Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Eneral Mp Rbc Ap 2023 24 Urgent Rectification And Construction Of Side Wall In Mankara Branch Canal Between Ch.5/900 To 6/000 Km General Civil Work
|
| Description |
Rectification Of The Well At Mankara Branch
Canal
|
| Organisation | Government of Kerala |
| Tender Id | 2023_Irrig_610306_2 |
|
Reference Number |
IRR/PI/TR/4815/2023_5_1_1/1 |
| Tender Fee | 555 |
| EMD | 4233 |
| Tender Value | - |
| Place | Head works sub division Malampuzha |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in |
| Start Date | October 26, 2023 22:20 |
| End Date |
Expired
30/10/2023
Expired 1042 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Generel- mp -rbc -ap -2023-24 -urgent rectiffication and construction of side wall in mankara branch canal between ch 5/900 to 6/000 km -general civil work
Earth work excavation,demolishing cc and brick work,pcc 1 3 6 ,centring and shuttering,rcc,pcc 1 1 5 3,filling
Read moreGeneral-mp-rbc-ap- 2023-24-urgent rectification of thenur branch canal-and fixation of iron grill between ch 2/000 to 2/100 km-general civil work
This work has been proposed in b/w ch 2/000&#x0d km to 2/100 km of thenur branch canal
Read moreGeneral-mp-rbc- ap-2023-24-urgent rectification work to head works subdivision building including roof changing-general civil work
The items proposed are dismantling tiled roofing, wood work in frames, dismantling doors and windows, demolishing brickwork, old plaster, earthwork in excavation, pcc 1 4 8,rcc 11.53 including centering and shuttering an
Read moreGeneral mp rbc ap 2023 24 urgent rectification work to the c and b section office in camp area general civil work
Demolishing cc earth work exacavation cc 1_4_8 cc 1_3_6 cc 1_2 _4 rcc 1_1 5_3 centering and shuttering plastering solid block masonry primer painting truss work supplying door s etc
Read moreGeneral-mp-rbc-ap- 2023-24-am-urgent desilting and removal of vegetative materials from mankara branch canal for 2023-24 second crop and 2024 first crop -general civil work
Cleaning of mankara branch canal for second crop, first crop and as and when required,clearing,desilting,amanmazdoor etc
Read moreGeneral-mp-rbc- ap-2023-24- annual maintenance-urgent desilting removal of vegetation, vegetative material from rbmc between ch 10/000 km to 14/000 km for 2023- 24 second crop and 2024 first crop-general civil work
Cleaning of rbmc from 10/000 to 14/000 km for second, first crops and as and when required clearing desilting
Read moreGeneral-mp-rbc-ap- 2023-24-annual maintenance -urgent desilting removal of vegetation vegetative material from rbmc between ch 14/000 km to 17/000 km for 2023- 24 second crop and 2024 first crop-general civil work
Cleaning of rbmc from 14 000 to 17 000 km for second, first crops and as and when required, desilting,clearing
Read moreGeneral-mp-rbc-ap-2023-24- am-urgent desilting and removal of vegetative materials from rb main canal between ch 26/000 km to 29/000 km for 2023-24 second crop and 2024 first crop-general civil work
Cleaning of rb main canal from 20/000 to 26/000 km for second, first crops and as and when required,clearing and desilting
Read moreGeneral-mp-rbc-ap-2023 -24-am-urgent desilting and removal of vegetative materials from rb main canal between ch 26/000 km to 29/000 km for 2023-24 second crop and 2024 first crop-general civil work
Cleaning of rbmc from 26/000 to 29/000 km for second, first crops and as and when required clearing,desilting
Read moreGeneral-mp-rbc- ap-2023-24-am-urgent desilting and removal of vegetative materials from rb main canal between ch 29/000 km to 32/000 km for 2023-24 second crop and 2024 first crop-general civil work
Cleaning of rb main canal between ch 29/000 and 32/000 km for second crop, first crop and as and when required
Read moreof your Industry type