifting for construction of rob at railway km 214.954 in liu of lc no. rv-172 at railway km 215/5-7 on nh-201(chainage 176km) near kesinga between kesinga-titlagarh station in titlagarh-theruvali section under sambalpur division .
Read more1. salem division: rebuilding of 3 nos ( br.no.sge-40,sge-43 and sge-47) of rcc slab aqueduct / rob in ed-sge section.2. salem division - erode - karur section- proposed construction of road over bridge in lieu of existing lc no: 5 at km 5/400-500 1x36.0m effective span composite girder between erode and pasur stations along with pedestrian subway.
1. salem division: rebuilding of 3 nos ( br.no.sge-40,sge-43 and sge-47) of rcc slab aqueduct / rob in ed-sge section.2. salem division - erode - karur section- proposed construction of road over bridge in lieu of existing lc no: 5 at km 5/400-500 1x36.0m effective span composite girder between erode and pasur stations along with pedestrian subway.
Read moreConstruction of 2 lane rob in lieu of lc no.162 as 1x36.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards kolar) + 2x18.71m psc girder+1x10.5m rcc slab (towards bangarpet) (approach span) + re blocks and retaining wall (approach portion)at km 144/900-145/000 and construction of pedestrian subway between bwt-kqz stations of ynk-bwt section of sbc division. (composite work)
Construction of 2 lane rob in lieu of lc no.162 as 1x36.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards kolar) + 2x18.71m psc girder+1x10.5m rcc slab (towards bangarpet) (approach span) + re blocks and retaining wall (approach portion)at km 144/900-145/000 and construction of pedestrian subway between bwt-kqz stations of ynk-bwt section of sbc division. (composite work)
Read moreConstruction of 2 lane rob in lieu of lc no.1 as 1x30.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards amaravathy nagar) + 2x18.71m psc girder+1x10.5m rcc slab (towards desihalli)(approach span)+ re blocks and retaining wall (approach portion)) at km 1/800-900 along with lhs between bwt-col stations of bwt-mkm section of sbc division. (composite work)
Construction of 2 lane rob in lieu of lc no.1 as 1x30.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards amaravathy nagar) + 2x18.71m psc girder+1x10.5m rcc slab (towards desihalli)(approach span)+ re blocks and retaining wall (approach portion)) at km 1/800-900 along with lhs between bwt-col stations of bwt-mkm section of sbc division. (composite work)
Read moreTrd work against various engg works over firozpur division in c/w (i)- elimination of manned l-xing no. s-63 at km 433/27-28 by providing limited height subway of internal size 5m x 5m on juc-bes section (between juc-srx) by pushing method in the section under aden/juc (ii)- provision of 3.00m wide covered light weight rob near lc no. s-3 on ldh-dui section under aden/ldh, (iii)- construction of 5m x 3.5m lhs in lieu of closed level crossing no. c-7 on juc-nro section by pushing method under a
Trd work against various engg works over firozpur division in c/w (i)- elimination of manned l-xing no. s-63 at km 433/27-28 by providing limited height subway of internal size 5m x 5m on juc-bes section (between juc-srx) by pushing method in the section under aden/juc (ii)- provision of 3.00m wide covered light weight rob near lc no. s-3 on ldh-dui section under aden/ldh, (iii)- construction of 5m x 3.5m lhs in lieu of closed level crossing no. c-7 on juc-nro section by pushing method under a
Read moreof your Industry type