Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Trd Related Work In Connection To The Work Of Utility Shifting For Construction Of Rob At Railway Km 214.954 In Liu Of Lc No. Rv 172 At Railway Km 215/5 7 On Nh 201(chainage 176km) Near Kesinga Between Kesinga Titlagarh Station In Titlagarh Theruvali Section Under Sambalpur Division .
|
| Description |
Trd Related Work In Connection To The Work Of Utility Shifting For Construction Of Rob At Railway Km 214.954 In Liu Of Lc No. Rv 172 At Railway Km 215/5 7 On Nh 201(chainage 176km) Near Kesinga Between Kesinga Titlagarh Station In Titlagarh Theruvali Section Under Sambalpur Division .
|
| Organisation | Ministry of Railways |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link | Login to view |
| Start Date | October 02, 2026 01:22 |
| End Date |
Open
23/10/2026
8 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repair to cess in saintala-titlagarh- theruvali section of sambalpur division.
For complete deion and other details, please refer to tender
Read moreMiscellaneous p.way works on rv line(165.800 - 201.680) - turekela road ex - titlagarh ex section under the jurisdiction of sse(p.way)/kbj of sambalpur division.
For complete deion and other details, please refer to tender
Read moreDewatering from ground tank of lhs at jt-125, jt-127 and rub near radhakrishna temple at titlagarh yard rv-159 and rv-181 under the jurisdiction of aden/titlagarh and for lhs at lj-3,5,7,16,18 and 20 in under the jurisdiction of aden/muniguda of sambalpur division for a period of 01 year.
For complete deion and other details, please refer to tender
Read moreTrd related work in connection with the work of proposed road over bridge of nh-6 at railway km 558/011.700 at sarla end beside existing rob in between sarla and sambalpur stations in sambalpur division .
For complete deion and other details, please refer to tender
Read moreSupply and stacking of 1,00,000 cum machine crushed track ballast as per railway s specification at badmal depot from outside railway land/quarry and loading into railway s wagons under the jurisdiction of aden/titlagarh of sambalpur division(period of completion: 18 months excluding monsoon period).
For complete deion and other details, please refer to tender
Read moreTrd related work in connection with(1)replacement of 10 nos. of steel girder bridges of span 12.20 mtr by psc slab in dfr-thv section of sambalpur division(2)construction of rub/lhs in liu of trespassing location near km-311/29-31 in bmck-thv block section, km-308/29-31 of bmck-thv block section, near km 18/12-13 in ljr-bwip section, near km-257/5-7 of amb-ljr block section, near km-320/35-37 of bmck-thv block section (3) construction of rub/lhs in liu of lc-rv-230 at km 293/0-1 in mngd-bmck
For complete deion and other details, please refer to tender
Read moreof your Industry type