Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Wbpwd/Ae/Bkpsd I/N Ie T 37/2023 24 2nd Call Of Wbpwd/Ae/Bkpsd I/N Ie T 33/2023 24 Sl No 03
|
| Description |
Patch Repairing Work Of Entrance Road At Sdo Office Barrackpore, During The Year 2023 2024.
|
| Organisation | PUBLIC WORKS DEPARTMENT | State Govt. and UT |
| Tender Id | 2024_WBPWD_679157_1 |
|
Reference Number |
WBPWD/AE/BKPSD-I/NIeT 37/2023-24 2nd call of WBPWD/AE/BKPSD-I/NIeT 33/2023-24 Sl no 03 |
| Tender Fee | 0 |
| EMD | 5714 |
| Tender Value | - |
| Place | BARRACKPORE |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1477754 |
| Start Date | March 04, 2024 20:40 |
| End Date |
Expired
16/03/2024
Expired 939 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Providing of 132kv seetharambagh supply to 33/11kv nampally ss by laying of 1.8km of 33kv 3x400sq.mm xlpe ug cable (single run) from proposed dp structure at seetharampet operation section office to 33/11kv nampally ss (by utilizing double run 33kv cable sanctioned up to 33/11kv proposed goshamahal ss from 132kv seetharambagh ss in y-2025-12-01-03-01-002 i.e., shifting of 33/11kv goshamahal ss and connected lines) there by providing 132kv seetharambagh ss supply to 33/11kv nampally ss pertaining
Providing of 132kv seetharambagh supply to 33/11kv nampally ss by laying of 1.8km of 33kv 3x400sq.mm xlpe ug cable (single run) from proposed dp structure at seetharampet operation section office to 33/11kv nampally ss (by utilizing double run 33kv cable sanctioned up to 33/11kv proposed goshamahal ss from 132kv seetharambagh ss in y-2025-12-01-03-01-002 i.e., shifting of 33/11kv goshamahal ss and connected lines) there by providing 132kv seetharambagh ss supply to 33/11kv nampally ss pertaining to lines osmania section of lines asifnagar sub division in mehdipatnam operation division and work executed by the master plan sd-vi sub-division of mp-1 division of hyderabad master plan circle under t and d improvements to original works.
Read moreConsultancy services ae for supervision of upgradation to 4lps configuration of the nashik to peth section of nh-848 (length -36.371 km) in the state of maharashtra on epc mode.- 2nd call
Consultancy services ae for supervision of upgradation to 4lps configuration of the nashik to peth section of nh-848 (length -36.371 km) in the state of maharashtra on epc mode.- 2nd call
Read moreSupply,erection,testing and commissioning of lot 1 i) 2nd circuit stringing (15.2 km) on existing 132 kv jakora-kotagiri dc/sc line with 1st circuit live ii)1 no. 132 kv bay at 132/33 kv ss jakora (iii) 1no.132 kv bay at 132/33 kv ss kotagiri in nizamabad district and lot-ii 33 kv features with 2x50 mva ptr at existing at 220/132 kv ss kamareddy in kamareddy district on turnkey basis
Supply,erection,testing and commissioning of lot 1 i) 2nd circuit stringing (15.2 km) on existing 132 kv jakora-kotagiri dc/sc line with 1st circuit live ii)1 no. 132 kv bay at 132/33 kv ss jakora (iii) 1no.132 kv bay at 132/33 kv ss kotagiri in nizamabad district and lot-ii 33 kv features with 2x50 mva ptr at existing at 220/132 kv ss kamareddy in kamareddy district on turnkey basis
Read moreProviding of 2nd alternate source to 33/11kv kundanbagh indoor ss by laying of 1.2km 33kv 3x400sq.mm. xlpe ug cable (double run) from 33/11kv green lands ss to 33/11kv kundanbagh indoor ss pertaining to allwyn lines section and sub division of banjara hills lines division of scada circle and work executed by the master plan sd-iv section and sub-division of mp-1 division of master plan hyderabad circle under t and d improvements to original works (reserved for sc categ
Providing of 2nd alternate source to 33/11kv kundanbagh indoor ss by laying of 1.2km 33kv 3x400sq.mm. xlpe ug cable (double run) from 33/11kv green lands ss to 33/11kv kundanbagh indoor ss pertaining to allwyn lines section and sub division of banjara hills lines division of scada circle and work executed by the master plan sd-iv section and sub-division of mp-1 division of master plan hyderabad circle under t and d improvements to original works (reserved for sc category).
Read moreAm to the roads a shamshabad to shabad from km 17/00 to 33/400 b amdhapur branch road km 0/0 to 9/600 c chevella to kothapally road from km 0/0 to 6/800 d himayathnagar-tangedpally road from km 10/750 to 32/0 under chevella section in ranga reddy district for the year 2026-27 2nd call
Am to the roads a shamshabad to shabad from km 17/00 to 33/400 b amdhapur branch road km 0/0 to 9/600 c chevella to kothapally road from km 0/0 to 6/800 d himayathnagar-tangedpally road from km 10/750 to 32/0 under chevella section in ranga reddy district for the year 2026-27 2nd call
Read moreProviding of 2nd alternate source to 33/11kv srinagar colony indoor ss from 132/33kv nims eht ss by laying of 4.5 km single run 33kv 400sqmm xlpe ug cable pertaining to kalyan nagar lines section and sub division of banjarahills lines division of scada circle and work executed by the master plan sd-iv section and sub-division of mp-1 division of hyderabad master plan circle under t and d improvement works
Providing of 2nd alternate source to 33/11kv srinagar colony indoor ss from 132/33kv nims eht ss by laying of 4.5 km single run 33kv 400sqmm xlpe ug cable pertaining to kalyan nagar lines section and sub division of banjarahills lines division of scada circle and work executed by the master plan sd-iv section and sub-division of mp-1 division of hyderabad master plan circle under t and d improvement works
Read moreProviding of 2nd run ug cable for the existing 33kv industrial area feeder from 132/33kv fever hospital eht sub station to 33/11kv industrial area ss which involves laying of 1.87km of 33kv 3x400sq.mm xlpe ug cable (single run) in lines division of hyderabad south and the work executed by the master plan sd-ii of division-ii in master plan hyderabad circle under t and d improvements to original works (reserved for waddera/sagara category).
Providing of 2nd run ug cable for the existing 33kv industrial area feeder from 132/33kv fever hospital eht sub station to 33/11kv industrial area ss which involves laying of 1.87km of 33kv 3x400sq.mm xlpe ug cable (single run) in lines division of hyderabad south and the work executed by the master plan sd-ii of division-ii in master plan hyderabad circle under t and d improvements to original works (reserved for waddera/sagara category).
Read moreWbpwd/ae/bkpsd i/niet 37/2024-25(sl 02)
Restoration of road crust with mastic surfacing related cutting cesc ltd. ghoshpara road at ch. 15.40 km (appx) (32/2, west ghoshpara road) emergency repair of their underground cable, barrackpore, north 24 pgs. during the year 2024-25.
Read moreWbpwd/ae/bkpsd-i/niet 33/2023-24(sl. no.3)
Patch repairing work of entrance road at sdo office barrackpore, during the year 2023-2024.
Read moreWbpwd/ae/bkpsd-i/niet 31/2023-24 2nd call of wbpwd/ae/bkpsd-i/niet 26/2023-24 sl no 01
Restoration of wooden beam (kori-borga) at roof of office of barrackpore govt. high school, north 24 parganas during the year 2023-24.
Read moreof your Industry type