Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Eia And Sia Stus For Preparation Of The Dpr For Construction Of A 4 Lane Major Bridge Over River Bhagirathi, Including Viaducts, Ro Bs, Etc., Connecting Kalna Of Stkk Road And Gobindapur Of Nh 12 In The District Of Purba Bardhaman And Nadia In Wb
|
Description |
Eia And Sia Stus For Preparation Of The Dpr For Construction Of A 4 Lane Major Bridge Over River Bhagirathi, Including Viaducts, Ro Bs, Etc Connecting Kalna Of Stkk Road And Gobindapur Of Nh 12 In The District Of Purba Bardhaman And Nadia In Wb
|
Organisation | RITES Ltd. | Public Sector Undertakings |
Tender Id | 2025_RITES_238218_1 |
Reference Number |
RITES/ HW/ RT300 00126/ KALNA BRG DPR/ EIA/2025 |
Tender Fee | 0 |
EMD | 19480 |
Tender Value | |
Place | Nadia , West Bengal |
Link | https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=270673 |
Start Date | June 13, 2025 14:30 |
End Date |
30/06/2025 ( Expired 5 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Cs for supervision of construction of major bridge with 4lane configuration on nh 14 over kangsabati and shilabati river in paschim medinipur of west bengal on epc mode
Cs for supervision of construction of major bridge with 4lane configuration on nh 14 over kangsabati and shilabati river in paschim medinipur of west bengal on epc mode
Read moreConsultancy services for preparation of dpr for i. widening to 2l ps of balance reaches km 184.840 to km 190.00 and km 194.840 to 198.800, ii. construction of additional vent to existing major bridge at km 210.0 to 2 of nizamabad to jagdalpur nh 63
Consultancy services for preparation of dpr for i. widening to 2l ps of balance reaches km 184.840 to km 190.00 and km 194.840 to 198.800, ii. construction of additional vent to existing major bridge at km 210.0 to 2 of nizamabad to jagdalpur nh 63
Read moreConsultancy services for preparation of detailed project report (dpr) for construction of 4 lane elevated corridor from natesan nagar rob (km 38.220 of nh-45a) to ariyankuppam bridge (km 40.780 of nh-45a) and widening of existing road to 4 lane road
Consultancy services for preparation of detailed project report (dpr) for construction of 4 lane elevated corridor from natesan nagar rob (km 38.220 of nh-45a) to ariyankuppam bridge (km 40.780 of nh-45a) and widening of existing road to 4 lane road
Read moreWidening of narrow major bridge 2no to four lane configuration nh 548c section tembhurni to kuslamb at ch. 194.470 sina river bridge and ch. 197.125 widening of narrrow minor bridge 2 no at ch. 168.270 and ch. 180.525 and reconstruction of narrow m
Widening of narrow major bridge 2no to four lane configuration nh 548c section tembhurni to kuslamb at ch. 194.470 sina river bridge and ch. 197.125 widening of narrrow minor bridge 2 no at ch. 168.270 and ch. 180.525 and reconstruction of narrow m
Read moreEngineering, procurement and construction(epc) of a new four lane bridge over river ganga located 50 meters upstream of the existing damage ganga bridge, along with the construction of approach roads connecting kanpur nagar to shuklaganj in unnao di
Engineering, procurement and construction(epc) of a new four lane bridge over river ganga located 50 meters upstream of the existing damage ganga bridge, along with the construction of approach roads connecting kanpur nagar to shuklaganj in unnao di
Read moreRevised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)
Revised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)
Read moreW.s. of 2 lane to 4 lane with divided carriageway from ch 67.471 (mathurapur) to ch 69.256 (muktapurrob) and construction of h.l rcc bridge(8x24.00m) over river budhi gandak in place of old damaged screw pile bridge at near magardahi ghat of nh 322.
W.s. of 2 lane to 4 lane with divided carriageway from ch 67.471 (mathurapur) to ch 69.256 (muktapurrob) and construction of h.l rcc bridge(8x24.00m) over river budhi gandak in place of old damaged screw pile bridge at near magardahi ghat of nh 322.
Read moreIe services for operation and maintenance of 6 lane extra dosed cable stayed sister nivedita bridge tollway project over river hooghly alongwith its approaches on new nh-12 (old nh-2) on bot toll basis in the state of west bengal
Ie services for operation and maintenance of 6 lane extra dosed cable stayed sister nivedita bridge tollway project over river hooghly alongwith its approaches on new nh-12 (old nh-2) on bot toll basis in the state of west bengal
Read moreConsultancy services for appointment of authority engineer for supervision of construction of 2 lane 386 mtr long extradosed bridge over river siang at design km 2 pt 908 and 63 pt 5 mtr long major bridge at design km 2 pt 590 in project brahmnak
Consultancy services for appointment of authority engineer for supervision of construction of 2 lane 386 mtr long extradosed bridge over river siang at design km 2 pt 908 and 63 pt 5 mtr long major bridge at design km 2 pt 590 in project brahmnak
Read moreEia and sia stus for preparation of the dpr for construction of a 4-lane major bridge over river bhagirathi, including viaducts, robs, etc., connecting kalna of stkk road and gobindapur of nh 12 in the district of purba bardhaman and nadia in wb
Eia and sia stus for preparation of the dpr for construction of a 4-lane major bridge over river bhagirathi, including viaducts, robs, etc connecting kalna of stkk road and gobindapur of nh 12 in the district of purba bardhaman and nadia in wb
Read moreof your Industry type