Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Laying Of Storm Water Line At Lodhi Mohalla In Ward No. 57 Under Zone No. 03f Second Call
|
Description |
Laying Of Storm Water Line At Lodhi Mohalla In Ward No. 57 Under Zone No. 03f Second Call
|
Organisation | Directorate Urban Administration and Development | State Govt. and UT |
Tender Id | 2025_UAD_432805_1 |
Reference Number |
36/SE/BILLS/25-26/G-13 |
Tender Fee | 5309 |
EMD | 19700 |
Tender Value | |
Place | INDORE |
Link | https://mptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=510169 |
Start Date | June 26, 2025 20:30 |
End Date |
09/07/2025 ( Expired 6 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreConst. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Read moreReplacement of goose neck panel and bends (under capex 2025-26), rear water wall panel and overhauling of boiler pr. parts at unit #3, ktps.
Replacement of goose neck panel and bends (under capex 2025-26), rear water wall panel and overhauling of boiler pr. parts at unit #3, ktps.
Read moreRcc nala construction work at kamdhenu shopping centre , footpath and other repaire work in various parks and other development work at ward 35 civil line zone
Rcc nala construction work at kamdhenu shopping centre , footpath and other repaire work in various parks and other development work at ward 35 civil line zone
Read moreConstruction of proposed r.o.b. and its approaches in replacement of existing level crossing no.21x at km ch.107/500 of nh 64 district anand in the state of gujarat
Construction of proposed r.o.b. and its approaches in replacement of existing level crossing no.21x at km ch.107/500 of nh 64 district anand in the state of gujarat
Read moreIe for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham
Ie for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham
Read moreConst. of 6 lane zirakpur bypass starting from junc. with nh7 zirakpur patiala dc 0.000 and ending at junc. with nh5 zirakpur parwanoo dc 16.800 tl 19.200 km in punjab and haryana under nh(o) on ham
Const. of 6 lane zirakpur bypass starting from junc. with nh7 zirakpur patiala dc 0.000 and ending at junc. with nh5 zirakpur parwanoo dc 16.800 tl 19.200 km in punjab and haryana under nh(o) on ham
Read moreWidening a upgradation of road from 2 lane with ps to 4 lane with ps for rectification of blackspot id no. pb 03 186 at location km. 154.310 rureke kalan on nh703 in the state of punjab job no rureke kalan on nh 703 punjab 2024 25 rse 33 including ut
Widening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of blackspot id no. pb 03 186 at location km. 154.310 rureke kalan on nh703 in the state of punjab job no rureke kalan on nh 703 punjab 2024 25 rse 33 including
Read moreof your Industry type