Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
General Mp Rbc Ap 2023 24 Urgent Repair Work To Kavilpad Bc From Ch 3/330 Km To 3/650 Km Neelikadu Aalangod For 2023 24 Sc And 2024 Fc Gcw
|
| Description |
The Kavilpad Branch Canal From Ch.3/300 Km&Amp#X0d
To 3/650 Km Is Mostly Damaged And Broken&Amp#X0d
Which Has To Be Demolished And Urgent Repair&Amp#X0d
Works In The Form Of Concrete Walls Are To Be&Amp#X0d
Provided In This Portion Of The Canal. Hence, The&Amp#X0d
Work Is Proposed.
|
| Organisation | Irrigation Department | State Govt. and UT |
| Tender Id | 2024_Irrig_647426_1 |
|
Reference Number |
IRR/PI/TR/7687/2023_5_1_1/1 |
| Tender Fee | 1870 |
| EMD | 21172 |
| Tender Value | - |
| Place | Malampuzha |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=992899 |
| Start Date | January 20, 2024 21:25 |
| End Date |
Expired
27/01/2024
Expired 989 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Mp-rbc-ap-2023-24-urgent repair work to kavilpad bc at tailend -ch 7/00 km for 2023-24 second crop and 2024 f c-gcw
The tailend portion of the kalivpad branch&#x0d canal is mostly water logged, so wetness exist&#x0d in the canal. the foundation earth is marshy&#x0d bulky soil, thus quarry muck is provided in the&#x0d estimate as bed firming is required.
Read moreGeneral-mp-rbc- ap-2023-24-urgent rectification work to head works subdivision building including roof changing-general civil work
The items proposed are dismantling tiled roofing, wood work in frames, dismantling doors and windows, demolishing brickwork, old plaster, earthwork in excavation, pcc 1 4 8,rcc 11.53 including centering and shuttering an
Read moreGeneral mp rbc ap 2023 24 annual maintenance urgent desilting removal of vegitation vegitative material from rbmc between ch 0 000km to 10_000km.and including kavilpad branch and pudupariyaram branch canal for 2023 24 second crop and 2024 first c
Clearing grass earth work exacavation
Read moreGeneral mp rbc ap 2023 24 urgent rectification work to the c and b section office in camp area general civil work
Demolishing cc earth work exacavation cc 1_4_8 cc 1_3_6 cc 1_2 _4 rcc 1_1 5_3 centering and shuttering plastering solid block masonry primer painting truss work supplying door s etc
Read moreGeneral-mp-rbc-ap- 2023-24-urgent rectification of thenur branch canal-and fixation of iron grill between ch 2/000 to 2/100 km-general civil work
This work has been proposed in b/w ch 2/000&#x0d km to 2/100 km of thenur branch canal
Read moreGeneral-mp-rbc-ap-2023-24 - urgent repair work to pudupariyaram branch canal near starting point for 2023-24 second crop and 2024 first crop-general civil work
The initial portion of the puduppariyaram&#x0d branch canal offtaking from rb main canal at&#x0d ch. 6/000 km is damaged and needs urgent&#x0d repair. the work is proposed to make the&#x0d ing portion leak proof and to enable better&#x0d flow of water to the tail
Read moreGenerel- mp -rbc -ap -2023-24 -urgent rectiffication and construction of side wall in mankara branch canal between ch 5/900 to 6/000 km -general civil work
Earth work excavation,demolishing cc and brick work,pcc 1 3 6 ,centring and shuttering,rcc,pcc 1 1 5 3,filling
Read moreeneral- mp-rbc-ap -2023-24-urgent rectification and construction of side wall in mankara branch canal between ch.5/900 to 6/000 km -general civil work
Rectification of the well at mankara branch canal
Read moreGeneral-mp-rbc-ap-2023-24- -urgent rectification work to hand rails of bridges crossing main canal at ch 16/469 and ch 19/920 of rbmc-general civil work
This work has been included under the action&#x0d plan 2023-24 of the malampuzha project. the&#x0d fs for the work has been obtained vide order&#x0d no wp5-2702/np/2023-24 mp dated&#x0d 07/07/2023 of the ce, p-1, kozhikode.the&#x0d estimate is prepared for
Read moreGeneral-mp-rbc- ap-2023-24- -urgent rectification work to hand rails of bridges crossing main canal at ch 16/469 and ch 19/920 of rbmc-general civil work
The estimate includes demolishing rr, cc wall, earthwork ,cc1 4 8, centring shuttering, cc 1 2 4, rcc 1 2 4, structural steel work for hand rails and plastering. the estimate has been prepared based on dsor 2018 with cost index of
Read moreof your Industry type