Tender Details

Particulars Details
Title
Construction Of 2 Lane Rob In Lieu Of Lc No.1 As 1 X30.00m Composite Girder (Railway Span) + 3x18.71m Psc Girder+1x10.5m Rcc Slab (Towards Amaravathy Nagar) + 2x18.71m Psc Girder+1x10.5m Rcc Slab (Towards Desihalli)(Approach Span)+ Re Blocks And Retaining Wall (Approach Portion)) At Km 1/800 900 Along With Lhs Between Bwt Col Stations Of Bwt Mkm Section Of Sbc Division. (Composite Work)
Description
Construction Of 2 Lane Rob In Lieu Of Lc No.1 As 1 X30.00m Composite Girder (Railway Span) + 3x18.71m Psc Girder+1x10.5m Rcc Slab (Towards Amaravathy Nagar) + 2x18.71m Psc Girder+1x10.5m Rcc Slab (Towards Desihalli)(Approach Span)+ Re Blocks And Retaining Wall (Approach Portion)) At Km 1/800 900 Along With Lhs Between Bwt Col Stations Of Bwt Mkm Section Of Sbc Division. (Composite Work)
Organisation Ministry of Railways
Tender Id Login to view
Reference
Number
Login to view
Tender Fee -
EMD -
Tender Value -
Place
Link Login to view
Start Date September 25, 2026 00:52
End Date
Closing soon 19/10/2026

3 days left

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Construction of 2 lane rob in lieu of lc no.162 as 1x36.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards kolar) + 2x18.71m psc girder+1x10.5m rcc slab (towards bangarpet) (approach span) + re blocks and retaining wall (approach portion)at km 144/900-145/000 and construction of pedestrian subway between bwt-kqz stations of ynk-bwt section of sbc division. (composite work)

Construction of 2 lane rob in lieu of lc no.162 as 1x36.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards kolar) + 2x18.71m psc girder+1x10.5m rcc slab (towards bangarpet) (approach span) + re blocks and retaining wall (approach portion)at km 144/900-145/000 and construction of pedestrian subway between bwt-kqz stations of ynk-bwt section of sbc division. (composite work)

Read more
Shoranur-mangaluru section: (1) proposed re-construction of br. no. 904 (proposed dn line) at km 636/100-300 as 5 x 18.0m effective span psc i girder & slab and 1 x 6.1m clear span psc slab between tanur & parappanangadi stations (2) proposed reconstruction of br. no. 1085 (proposed up line) at km 735/000-200 as 3 x 18m effective span psc i girder & slab between thalassery & etakkot stations including earthwork & blanketing for formation on approaches, collection of ballast

Shoranur-mangaluru section: (1) proposed re-construction of br. no. 904 (proposed dn line) at km 636/100-300 as 5 x 18.0m effective span psc i girder & slab and 1 x 6.1m clear span psc slab between tanur & parappanangadi stations (2) proposed reconstruction of br. no. 1085 (proposed up line) at km 735/000-200 as 3 x 18m effective span psc i girder & slab between thalassery & etakkot stations including earthwork & blanketing for formation on approaches, collection of ballast

Read more
Provision of s&t work in connection with rebuilding of existing overaged steel girder bridges of clear span 12.2m by psc slab of bridges in bina-dho section of jhansi division.

Provision of s&t work in connection with rebuilding of existing overaged steel girder bridges of clear span 12.2m by psc slab of bridges in bina-dho section of jhansi division.

Read more
Dnit for construction of 180.0 m (04 span 45.0 m each) steel composite girder bridge over satluj river at km 3/000 on link road chandpur bela in district roopnagar (work code sasn 2026-75)

Dnit for construction of 180.0 m (04 span 45.0 m each) steel composite girder bridge over satluj river at km 3/000 on link road chandpur bela in district roopnagar (work code sasn 2026-75)

Read more
Construction of road over bridge no: 114 (span: 1x18.0m cg+1x60.m camel back truss girder+1x18.0m composite girder) at project chainage 80028 in badampahar yard in connection with construction of new line in between kendujhargarh - badampahar section under the jurisdiction of dy. ce/con/tata of s. e. railway.

Construction of road over bridge no: 114 (span: 1x18.0m cg+1x60.m camel back truss girder+1x18.0m composite girder) at project chainage 80028 in badampahar yard in connection with construction of new line in between kendujhargarh - badampahar section under the jurisdiction of dy. ce/con/tata of s. e. railway.

Read more
1)sbc-mys section: proposed construction of road under bridge as rcc box of size 1x9.0x4.5m (clear ht) in lieu of lc no.10 at km: 10/900-11/000 between kengeri & ramanagara stations 2)bangarpet - marikuppam section: proposed construction of road over bridge (1x36m composite girder + 2x20.0m c/c psc girder+7x20.0m c/c psc girder + re blocks) with approaches and subway (1x6mx2.75m (clear ht) rcc box) in lieu of lc no.7 at railway km 11/600-700 near ooragum railway station 3)bypl-dmm section:

1)sbc-mys section: proposed construction of road under bridge as rcc box of size 1x9.0x4.5m (clear ht) in lieu of lc no.10 at km: 10/900-11/000 between kengeri & ramanagara stations 2)bangarpet - marikuppam section: proposed construction of road over bridge (1x36m composite girder + 2x20.0m c/c psc girder+7x20.0m c/c psc girder + re blocks) with approaches and subway (1x6mx2.75m (clear ht) rcc box) in lieu of lc no.7 at railway km 11/600-700 near ooragum railway station 3)bypl-dmm section:

Read more
Periodical painting of steel girder bridge of br. no.06- east line (rail viaduct composite girder spans 16x31.6m+23x29.776m+5x31.458m+1x31.708m) at km-08/32-10/24 between stations ppta - phlg and ten(10) spans (span no. 01 to 10) of bridge no. 07(2x64+36x119.6m) at km 10/42-15/24 between stations ppta - phlg of danapur division under dy.ce/brl/hjp.

Periodical painting of steel girder bridge of br. no.06- east line (rail viaduct composite girder spans 16x31.6m+23x29.776m+5x31.458m+1x31.708m) at km-08/32-10/24 between stations ppta - phlg and ten(10) spans (span no. 01 to 10) of bridge no. 07(2x64+36x119.6m) at km 10/42-15/24 between stations ppta - phlg of danapur division under dy.ce/brl/hjp.

Read more
1. salem division: rebuilding of 3 nos ( br.no.sge-40,sge-43 and sge-47) of rcc slab aqueduct / rob in ed-sge section.2. salem division - erode - karur section- proposed construction of road over bridge in lieu of existing lc no: 5 at km 5/400-500 1x36.0m effective span composite girder between erode and pasur stations along with pedestrian subway.

1. salem division: rebuilding of 3 nos ( br.no.sge-40,sge-43 and sge-47) of rcc slab aqueduct / rob in ed-sge section.2. salem division - erode - karur section- proposed construction of road over bridge in lieu of existing lc no: 5 at km 5/400-500 1x36.0m effective span composite girder between erode and pasur stations along with pedestrian subway.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise