Tender Details
About Tender
🌧️ Invitation For Bids: Storm Water Line Project In Indore 🌧️ The Directorate Urban Administration And Development, State Govt. And Ut, Invites Bids For The Laying Of Storm Water Line From Radhika Society To Khatipura In Ward No. 21, Under Zone No. 05, Indore, For The Second Call Of The Project. 📅 Bid Submission Deadline: July 12, 2024, 6:00 Pm Tender Fee: Inr 14,034 Emd: Inr 8,07,000 Interested Bidders Must Review The Detailed Project Specifications And Submit Their Bids, Including All Required Documentation, By The Stipulated Deadline. This Project Is A Critical Component Of The City's Stormwater Management System And Will Contribute To The Overall Urban Development In Indore. Keywords: Storm Water Line, Indore, Urban Development, Infrastructure Project, Bidding, Government Tender, Emd, Tender FeeParticulars | Details |
---|---|
Title |
Laying Of Storm Water Line From Radhika Society To Khatipura In Ward No. 21 Under Zone No. 05 Second Call
|
Description |
Laying Of Storm Water Line From Radhika Society To Khatipura In Ward No. 21 Under Zone No. 05 Second Call
|
Organisation | Directorate Urban Administration and Development | State Govt. and UT |
Tender Id | 2024_UAD_353977_1 |
Reference Number |
27/SE/BILLS/24-25/G-03 |
Tender Fee | 14034 |
EMD | 80700 |
Tender Value | |
Place | INDORE |
Link | https://mptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=416137 |
Start Date | June 29, 2024 14:30 |
End Date |
12/07/2024 ( Expired 336 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreConst. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreConstruction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Read moreConstruction of rcc drain from ramji vishwakarma house to hari tiwari house at ward no.37 chandawal
Construction of rcc drain from ramji vishwakarma house to hari tiwari house at ward no.37 chandawal
Read moreConstr of new rd nelya dhaula (pkg/02) to nhsl specifications from km 12.00 to km 41.691 with link rd 0.00 to 2.775 (bhawani post) (net length 32.467 km) in the state of arunachal pradesh under 127 rcc/ 42 brtf project vartak (gs icbr ii)
Constr of new rd nelya dhaula (pkg/02) to nhsl specifications from km 12.00 to km 41.691 with link rd 0.00 to 2.775 (bhawani post) (net length 32.467 km) in the state of arunachal pradesh under 127 rcc/ 42 brtf project vartak (gs icbr ii)
Read moreof your Industry type