Tender Details
Particulars | Details |
---|---|
Title |
Construction Of 5nos Borewells With Installation Of Single Phase Panghat Under Sub Division Nathdwara On Single Point Responsibility Basis With One Year Defect Liability, Under Dmft .
|
Description |
Construction Of 5nos Borewells With Installation Of Single Phase Panghat Under Sub Division Nathdwara On Single Point Responsibility Basis With One Year Defect Liability, Under Dmft .
|
Organisation | PHED-Chief Engineer(HQ),Jaipur | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 1500 |
EMD | 27360 |
Tender Value | |
Place | Nathdwara |
Link |
AAAAAAAAAA Login to view |
Start Date | June 10, 2025 23:30 |
End Date |
27/06/2025 ( 15 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreConstruction of various transmission elements (02 no. 400 kv and 02 no. 220 kv transmission lines) for proposed 400 kv gss amber (jaipur north) with installation of opgw network on existing line including survey, supply under bn-9018002511
Construction of various transmission elements (02 no. 400 kv and 02 no. 220 kv transmission lines) for proposed 400 kv gss amber (jaipuir north) with installation of opgw network on existing line including survey, supply under bn-9018002511(turnkey)
Read moreDevelopment of internal infrastructure for uttar pradesh defence industrial corridor, aligarh node, phase ii with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode.
Development of internal infrastructure for uttar pradesh defence industrial corridor, aligarh node, phase ii with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode.
Read moreIe services for construction of four laning of nanasa to pidgaon section of nh47 old nh59a indore harda pkgiii length 47.445km design ch. 95.000 km to 142.445 km under bharatmala pariyojna phase-i economic corridor in the state of mp on ham basis
Ie services for construction of four laning of nanasa to pidgaon section of nh47 old nh59a indore harda pkgiii length 47.445km design ch. 95.000 km to 142.445 km under bharatmala pariyojna phase-i economic corridor in the state of mp on ham basis
Read moreS r of various l r in mc mukerian under sr for the year 2022 23 2023 24 and 2024 25 in distt hoshiarpur including maintenance of road for 5 years one year defect liability period four years mainte group no. 3
S r of various l r in mc mukerian under sr for the year 2022 23 2023 24 and 2024 25 in distt hoshiarpur including maintenance of road for 5 years one year defect liability period four years mainte group no. 3
Read moreSpecial repair of various link road in market committee mukerian under special repair for the year 2022 23 2023 24 and 2024 25 in distt hoshiarpur including maintenance of road for 5 years one year defect liability period four years mainte
Special repair of various link road in market committee mukerian under special repair for the year 2022 23 2023 24 and 2024 25 in distt hoshiarpur including maintenance of road for 5 years one year defect liability period four years mainte
Read moreProviding gang for the work of attending to resolving the fuse off call complaints lt ht line breakdowns for restoration of electrical power supply in the various sub divisions under ds division under ds circle pspcl patiala on per day basis
Providing gang for the work of attending to resolving the fuse off call complaints lt ht line breakdowns for restoration of electrical power supply in the various sub divisions under ds division under ds circle pspcl patiala on per day basis
Read moreUpgradation of tanda town road odr 13 with 3 year maintenance 1 year defect liability period plus 2 years maintenance period under head 5054 rb 10 roads
Upgradation of tanda town road odr 13 with 3 year maintenance 1 year defect liability period plus 2 years maintenance period under head 5054 rb 10 roads
Read moreConstruction of control room building and other civil works for setting up new 33/11 kv spread out type sub-station with (2x10) mva power transformer at goaldaha under uluberia division under howrah region.
Construction of control room building and other civil works for setting up new 33/11 kv spread out type sub-station with (2x10) mva power transformer at goaldaha under uluberia division under howrah region.
Read moreof your Industry type