Tender Details

Particulars Details
Title
Construction Of 4 No Wind Anchor Blocks For The Work Completion Of Balance Work Of 160 Mtr Motorable Suspension Bridge Over River Indus At Nunam Thangkob Basgo Leh Ut Of Ladakh
Description
Construction Of 4 No Wind Anchor Blocks For The Work Completion Of Balance Work Of 160 Mtr Motorable Suspension Bridge Over River Indus At Nunam Thangkob Basgo Leh Ut Of Ladakh
Organisation Public Works Department | State Govt. and UT
Tender Id 2024_PWD_14404_1
Reference
Number
E Tender 123 of R and B Division Leh
Tender Fee 1000
EMD 1.88 Lakh
Tender Value
Place Leh
Link https://tenders.ladakh.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=35818
Start Date October 04, 2024 23:30
End Date

24/10/2024 ( Expired 244 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of balance portion of 4 no bypass channel between chainage 12 and 17 for an approximate length of 140 meters along with other associated work at little rangit hydel project under mini micro hydel division, kurseong, dist. darjeeling

Construction of balance portion of 4 no bypass channel between chainage 12 and 17 for an approximate length of 140 meters along with other associated work at little rangit hydel project under mini micro hydel division, kurseong, dist. darjeeling

Read more
Construction of 65 mtr. span motorable bridge through type with rcc foundation, single lane with 4.75 mtr. carriage - way width over river marsudar at sumbal machna marwah along with the approaches on both sides in district kishtwar under nabard

Construction of 65 mtr. span motorable bridge through type with rcc foundation, single lane with 4.75 mtr. carriage - way width over river marsudar at sumbal machna marwah along with the approaches on both sides in district kishtwar under nabard

Read more
Consultancy services for appointment of authority engineer for supervision of construction of 2 lane 386 mtr long extradosed bridge over river siang at design km 2 pt 908 and 63 pt 5 mtr long major bridge at design km 2 pt 590 in project brahmnak

Consultancy services for appointment of authority engineer for supervision of construction of 2 lane 386 mtr long extradosed bridge over river siang at design km 2 pt 908 and 63 pt 5 mtr long major bridge at design km 2 pt 590 in project brahmnak

Read more
Eia and sia stus for preparation of the dpr for construction of a 4-lane major bridge over river bhagirathi, including viaducts, robs, etc., connecting kalna of stkk road and gobindapur of nh 12 in the district of purba bardhaman and nadia in wb

Eia and sia stus for preparation of the dpr for construction of a 4-lane major bridge over river bhagirathi, including viaducts, robs, etc connecting kalna of stkk road and gobindapur of nh 12 in the district of purba bardhaman and nadia in wb

Read more
Construction of 4- lane railway over bridge for railway crossing no.lc 97 on jaipur-kuchaman khatu tarnau nagaur road (sh-90)at chhoti khatu railway chainage km 448/3-5 of ratangarh-degana section in district didwana-kuchaman (raj) job no crif 1124

Construction of 4- lane railway over bridge for railway crossing no.lc 97 on jaipur-kuchaman khatu tarnau nagaur road (sh-90)at chhoti khatu railway chainage km 448/3-5 of ratangarh-degana section in district didwana-kuchaman (raj) job no crif 1124

Read more
Design and cost estimate for construction of gumdesh kayal to talladesh ramela motor length 11.00 km and 40 mtr span motor bridge over lohawati river in constituency lohaghat of district champawat under state sector

Design and cost estimate for construction of gumdesh kayal to talladesh ramela motor length 11.00 km and 40 mtr span motor bridge over lohawati river in constituency lohaghat of district champawat under state sector

Read more
Construction of new 4 lane bridge over umardashi river with approachesat km. 153.300 design km. 153.080 of nh 58 near palanpur merwada village in the state of gujarat. job no. 058.gj.2024.25.776 upc_m.00058.25776.gj

Construction of new 4 lane bridge over umardashi river with approachesat km. 153.300 design km. 153.080 of nh 58 near palanpur merwada village in the state of gujarat. job no. 058.gj.2024.25.776 upc_m.00058.25776.gj

Read more
Construction of 110 mtr span double lane motorable bridge over river beas at pandoh on pandoh nagdhar road at rd 0/150 (under pmgsy-iii, batch-i) (package no. hp-08-570).

Construction of 110 mtr span double lane&#x0d motorable bridge over river beas at pandoh on pandoh&#x0d nagdhar road at rd 0/150 (under pmgsy-iii, batch-i)&#x0d (package no. hp-08-570).

Read more
Detailed project report for construction of 420m long span bridge over swan river at km 4/500 for construction of four lanning from ajouli mod to bulk drug park stie at village polian beet tehsil haroli distt.una sh preparation of hydraulic data, soi

Detailed project report for construction of 420m long span bridge over swan river at km 4/500 for construction of four lanning from ajouli mod to bulk drug park stie at village polian beet tehsil haroli distt.una sh preparation of hydraulic data, soi

Read more
Construction of abutment and re launching of dismantled choglamsar bridge over river indus at phey village ( by way of e / work and r/ wall )

Construction of abutment and re launching of dismantled choglamsar bridge over river indus at phey village ( by way of e / work and r/ wall )

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise